Chapter 2 of 16 · Insolvency and Bankruptcy, Law and Practice

Corporate Insolvency Resolution Process

143 questionsasked in 13 of 13 attempts3 law changedOrder: by topic, latest first

Chapter weightageCh. 1Ch. 3
Questions per attemptTap a bar to filter
June 2024Q. 3(a)(iii)5 marksSyllabus 2022
Show the facts common to all parts of Q. 3

(a)Suhani and Dhwani are childhood friends and were very fond of designing Indian traditional dresses. After completing their schooling, Suhani joined a fashion designing course to pursue her interest and Dhwani decided to be a fashion Model. She participated in various fashion show programs conducted by Non-Government Organisation(s) engaged in the creating awareness for cervical cancer which is spreading rapidly among Ladies in India.

After some years, in one of the fashion programmes, they met again and planned to form a private Limited Company in the name of Suhani Fashions Private Limited having a paid-up share capital of 5 Crore and became Entrepreneurs.

Suhani Fashions Pvt. Ltd. is engaged in the business of Manufacturing and Selling Ladies Suits and Sarees in Kolkata, West Bengal which is a very big market for Indian traditional dresses.

They also offered their products on online e-commerce platforms. They employed more than 100 Ladies and other staff in their workshop who were engaged in designing, cutting, tailoring and other allied works. Suhani also used to design products being sold by the company.

Both Suhani and Dhwani were Promoter Directors of the company as per the Article of Association of the company and also the subscribers to the Memorandum of Association of the company by subscribing 50% shares each in the company. Dhwani, being a fashion model, did modelling for her products in order to improve the sales of the company. The company started growing very fast and sales touched a figure of ₹ 20 crores in the very first year and in order to meet the working capital and other requirements, the company approached the bankers Beta bank and Gama Bank for a facility of ₹ 3 crores and ₹ 5 crores respectively. The Company already had taken the credit facilities with Alpha Bank and outstanding amount is ₹ 6 crores.

After the change in demand of the products and growing need of Formal dresses from the Indian traditional dresses, sales started declining and the company started facing cash crunch and made a default in paying the instalments for ₹ 2 crores which were outstanding in the name of the Alpha bank.

The Alpha bank decided to file an Insolvency Petition under Section 7 of the Insolvency and Bankruptcy Code, 2016 as a financial Creditor on 3rd January, 2024. The Corporate Insolvency Resolution Process application was admitted by the Adjudicating Authority on 25th January, 2024. Moratorium was declared and Ishann was appointed as an Interim Resolution Professional. Ishaan, Interim Resolution Professional made a public announcement and prepared a list of creditors based on the claims received. The CoC is yet to be formed.

Consider the above facts and answer the following questions :

(iii)State, whether any other creditor can initiate proceeding under the Insolvency and Bankruptcy Code, 2016, after the withdrawal of an application for Corporate Insolvency Resolution Process by an applicant ? Discuss with the help of the case laws.

December 2021Q. 4(b)6 marksSyllabus 2017

(b)Financial Creditors initiated Corporate Insolvency Resolution Process (CIRP)

against a corporate debtor and invited the expression of interest (EOI) of Resolution Plan from the eligible persons. One company, showed interest and submitted the EOI, which was agreed upon by the Committee of Creditors (CoC)

and proposal was submitted by the CoC with the Adjudicating Authority (AA).

As per the Resolution Plan, the Resolution Applicant agreed to pay in cash to acquire the controlling stake in the Corporate Debtor to tune of 75% and the Operational Creditors will be paid in instalments in settlement of their claims stretchable upto the next 12 months.

The AA accepted the Resolution Plan. However, the promoters of the Corporate Debtors and other Operational Creditors objected and appealed before the NCLAT raising the following points :

(i)The promoters of Corporate Debtor contended that the Resolution Applicant is not eligible to submit the Resolution Plan, since its subsidiary company in the UK was fined by the English court under the provisions of UK Act, which provides for imprisonment for a term not exceeding 12 months or a fine or both. Hence in terms of Section 29A(d) of the Insolvency and Bankruptcy Code, 2016 (IBC) the Resolution Applicant is ineligible to submit the Resolution Plan.

(ii)The Operational Creditors also objected taking the plea that there was unfair distribution of settlement amount in instalments for their claims under the provisions of the IBC.

Explain with relevant case law, whether the Resolution Applicant was eligible to submit the Resolution Plan?

December 2022Q. 3(b)6 marksSyllabus 2017

(b)Examine under the provision of the Insolvency and Bankruptcy Code, 2016 and the decided case law(s) about the correctness of the following statement :

“Resolution Plan under Corporate Insolvency Resolution Process generally aims that the corporate debtor should be liquidated whereas the resolution plan should comply with certain principles other than that of liquidation”. State all principles other than that of liquidation which a resolution plan should have complied with.

June 2026Q. 2(a)10 marksSyllabus 2022

(a)Please map the correct case references alongside the decision of the court(s) based on the judicial pronouncements indicated under choice(s).

Sl. No. Decision Choice Case Reference

No.

1.NCLT and NCLAT cannot judicially (a) Laxmi Pat Surana Vs.

innovate beyond the framework of Union Bank of India & Anr.

the Insolvency and Bankruptcy Code while dealing with schemes of compromise and arrangement.

2.Timelines for submission of claims (b) Ghanashyam Mishra and are directory, not mandatory. Delay Sons Pvt. Ltd. vs. Edelweiss alone cannot justify rejection of ARC & Ors.

statutory dues; RP must verify and include them.

3.Development rights are valuable (c) Sunil Kumar Jain & Ors. Vs.

commercial rights falling within the Sundaresh Bhatt & Ors.

wide definition of “property” under Section 3(27) and are assets of the Corporate Debtor and are to be included in the Information Memorandum as long as they subsist.

4.Section 327(7) of the Companies Act (d) Abhishek Singh v.

excluding application of Sections 326 Huhtamaki PPL Ltd., & & 327 are not arbitrary. Anr.

5.Section 7 application beyond three (e) State Tax Officer vs.

years from NPA is barred by Rainbow Papers Ltd.

limitation.

6.The Corporate debtor is a statutory (f) Moser Baer Karamchari corporation and not Government. Union vs. Union of India.

The dues are not payable into consolidated fund and hence cannot be treated as “Government dues” and as such they rank as secured creditor claims in liquidation.

7.All creditors (including Central and (g) Victory Iron Works Ltd vs.

State Government or local Jitendra Lohia & Anr.

authorities are bound by a resolution plan once approved under Section 31(1).

8.RERA decrees do not affect creditor (h) Arun Kumar Jagatramka classification. Claims of decree- V. Jindal Steel and Power holding homebuyers remain Ltd.

financial debts under IBC, entitled to parity in resolution plans.

9.The Liquidator is bound to (i) Vidarbha Industries Power adjudicate and verify each and every Ltd. vs. Axis Bank Ltd.

claim based on evidence of work performed during CIRP and entitlement is not automatic.

10.Payment of settlement amount (j) Bank of Baroda & Anr. Vs.

during moratorium is not a violation MBLInfrastructure Ltd., & of Section 14. It extinguishes liability Ors.

and preserves value as Section 14 is meant to prevent dissipation of (k) Swiss Ribbons Pvt. Ltd. vs.

assets and does not bar genuine Union of India.

settlements.

(l)Paschimanchal Vidyut Vitran Nigam Ltd. Vs.

Raman Ispat Pvt. Ltd.

(m)Vishal Chelani & Ors. Vs.

Debashis Nanda.

June 2024Q. 4(b)9 marksSyllabus 2022

(b)Match the following dictum/issue involved with the Case Law(s) based on ratios/decisions pronounced under IBC :

Sr. Dictum/issue involved Case Law(s)

No.

(i)There is no scope for elaborate pleadings. An Sanjay Kumar Ruia Vs. Catholic application to the Adjudicating Authority under Syrian Bank Ltd. & Anr, Section 7 of the Code in the prescribed form, cannot therefore, be compared with the plaint in a suit

(ii)Once the amount is shown as ‘fees’ and 'resolution State Bank of India Vs. Jet cost' the same to be paid in terms of Section 53 of Airways (India) Ltd., (NCLT.

the Code. Mumbai)

(iii)Can an Insolvency Resolution professional who Dena Bank (now Bank of Baroda had been in employment of a financial creditor Vs. C. Shivakumar Reddy and be appointed as Resolution professional ? Anr

(iv)Can the Appellate Tribuanl set aside the order of Liberty House Group Pte. Ltd.

liquidation of a corporate debtor using the powers Vs. State Bank of India & Others under Rule 11 of NCLAT Rules, 2016 ? (NCLAT, New Delhi)

(v)Without initiating CIRP against the principal State Bank of India Vs. Metenere borrower, it is open to the FC to initiate CIRP under Limited (Supreme Court)

section 7 against corporate guarantors as the creditor is also the FC qua corporate guarantor.

(vi)Admitting of corporate insolvency resolution Rai Bahadur Shree Ram and process of the corporate debtor in India in the Company Pvt. Ltd. Vs. Rural light of order passed by a foreign Court ? Electrification Corporation Ltd.

and Ors.

June 2024Q. 2(c)(iii)5 marks for the whole sub-partSyllabus 2022
Show the facts common to all parts of Q. 2

(c)Panapathi G. Seeds Pvt. Ltd. a closely held private company was engaged in the business of processing oilseeds for edible oils. It was established in 1988 under the leadership of Panapathi G. Prasad. Within a decade, Panapathi G. Seeds Pvt. Ltd positioned itself as a leader in production of groundnut oil in the Western region of India with two premium brands.

In 2016 Panapathi G. Prasad had a severe heart attack and died without any succession plan in place. Ram and Sham, the two sons of Panapathi G. Prasad were also directors in the company with equal shareholding. After the death of Panapathi G. Prasad, both brothers had strained relations over the management control which adversely affected the business of the company. With declining profit and turnover both the brothers were worried and decided to reach a family settlement whereby the control of the company was handed over to the elder brother Ram. Sham resigned as the director of the company and in lieu of the same he was entrusted with the management and control of another family firm Saraswathi Edibles, wherein both brothers were partners. Praveen, son of Ram was inducted as director in the Company.

In 2018 Sham wanted to withdraw unsecured loan given by him to the company because the company stopped paying him interest on the loan. Despite follow up Sham was not paid either the principal or interest, which forced him to file an application under section 7 of the Insolvency and Bankruptcy Code 2016.

The Adjudicating Authority (i) admitted the application, (ii) declared moratorium and (iii)

appointed Nagarajan, as an Interim Resolution Professional (IRP). Ram refused to hand over the management control to the IRP on the plea that it was a family dispute, and they will settle soon on their own. He also asked the IRP not to make the public announcement.

IRP tried to persuade Ram citing the provisions of the Code and warned him that if he does not hand over control of the Corporate Debtor IRP will be forced to approach the Adjudicating Authority for appropriate orders. Thereafter Ram allowed the IRP to take inventory of the assets and stocks after 15 days from the insolvency commencement date.

With reference to the above facts and other details provided, answer the following questions with particular reference to the provisions contained in the Code, Regulations and rules of IBC and others :

(iii)Sophie Bank charged interest @ 9 per cent on the cash credit limit availed by the company, as per the terms of sanction, even after the insolvency commencement date and justified it on the ground that if the interest is not charged the account has to be classified as NPA. Is the bank’s claim legally justified ?

June 2024Q. 2(c)(ii)5 marks for the whole sub-partSyllabus 2022
Show the facts common to all parts of Q. 2

(c)Panapathi G. Seeds Pvt. Ltd. a closely held private company was engaged in the business of processing oilseeds for edible oils. It was established in 1988 under the leadership of Panapathi G. Prasad. Within a decade, Panapathi G. Seeds Pvt. Ltd positioned itself as a leader in production of groundnut oil in the Western region of India with two premium brands.

In 2016 Panapathi G. Prasad had a severe heart attack and died without any succession plan in place. Ram and Sham, the two sons of Panapathi G. Prasad were also directors in the company with equal shareholding. After the death of Panapathi G. Prasad, both brothers had strained relations over the management control which adversely affected the business of the company. With declining profit and turnover both the brothers were worried and decided to reach a family settlement whereby the control of the company was handed over to the elder brother Ram. Sham resigned as the director of the company and in lieu of the same he was entrusted with the management and control of another family firm Saraswathi Edibles, wherein both brothers were partners. Praveen, son of Ram was inducted as director in the Company.

In 2018 Sham wanted to withdraw unsecured loan given by him to the company because the company stopped paying him interest on the loan. Despite follow up Sham was not paid either the principal or interest, which forced him to file an application under section 7 of the Insolvency and Bankruptcy Code 2016.

The Adjudicating Authority (i) admitted the application, (ii) declared moratorium and (iii)

appointed Nagarajan, as an Interim Resolution Professional (IRP). Ram refused to hand over the management control to the IRP on the plea that it was a family dispute, and they will settle soon on their own. He also asked the IRP not to make the public announcement.

IRP tried to persuade Ram citing the provisions of the Code and warned him that if he does not hand over control of the Corporate Debtor IRP will be forced to approach the Adjudicating Authority for appropriate orders. Thereafter Ram allowed the IRP to take inventory of the assets and stocks after 15 days from the insolvency commencement date.

With reference to the above facts and other details provided, answer the following questions with particular reference to the provisions contained in the Code, Regulations and rules of IBC and others :

(ii)Sham filed a claim for unsecured loan of ₹ 1,75,00,000 along with interest @ 18 per cent per annum. IRP reviewed the accounts and found that there is neither an agreement to that effect on interest rate, northern is any resolution of the Board of Director in this regard. IRP admitted the claim only for the principal amount. Is the IRP right in his decision ?

June 2025Q. 6(ii)4 marksSyllabus 2017
Show the facts common to all parts of Q. 6

There was a major steel manufacturing company called ‘Tough Steel Industries Limited’ (‘Tough Steel’ or ‘the Company’). For many years, Tough Steel was a leading name in the steel industry, known for producing high-quality steel that was used in critical infrastructure projects worldwide.

However, over time, Tough Steel found itself in serious financial trouble due to a mix of rising production costs, market volatility, and mismanagement. As a result, the company defaulted on its massive debt obligations, putting its future at risk.

Faced with growing debt and no way to repay it, Tough Steel was forced into the insolvency resolution process under the Insolvency and Bankruptcy Code (IBC). A Resolution Professional (RP)

was appointed to manage the proceedings and oversee the search for a solution. Several potential buyers came forward with offers to resolve the insolvency, but one stood out: Steel Global, an international steel conglomerate, which presented an offer that could clear all of Tough Steel’s debts and inject fresh capital to restore the company.

The Committee of Creditors (CoC), which included both financial and operational creditors, had to approve the resolution plan. However, a key issue emerged : who should have the final say in approving the resolution plan? Was it the financial creditors, who had the largest share of Tough Steel’s debts, or should operational creditors, who provided goods and services to the company, have a more significant influence ?

In the light of the above case study inputs and referring to the decisions of applicable case laws with reasons and the provisions of Insolvency and Bankruptcy Code ,2016 (IBC, 2016) and the Regulations made thereunder, answer the following questions :

(ii)What are the potential implications for the insolvency resolution process if operational creditors are granted equal voting rights to financial creditors in the Committee of Creditors (CoC), and how could this shift affect the approval process of resolution plans in future cases?

June 2025Q. 6(iii)4 marksSyllabus 2017
Show the facts common to all parts of Q. 6

There was a major steel manufacturing company called ‘Tough Steel Industries Limited’ (‘Tough Steel’ or ‘the Company’). For many years, Tough Steel was a leading name in the steel industry, known for producing high-quality steel that was used in critical infrastructure projects worldwide.

However, over time, Tough Steel found itself in serious financial trouble due to a mix of rising production costs, market volatility, and mismanagement. As a result, the company defaulted on its massive debt obligations, putting its future at risk.

Faced with growing debt and no way to repay it, Tough Steel was forced into the insolvency resolution process under the Insolvency and Bankruptcy Code (IBC). A Resolution Professional (RP)

was appointed to manage the proceedings and oversee the search for a solution. Several potential buyers came forward with offers to resolve the insolvency, but one stood out: Steel Global, an international steel conglomerate, which presented an offer that could clear all of Tough Steel’s debts and inject fresh capital to restore the company.

The Committee of Creditors (CoC), which included both financial and operational creditors, had to approve the resolution plan. However, a key issue emerged : who should have the final say in approving the resolution plan? Was it the financial creditors, who had the largest share of Tough Steel’s debts, or should operational creditors, who provided goods and services to the company, have a more significant influence ?

In the light of the above case study inputs and referring to the decisions of applicable case laws with reasons and the provisions of Insolvency and Bankruptcy Code ,2016 (IBC, 2016) and the Regulations made thereunder, answer the following questions :

(iii)How does the role of the Resolution Professional (RP) in the Tough Steel case demonstrate the balance between independence and stakeholder influence in recommending a resolution plan, and what legal challenges could arise if their recommendation is contested by creditors with differing interests ?

June 2025Q. 6(i)4 marksSyllabus 2017
Show the facts common to all parts of Q. 6

There was a major steel manufacturing company called ‘Tough Steel Industries Limited’ (‘Tough Steel’ or ‘the Company’). For many years, Tough Steel was a leading name in the steel industry, known for producing high-quality steel that was used in critical infrastructure projects worldwide.

However, over time, Tough Steel found itself in serious financial trouble due to a mix of rising production costs, market volatility, and mismanagement. As a result, the company defaulted on its massive debt obligations, putting its future at risk.

Faced with growing debt and no way to repay it, Tough Steel was forced into the insolvency resolution process under the Insolvency and Bankruptcy Code (IBC). A Resolution Professional (RP)

was appointed to manage the proceedings and oversee the search for a solution. Several potential buyers came forward with offers to resolve the insolvency, but one stood out: Steel Global, an international steel conglomerate, which presented an offer that could clear all of Tough Steel’s debts and inject fresh capital to restore the company.

The Committee of Creditors (CoC), which included both financial and operational creditors, had to approve the resolution plan. However, a key issue emerged : who should have the final say in approving the resolution plan? Was it the financial creditors, who had the largest share of Tough Steel’s debts, or should operational creditors, who provided goods and services to the company, have a more significant influence ?

In the light of the above case study inputs and referring to the decisions of applicable case laws with reasons and the provisions of Insolvency and Bankruptcy Code ,2016 (IBC, 2016) and the Regulations made thereunder, answer the following questions :

(i)In the Tough Steel insolvency case, how did the legal framework of the Insolvency and Bankruptcy Code (IBC) influence the decision-making powers of the Committee of Creditors (CoC), particularly regarding the voting rights of financial creditors versus operational creditors in approving a resolution plan ?

December 2024Q. 1(b)(i)1 markSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(b)(i) What is meant by the term ‘Hair-Cut’ ? In the given case study, what percentage of ‘Hair-cut’ shall be borne by the Financial Creditors ?

December 2024Q. 1(b)(iv)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(iv)What percentage of hair-cut would be borne by the above class ?

June 2024Q. 4(a)6 marksSyllabus 2022

(a)Vikky Construction Company Pvt. Ltd. (Corporate Debtor & Respondent) entered into a sub-Contract Agreement with one Nusheerabad Constructions Pvt. Ltd. (NCPL) on 01.02.2008, to undertake work of Construction and widening of roads for and on behalf of NCPL.

Apart from this Agreement, a separate agreement of the same date was entered into between the said NCPL and one KDM Projects Private Limited, Kolkata, as a result of which, a tripartite Memorandum of Understanding was entered into on 09.05.2008 between NCPL, KDM Projects Pvt. Ltd. and the Respondent.

During the course of the project, disputes and differences arose between the parties and the same were referred to an Arbitral Tribunal, which delivered its Award on 21.01.2017. One of the claims that was allowed by the said Award was in favour of the respondent for a sum of ₹ 1,71,98,302/- which arose out of certain interim payment certificates. Another claim that was allowed related to higher rates of payment in which a sum of ₹ 13,56,98,624 was awarded.

Three cross claims that were made by the Respondent were rejected.

A notice dated 06.02.2017 was sent by the Respondent to NCPL to pay an amount of ₹ 1,79,00,166. This notice was stated to be a notice under Section 8 of the Code. Within 10 days, by a letter dated 16.02.2017, NCPL disputed the invoice that was referred to in the said notice, stating that the said amount was, in fact, the subject-matter of an arbitration proceeding, and as per NCPL’s accounts, the Respondent was liable to pay larger amounts to them.

After the notice and reply, on 20.04.2017, a Section 34 petition was filed by NCPL under the Arbitration and Conciliation Act, 1996 challenging the aforesaid Award. This petition was filed within the period of limitation set down in Section 34(3) of the Act. It is only thereafter that a petition was filed under Section 9 of the Code, on 14.07.2017.

The Adjudicating Authority (AA), by its order dated 29.08.2017, referred to the afore stated facts and also referred to the fact that the Award which was challenged under Section 34 specifically stated that learned counsel for the first Respondent (i.e., the corporate debtor)

was fair enough to admit that the claimant is entitled to the said sum of ₹ 1,71,98,302/-According to the AA, the fact that a Section 34 petition was pending was irrelevant for the reason that the claim stood admitted, and there was no stay of the Award. For these reasons, therefore, the Section 9 petition was admitted.

An appeal filed to the Appellate Tribunal met with the same fate, as according to the Appellate Tribunal, the non-obstante clause contained in Section 238 of the Code would override the Arbitration Act. Also, according to the Appellate Tribunal, since Form(s) required to be filed in terms of the Insolvency & Bankruptcy (Application to Adjudicating Authority)

Rules, 2016 requires particulars of an order of an arbitral panel adjudicating on the default, this would have to be treated as “a record of an operational debt”, as a result of which the petition would have to be admitted, as was correctly done by the Adjudicating Authority.

The appeal was, accordingly, dismissed.

Being aggrieved by the decision of the Appellate Tribunal, the Appellant has appealed to the apex court. In the light of decided cases, examine whether the code can be invoked in respect of an operational debt where an Arbitral Award has been passed against the operational debtor, which has not yet been finally adjudicated upon ? Would the Appellants’ plea against the judgment of the Authorities be accepted ?

December 2024Q. 4(a)(i)5 marksSyllabus 2022
Show the facts common to all parts of Q. 4

(a)An agreement was entered into during August, 2006 between the ZY Infrastructures Private Limited (hereinafter referred to as ‘ZY Infra’) and WV Infrastructure Private Limited (hereinafter referred to as ‘the Corporate Debtor’), for development of land licensed with the ZY Infra admeasuring 8 acres into a residential group housing complex at Bengaluru. However, the ZY infra, being aggrieved by the Corporate Debtor’s alleged misconduct in advertising the project under its own name and without mentioning the name of the ZY Infra, sought reference to arbitration during May, 2011.

The arbitral proceedings culminated in an award dated 1st August, 2016 in favour of the ZY Infra. In addition to awarding a monetary claim, the award inter alia directed the Corporate Debtor to apply to the authorities for transfer of the requisite licenses to the ZY Infra.

Aggrieved by the award, the Corporate Debtor filed a petition under Section 34 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the ‘Arbitration Act’) during September, 2016.

On the same date, the ZY Infra filed execution proceedings in respect of the said award.

These execution proceedings were ultimately adjourned sine die on 22nd December, 2017 on account of the pendency of the proceedings under Section 34 of the Arbitration Act.

These proceedings under Section 34 of the Arbitration Act culminated in the award being upheld by Special Commercial Court with some modifications.

Corporate Debtor who has filed an appeal against the same under Section 37 of the Arbitration Act is stated to be pending.

Meanwhile, the Corporate Insolvency Resolution Process (‘CIRP’) was initiated against the Corporate Debtor in respect of three real estate projects by certain homebuyers who had invested in these projects. This application under Section 7 of the Insolvency and Bankruptcy Code (hereinafter referred to as ‘the IBC’) was admitted on 27th March, 2019 by the Adjudicating Authority. On the same date, an Interim Resolution Professional (‘IRP’) was appointed. The IRP issued a public announcement inviting claims from creditors, in accordance with Section 15 of the IBC read with Regulation 6 of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 (hereinafter referred to as the ‘IBBI Regulations’) on 30th March, 2019.

After receipt of the claims, the IRP constituted the Committee of Creditors (‘COC’) on 6th November, 2019 and circulated the draft information memorandum and invited expressions of interest from prospective resolution applicants. Five such applications were received.

Thereafter, the IRP was replaced by Resolution Professional (RP) by the COC on 18th June,

2020. The resolution plan as submitted by TSK Residential Welfare Association was approved by the COC by a majority vote of 80.74% on 11th July, 2020. This plan was then submitted by RP to the Adjudicating Authority for approval under Section 31 of the IBC on 8th September, 2020.

ZY Infra sent an email on 19th August, 2020 to RP highlighting their pending claim of ₹ 35 Crores and odd against the Corporate Debtor arising from the arbitral award dated 1st August, 2016, confirmed with certain modifications in the proceedings under Section 34 of the said Act.

However, RP rejected this claim on 25th August, 2020 on the ground that the time period for submitting the claim was within 90 days of initiation of CIRP and the applicant was 287 days late. A Resolution plan had already been passed by the COC.

ZY Infra filed an application under Section 60(5) of the IBC. During the pendency of RP’s application for approval of the plan before the Adjudicating Authority, seeking directions to RP that the ZY Infra’s claim may be considered on merits.

This relief was granted to the ZY Infra by the Adjudicating Authority vide an order dated 3rd November, 2020 predicated on the following grounds :

(a)RP could not have summarily rejected ZY Infra’s claim, as this claim would have appeared in the Corporate Debtor’s books of accounts;

(b)In case such books of accounts were not available, RP had a duty to obtain them and verify the financial position; and

(c)as such announcement was made through public newspapers, it was likely that the appellant missed out on the same.

RP thereafter preferred an appeal under Section 61 of the IBC before the National Company Law Appellate Tribunal, New Delhi (‘NCLAT’) against the Adjudicating Authority’s order.

The NCLAT, vide the impugned order dated 30th July, 2021, did not favour the view adopted by the Adjudicating Authority. Their reasoning was as follows :

(i)RP had effectuated proper service for inviting claims in accordance with Regulation 6 of the IBBI Regulations which only mandates a pronouncement through newspapers and not through personal service—an aspect that was not disputed by the appellant;

(ii)The appellant failed to show that it filed its claim as soon as it came to know of the initiation of the CIRP.

(iii)RP even filed an application under Section 19 of the IBC before the Adjudicating Authority seeking that a direction be issued to the ex-management to provide all records. Although nothing came of this attempt, it reflected his sincere efforts;

(iv)Regulations 12 and 13 of the IBBI Regulations obliged the RP to accept claims filed within the extended period of 90 days of the commencement of CIRP.

(v)The resolution plan, as approved by the COC, would be jeopardised if new claims were entertained.

Consequent to the decision of the NCLAT, ZY Infra approached Supreme Court of India for the final resolution.

In the above background mentioning relevant case laws and applicable provisions of IBC and IBBI Regulations answer the following questions :

(i)State with reasons and applicable case law, whether the ZY Infra will succeed in its appeal ?

December 2024Q. 1(a)6 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(a)Discuss whether RA will succeed in the appeal preferred before the Honourable Supreme Court ?

June 2025Q. 4(b)(i)10 marks for the whole sub-partSyllabus 2022

(b)Comment on the correctness of the following factual situations or statements referring applicable provisions of the IBC, 2016 and Regulations made thereunder :

(i)In a Corporate Insolvency Resolution Process, there were no Financial Creditors and only there were 25 Operational Creditors and Employees and workers. Out of 25 Operational Creditors, 10 Operational Creditors formed a committee within themselves including the 5 representatives of workers and employees.

December 2019Q. 5(a)4 marksSyllabus 2017

(a)If there is NO Financial Creditor, how will the Committee of Creditors be constituted?

June 2024Q. 1(B)(ii)6 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(B)Mr. Krish, an operational creditor, filed an application with the Adjudicating Authority (NCLT, Delhi) to initiate the Corporate Insolvency Resolution Process (CIRP) against M/s Master Mind Limited, and the application was accepted. On 10th July 2023, NCLT Delhi appointed Mr.

Aditya to act as an Interim Resolution Professional of M Limited. After the appointment, Mr.

Aditya issued the public announcement on 12th July 2023, of the initiation of CIRP process and called for the submission of claims. On 20th July 2023, the Committee of Creditors was constituted by Mr. Aditya.

Thereafter, Mr. Krish wants to withdraw his application under Section 12A of the Insolvency and Bankruptcy Code, 2016. However, Mr. Aditya denied filing a withdrawal application stating that the Committee of Creditors has already been constituted.

Referring to the provisions of the Insolvency and Bankruptcy Code, 2016, answer the following with reference to the above facts :

(ii)Would your answer differ in case the Committee of Creditors is not constituted ?

June 2023Q. 1(d)(i)10 marks for the whole sub-partSyllabus 2017
Show the facts common to all parts of Q. 1

Sober Ltd. (the Company) is engaged in the business of running hotel chains in India as well as outside India. Due to less demand faced during the pandemic, the Company was unable to meet its financial obligations. Financial creditors of the Company decided to file an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC). On 1 st January, 2022, Corporate Insolvency Resolution Process (‘CIRP’) of the Company started and Shyam was appointed as an Interim Resolution Professional.

The Company was subjected to parallel insolvency proceedings in India as well as Netherlands (where it had registered office). In the Netherlands, the Company was declared bankrupt and the Dutch trustee had been appointed to manage the estate of the Company. During the 1st meeting of the Committee of Creditors (CoC), Shyam was confirmed to act as Resolution Professional (RP). Considering the future potential in the Company, many strategic and financial investors expressed their interest in buying the Company including one of the members of the CoC who also submitted Expression of Interest to the RP. Shyam after due verification, published the final list of the prospective resolution applicants. One of the investors, Simba Ltd. wrote an email to Shyam stating that they also want to participate in the process and submitted all the required documents to Shyam for their name to get included in the final list of the prospective resolution applicants. Shyam refused to include their name in the final list stating that no provision exist under the IBC to include name of any party, once the final list of the prospective resolution applicants is published by the RP.

During the CIRP process, Shyam had appointed two valuers to carry out valuation. The fair value given by Valuer 1 was ₹ 1,750 crore and Valuer 2 was ₹ 550 crore and liquidation value was ₹ 1,000 crore and ₹ 200 crore respectively. During the discussions with the valuers to understand the methodology adopted by them to carry out the valuation, Shyam realized that both the valuers have carried out valuation based on the internationally accepted valuation methods and have made certain assumptions while arriving at the final numbers. Lawyer of Shyam had suggested that since the valuation given by Valuer 1 is advantageous for the stakeholders, he can put the valuation report issued by Valuer 1 before the CoC. Shyam agreed and moved ahead accordingly. During one of the meetings of the CoC, the financial creditors were deliberating on how to maximize the value of the Company and fetch a best possible resolution plan. In response, one of the members of the CoC requested the entire CoC to explore possibility of ‘Swiss Challenge’ to improve value of the resolution plans. However, none of the other members agreed stating that there is no provision under the IBC for exercising a ‘Swiss Challenge’. When the final resolution plans had come, the RP after due verification and completing required formalities, had put-up all the plans on voting. The outcome of voting was as under:

S. No. Particulars Voting result 1 Resolution Plan 1 56% 2 Resolution Plan 2 67% 3 Resolution Plan 3 67% 4 Resolution Plan 4 75% One of the members of the CoC suggested to carry out the voting again since the voting percentage of Resolution Plan 2 and 3 is same. The RP denied stating that once the voting is done, re-voting on the plans cannot be done again in the present scenario. Accordingly, Resolution Plan 4 was filed with the adjudicating authority for approval.

The resolution applicant had mentioned in the Resolution Plan 4 to put ₹ 80 crore in the form of working capital as well as capital expenditure, once the company’s handover formalities are completed. Even after 1 year of handover, the resolution applicant did not infuse the aforesaid amount. In fact, the resolution applicant requested the financial creditors to waive off the condition to infuse money for working capital and capital expenditure. Shyam being part of the monitoring committee, overseeing implementation of the resolution plan, expressed his concern on the request made by the resolution applicant citing violation of the provisions under the IBC. Consider the above case and relevant provisions of the IBC, its rules and regulations made thereunder, answer the following questions:

(d)Whether the following actions of Shyam are in accordance with the IBC?

(i)Accepting the valuation report given by Valuer 1 and moving forward? If not, suggest an action plan to Shyam.

June 2023Q. 1(b)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Sober Ltd. (the Company) is engaged in the business of running hotel chains in India as well as outside India. Due to less demand faced during the pandemic, the Company was unable to meet its financial obligations. Financial creditors of the Company decided to file an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC). On 1 st January, 2022, Corporate Insolvency Resolution Process (‘CIRP’) of the Company started and Shyam was appointed as an Interim Resolution Professional.

The Company was subjected to parallel insolvency proceedings in India as well as Netherlands (where it had registered office). In the Netherlands, the Company was declared bankrupt and the Dutch trustee had been appointed to manage the estate of the Company. During the 1st meeting of the Committee of Creditors (CoC), Shyam was confirmed to act as Resolution Professional (RP). Considering the future potential in the Company, many strategic and financial investors expressed their interest in buying the Company including one of the members of the CoC who also submitted Expression of Interest to the RP. Shyam after due verification, published the final list of the prospective resolution applicants. One of the investors, Simba Ltd. wrote an email to Shyam stating that they also want to participate in the process and submitted all the required documents to Shyam for their name to get included in the final list of the prospective resolution applicants. Shyam refused to include their name in the final list stating that no provision exist under the IBC to include name of any party, once the final list of the prospective resolution applicants is published by the RP.

During the CIRP process, Shyam had appointed two valuers to carry out valuation. The fair value given by Valuer 1 was ₹ 1,750 crore and Valuer 2 was ₹ 550 crore and liquidation value was ₹ 1,000 crore and ₹ 200 crore respectively. During the discussions with the valuers to understand the methodology adopted by them to carry out the valuation, Shyam realized that both the valuers have carried out valuation based on the internationally accepted valuation methods and have made certain assumptions while arriving at the final numbers. Lawyer of Shyam had suggested that since the valuation given by Valuer 1 is advantageous for the stakeholders, he can put the valuation report issued by Valuer 1 before the CoC. Shyam agreed and moved ahead accordingly. During one of the meetings of the CoC, the financial creditors were deliberating on how to maximize the value of the Company and fetch a best possible resolution plan. In response, one of the members of the CoC requested the entire CoC to explore possibility of ‘Swiss Challenge’ to improve value of the resolution plans. However, none of the other members agreed stating that there is no provision under the IBC for exercising a ‘Swiss Challenge’. When the final resolution plans had come, the RP after due verification and completing required formalities, had put-up all the plans on voting. The outcome of voting was as under:

S. No. Particulars Voting result 1 Resolution Plan 1 56% 2 Resolution Plan 2 67% 3 Resolution Plan 3 67% 4 Resolution Plan 4 75% One of the members of the CoC suggested to carry out the voting again since the voting percentage of Resolution Plan 2 and 3 is same. The RP denied stating that once the voting is done, re-voting on the plans cannot be done again in the present scenario. Accordingly, Resolution Plan 4 was filed with the adjudicating authority for approval.

The resolution applicant had mentioned in the Resolution Plan 4 to put ₹ 80 crore in the form of working capital as well as capital expenditure, once the company’s handover formalities are completed. Even after 1 year of handover, the resolution applicant did not infuse the aforesaid amount. In fact, the resolution applicant requested the financial creditors to waive off the condition to infuse money for working capital and capital expenditure. Shyam being part of the monitoring committee, overseeing implementation of the resolution plan, expressed his concern on the request made by the resolution applicant citing violation of the provisions under the IBC. Consider the above case and relevant provisions of the IBC, its rules and regulations made thereunder, answer the following questions:

(b)Whether the contention of Shyam is correct that once the final list of prospective resolution applicants is published, name of any other party cannot be included in the list of prospective resolution applicants?

Suggest the plausible option if the name of any party has to be included after publication of the final list of the prospective resolution applicants.

June 2023Q. 1(c)(ii)10 marks for the whole sub-partSyllabus 2017
Show the facts common to all parts of Q. 1

Sober Ltd. (the Company) is engaged in the business of running hotel chains in India as well as outside India. Due to less demand faced during the pandemic, the Company was unable to meet its financial obligations. Financial creditors of the Company decided to file an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC). On 1 st January, 2022, Corporate Insolvency Resolution Process (‘CIRP’) of the Company started and Shyam was appointed as an Interim Resolution Professional.

The Company was subjected to parallel insolvency proceedings in India as well as Netherlands (where it had registered office). In the Netherlands, the Company was declared bankrupt and the Dutch trustee had been appointed to manage the estate of the Company. During the 1st meeting of the Committee of Creditors (CoC), Shyam was confirmed to act as Resolution Professional (RP). Considering the future potential in the Company, many strategic and financial investors expressed their interest in buying the Company including one of the members of the CoC who also submitted Expression of Interest to the RP. Shyam after due verification, published the final list of the prospective resolution applicants. One of the investors, Simba Ltd. wrote an email to Shyam stating that they also want to participate in the process and submitted all the required documents to Shyam for their name to get included in the final list of the prospective resolution applicants. Shyam refused to include their name in the final list stating that no provision exist under the IBC to include name of any party, once the final list of the prospective resolution applicants is published by the RP.

During the CIRP process, Shyam had appointed two valuers to carry out valuation. The fair value given by Valuer 1 was ₹ 1,750 crore and Valuer 2 was ₹ 550 crore and liquidation value was ₹ 1,000 crore and ₹ 200 crore respectively. During the discussions with the valuers to understand the methodology adopted by them to carry out the valuation, Shyam realized that both the valuers have carried out valuation based on the internationally accepted valuation methods and have made certain assumptions while arriving at the final numbers. Lawyer of Shyam had suggested that since the valuation given by Valuer 1 is advantageous for the stakeholders, he can put the valuation report issued by Valuer 1 before the CoC. Shyam agreed and moved ahead accordingly. During one of the meetings of the CoC, the financial creditors were deliberating on how to maximize the value of the Company and fetch a best possible resolution plan. In response, one of the members of the CoC requested the entire CoC to explore possibility of ‘Swiss Challenge’ to improve value of the resolution plans. However, none of the other members agreed stating that there is no provision under the IBC for exercising a ‘Swiss Challenge’. When the final resolution plans had come, the RP after due verification and completing required formalities, had put-up all the plans on voting. The outcome of voting was as under:

S. No. Particulars Voting result 1 Resolution Plan 1 56% 2 Resolution Plan 2 67% 3 Resolution Plan 3 67% 4 Resolution Plan 4 75% One of the members of the CoC suggested to carry out the voting again since the voting percentage of Resolution Plan 2 and 3 is same. The RP denied stating that once the voting is done, re-voting on the plans cannot be done again in the present scenario. Accordingly, Resolution Plan 4 was filed with the adjudicating authority for approval.

The resolution applicant had mentioned in the Resolution Plan 4 to put ₹ 80 crore in the form of working capital as well as capital expenditure, once the company’s handover formalities are completed. Even after 1 year of handover, the resolution applicant did not infuse the aforesaid amount. In fact, the resolution applicant requested the financial creditors to waive off the condition to infuse money for working capital and capital expenditure. Shyam being part of the monitoring committee, overseeing implementation of the resolution plan, expressed his concern on the request made by the resolution applicant citing violation of the provisions under the IBC. Consider the above case and relevant provisions of the IBC, its rules and regulations made thereunder, answer the following questions:

(c)Whether the following contentions of the CoC are correct?

(ii)There exists no provision to initiate ‘Swiss Challenge’.

June 2023Q. 1(c)(i)10 marks for the whole sub-partSyllabus 2017
Show the facts common to all parts of Q. 1

Sober Ltd. (the Company) is engaged in the business of running hotel chains in India as well as outside India. Due to less demand faced during the pandemic, the Company was unable to meet its financial obligations. Financial creditors of the Company decided to file an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC). On 1 st January, 2022, Corporate Insolvency Resolution Process (‘CIRP’) of the Company started and Shyam was appointed as an Interim Resolution Professional.

The Company was subjected to parallel insolvency proceedings in India as well as Netherlands (where it had registered office). In the Netherlands, the Company was declared bankrupt and the Dutch trustee had been appointed to manage the estate of the Company. During the 1st meeting of the Committee of Creditors (CoC), Shyam was confirmed to act as Resolution Professional (RP). Considering the future potential in the Company, many strategic and financial investors expressed their interest in buying the Company including one of the members of the CoC who also submitted Expression of Interest to the RP. Shyam after due verification, published the final list of the prospective resolution applicants. One of the investors, Simba Ltd. wrote an email to Shyam stating that they also want to participate in the process and submitted all the required documents to Shyam for their name to get included in the final list of the prospective resolution applicants. Shyam refused to include their name in the final list stating that no provision exist under the IBC to include name of any party, once the final list of the prospective resolution applicants is published by the RP.

During the CIRP process, Shyam had appointed two valuers to carry out valuation. The fair value given by Valuer 1 was ₹ 1,750 crore and Valuer 2 was ₹ 550 crore and liquidation value was ₹ 1,000 crore and ₹ 200 crore respectively. During the discussions with the valuers to understand the methodology adopted by them to carry out the valuation, Shyam realized that both the valuers have carried out valuation based on the internationally accepted valuation methods and have made certain assumptions while arriving at the final numbers. Lawyer of Shyam had suggested that since the valuation given by Valuer 1 is advantageous for the stakeholders, he can put the valuation report issued by Valuer 1 before the CoC. Shyam agreed and moved ahead accordingly. During one of the meetings of the CoC, the financial creditors were deliberating on how to maximize the value of the Company and fetch a best possible resolution plan. In response, one of the members of the CoC requested the entire CoC to explore possibility of ‘Swiss Challenge’ to improve value of the resolution plans. However, none of the other members agreed stating that there is no provision under the IBC for exercising a ‘Swiss Challenge’. When the final resolution plans had come, the RP after due verification and completing required formalities, had put-up all the plans on voting. The outcome of voting was as under:

S. No. Particulars Voting result 1 Resolution Plan 1 56% 2 Resolution Plan 2 67% 3 Resolution Plan 3 67% 4 Resolution Plan 4 75% One of the members of the CoC suggested to carry out the voting again since the voting percentage of Resolution Plan 2 and 3 is same. The RP denied stating that once the voting is done, re-voting on the plans cannot be done again in the present scenario. Accordingly, Resolution Plan 4 was filed with the adjudicating authority for approval.

The resolution applicant had mentioned in the Resolution Plan 4 to put ₹ 80 crore in the form of working capital as well as capital expenditure, once the company’s handover formalities are completed. Even after 1 year of handover, the resolution applicant did not infuse the aforesaid amount. In fact, the resolution applicant requested the financial creditors to waive off the condition to infuse money for working capital and capital expenditure. Shyam being part of the monitoring committee, overseeing implementation of the resolution plan, expressed his concern on the request made by the resolution applicant citing violation of the provisions under the IBC. Consider the above case and relevant provisions of the IBC, its rules and regulations made thereunder, answer the following questions:

(c)Whether the following contentions of the CoC are correct?

(i)In case two resolution plans receive the same votes, voting has to be done again.

December 2021Q. 3(a)6 marksSyllabus 2017

(a)Financial Creditor of M/s XYZ Ltd. (Corporate Debtor) filed an application for Corporate Insolvency Resolution Process (CIRP) before the Adjudicativng Authority and Interim Resolution Professional (IRP) was appointed. The IRP for the purpose of formation of Committee of Creditors (CoC), verified the claims submitted by the all the financial creditors and observed that all such financial creditors comes under the purview of related parties to the Corporate Debtor.

Apart from the financial creditors there are 5 Operational Creditors only.

In the given situation, how the CoC will be formed ? Explain by qouting the relevant provisions contained in the Insolvency and Bankruptcy Code, 2016.

June 2025Q. 2(b)6 marksSyllabus 2017

(b)XenZee Ltd. was undergoing insolvency proceedings under the Corporate Insolvency Resolution Process (CIRP), and Raveendra, the appointed Resolution Professional (RP), was overseeing the entire process. Raveendra, known for his diligence and expertise, was focused on moving the process forward without delays.

As part of his responsibilities, Raveendra needed to convene a Committee of Creditors (COC)

meeting to discuss the future steps regarding the resolution of the company’s debt. With time running out and the need for urgent decisions, Raveendra set the meeting date for five days later. He quickly crafted a detailed notice for the meeting, ensuring that it contained all the necessary information, including the date, time, location (or virtual meeting link), and agenda.

To expedite communication, Raveendra chose to send the notice via e-mail. He attached the agenda and meeting details in an editable document and sent it to all members of the COC, ensuring that the notice was dispatched within the required timeframe. The clock was ticking, and Ravi was confident that the 5-day notice period would meet the legal requirements for calling the meeting.

However, as the day of the meeting drew nearer, Sharma, one of the creditors, raised a concern. He questioned the validity of the notice, specifically pointing out that it had been sent in an editable format and whether the 5-day notice period was sufficient. Sharma was unsure if Raveendra’s approach adhered to the strict guidelines outlined under the Insolvency and Bankruptcy Code (IBC). As a Company Secretary provide your view.

December 2024Q. 4(a)(ii)(a)2 marksSyllabus 2022
Show the facts common to all parts of Q. 4

(a)An agreement was entered into during August, 2006 between the ZY Infrastructures Private Limited (hereinafter referred to as ‘ZY Infra’) and WV Infrastructure Private Limited (hereinafter referred to as ‘the Corporate Debtor’), for development of land licensed with the ZY Infra admeasuring 8 acres into a residential group housing complex at Bengaluru. However, the ZY infra, being aggrieved by the Corporate Debtor’s alleged misconduct in advertising the project under its own name and without mentioning the name of the ZY Infra, sought reference to arbitration during May, 2011.

The arbitral proceedings culminated in an award dated 1st August, 2016 in favour of the ZY Infra. In addition to awarding a monetary claim, the award inter alia directed the Corporate Debtor to apply to the authorities for transfer of the requisite licenses to the ZY Infra.

Aggrieved by the award, the Corporate Debtor filed a petition under Section 34 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the ‘Arbitration Act’) during September, 2016.

On the same date, the ZY Infra filed execution proceedings in respect of the said award.

These execution proceedings were ultimately adjourned sine die on 22nd December, 2017 on account of the pendency of the proceedings under Section 34 of the Arbitration Act.

These proceedings under Section 34 of the Arbitration Act culminated in the award being upheld by Special Commercial Court with some modifications.

Corporate Debtor who has filed an appeal against the same under Section 37 of the Arbitration Act is stated to be pending.

Meanwhile, the Corporate Insolvency Resolution Process (‘CIRP’) was initiated against the Corporate Debtor in respect of three real estate projects by certain homebuyers who had invested in these projects. This application under Section 7 of the Insolvency and Bankruptcy Code (hereinafter referred to as ‘the IBC’) was admitted on 27th March, 2019 by the Adjudicating Authority. On the same date, an Interim Resolution Professional (‘IRP’) was appointed. The IRP issued a public announcement inviting claims from creditors, in accordance with Section 15 of the IBC read with Regulation 6 of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 (hereinafter referred to as the ‘IBBI Regulations’) on 30th March, 2019.

After receipt of the claims, the IRP constituted the Committee of Creditors (‘COC’) on 6th November, 2019 and circulated the draft information memorandum and invited expressions of interest from prospective resolution applicants. Five such applications were received.

Thereafter, the IRP was replaced by Resolution Professional (RP) by the COC on 18th June,

2020. The resolution plan as submitted by TSK Residential Welfare Association was approved by the COC by a majority vote of 80.74% on 11th July, 2020. This plan was then submitted by RP to the Adjudicating Authority for approval under Section 31 of the IBC on 8th September, 2020.

ZY Infra sent an email on 19th August, 2020 to RP highlighting their pending claim of ₹ 35 Crores and odd against the Corporate Debtor arising from the arbitral award dated 1st August, 2016, confirmed with certain modifications in the proceedings under Section 34 of the said Act.

However, RP rejected this claim on 25th August, 2020 on the ground that the time period for submitting the claim was within 90 days of initiation of CIRP and the applicant was 287 days late. A Resolution plan had already been passed by the COC.

ZY Infra filed an application under Section 60(5) of the IBC. During the pendency of RP’s application for approval of the plan before the Adjudicating Authority, seeking directions to RP that the ZY Infra’s claim may be considered on merits.

This relief was granted to the ZY Infra by the Adjudicating Authority vide an order dated 3rd November, 2020 predicated on the following grounds :

(a)RP could not have summarily rejected ZY Infra’s claim, as this claim would have appeared in the Corporate Debtor’s books of accounts;

(b)In case such books of accounts were not available, RP had a duty to obtain them and verify the financial position; and

(c)as such announcement was made through public newspapers, it was likely that the appellant missed out on the same.

RP thereafter preferred an appeal under Section 61 of the IBC before the National Company Law Appellate Tribunal, New Delhi (‘NCLAT’) against the Adjudicating Authority’s order.

The NCLAT, vide the impugned order dated 30th July, 2021, did not favour the view adopted by the Adjudicating Authority. Their reasoning was as follows :

(i)RP had effectuated proper service for inviting claims in accordance with Regulation 6 of the IBBI Regulations which only mandates a pronouncement through newspapers and not through personal service—an aspect that was not disputed by the appellant;

(ii)The appellant failed to show that it filed its claim as soon as it came to know of the initiation of the CIRP.

(iii)RP even filed an application under Section 19 of the IBC before the Adjudicating Authority seeking that a direction be issued to the ex-management to provide all records. Although nothing came of this attempt, it reflected his sincere efforts;

(iv)Regulations 12 and 13 of the IBBI Regulations obliged the RP to accept claims filed within the extended period of 90 days of the commencement of CIRP.

(v)The resolution plan, as approved by the COC, would be jeopardised if new claims were entertained.

Consequent to the decision of the NCLAT, ZY Infra approached Supreme Court of India for the final resolution.

In the above background mentioning relevant case laws and applicable provisions of IBC and IBBI Regulations answer the following questions :

(ii)Considering the points raised by National Company Law Tribunal in this case, answer the following questions mentioning the relevant Sections of IBC/IBBI (CIRP) Regulations :

(a)In the event of claim received after the specified period, whether the same can be accepted, if yes, state the process for accepting claim after specified period.

(b)In case the Books are not provided by the Corporate Debtors, list out the persons/authorities with whom the IRP/RP may access the books or records as per the Regulations.

(c)State the modes or medium through which Public announcements have to be published by IRP/RP as per the Regulations.

(d)As per the duties specified under the IBC, what type of details/information can be collected by the IRP ?

December 2024Q. 1(c)(i)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(c)(i) State the types of assets classes as defined under the Companies (Registered Valuers and Valuation) Rules, 2017. Who shall appoint Valuers in this regard as per the extant IBBI Regulations ?

December 2024Q. 1(c)(ii)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(ii)Enumerate the provisions of IBBI Regulations with respect appointment of valuers and how many valuers are required to be appointed ?

December 2024Q. 1(c)(iii)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(iii)Under what circumstance a third Valuer can be appointed ?

December 2024Q. 4(a)(ii)(b)4 marksSyllabus 2022
Show the facts common to all parts of Q. 4

(a)An agreement was entered into during August, 2006 between the ZY Infrastructures Private Limited (hereinafter referred to as ‘ZY Infra’) and WV Infrastructure Private Limited (hereinafter referred to as ‘the Corporate Debtor’), for development of land licensed with the ZY Infra admeasuring 8 acres into a residential group housing complex at Bengaluru. However, the ZY infra, being aggrieved by the Corporate Debtor’s alleged misconduct in advertising the project under its own name and without mentioning the name of the ZY Infra, sought reference to arbitration during May, 2011.

The arbitral proceedings culminated in an award dated 1st August, 2016 in favour of the ZY Infra. In addition to awarding a monetary claim, the award inter alia directed the Corporate Debtor to apply to the authorities for transfer of the requisite licenses to the ZY Infra.

Aggrieved by the award, the Corporate Debtor filed a petition under Section 34 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the ‘Arbitration Act’) during September, 2016.

On the same date, the ZY Infra filed execution proceedings in respect of the said award.

These execution proceedings were ultimately adjourned sine die on 22nd December, 2017 on account of the pendency of the proceedings under Section 34 of the Arbitration Act.

These proceedings under Section 34 of the Arbitration Act culminated in the award being upheld by Special Commercial Court with some modifications.

Corporate Debtor who has filed an appeal against the same under Section 37 of the Arbitration Act is stated to be pending.

Meanwhile, the Corporate Insolvency Resolution Process (‘CIRP’) was initiated against the Corporate Debtor in respect of three real estate projects by certain homebuyers who had invested in these projects. This application under Section 7 of the Insolvency and Bankruptcy Code (hereinafter referred to as ‘the IBC’) was admitted on 27th March, 2019 by the Adjudicating Authority. On the same date, an Interim Resolution Professional (‘IRP’) was appointed. The IRP issued a public announcement inviting claims from creditors, in accordance with Section 15 of the IBC read with Regulation 6 of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 (hereinafter referred to as the ‘IBBI Regulations’) on 30th March, 2019.

After receipt of the claims, the IRP constituted the Committee of Creditors (‘COC’) on 6th November, 2019 and circulated the draft information memorandum and invited expressions of interest from prospective resolution applicants. Five such applications were received.

Thereafter, the IRP was replaced by Resolution Professional (RP) by the COC on 18th June,

2020. The resolution plan as submitted by TSK Residential Welfare Association was approved by the COC by a majority vote of 80.74% on 11th July, 2020. This plan was then submitted by RP to the Adjudicating Authority for approval under Section 31 of the IBC on 8th September, 2020.

ZY Infra sent an email on 19th August, 2020 to RP highlighting their pending claim of ₹ 35 Crores and odd against the Corporate Debtor arising from the arbitral award dated 1st August, 2016, confirmed with certain modifications in the proceedings under Section 34 of the said Act.

However, RP rejected this claim on 25th August, 2020 on the ground that the time period for submitting the claim was within 90 days of initiation of CIRP and the applicant was 287 days late. A Resolution plan had already been passed by the COC.

ZY Infra filed an application under Section 60(5) of the IBC. During the pendency of RP’s application for approval of the plan before the Adjudicating Authority, seeking directions to RP that the ZY Infra’s claim may be considered on merits.

This relief was granted to the ZY Infra by the Adjudicating Authority vide an order dated 3rd November, 2020 predicated on the following grounds :

(a)RP could not have summarily rejected ZY Infra’s claim, as this claim would have appeared in the Corporate Debtor’s books of accounts;

(b)In case such books of accounts were not available, RP had a duty to obtain them and verify the financial position; and

(c)as such announcement was made through public newspapers, it was likely that the appellant missed out on the same.

RP thereafter preferred an appeal under Section 61 of the IBC before the National Company Law Appellate Tribunal, New Delhi (‘NCLAT’) against the Adjudicating Authority’s order.

The NCLAT, vide the impugned order dated 30th July, 2021, did not favour the view adopted by the Adjudicating Authority. Their reasoning was as follows :

(i)RP had effectuated proper service for inviting claims in accordance with Regulation 6 of the IBBI Regulations which only mandates a pronouncement through newspapers and not through personal service—an aspect that was not disputed by the appellant;

(ii)The appellant failed to show that it filed its claim as soon as it came to know of the initiation of the CIRP.

(iii)RP even filed an application under Section 19 of the IBC before the Adjudicating Authority seeking that a direction be issued to the ex-management to provide all records. Although nothing came of this attempt, it reflected his sincere efforts;

(iv)Regulations 12 and 13 of the IBBI Regulations obliged the RP to accept claims filed within the extended period of 90 days of the commencement of CIRP.

(v)The resolution plan, as approved by the COC, would be jeopardised if new claims were entertained.

Consequent to the decision of the NCLAT, ZY Infra approached Supreme Court of India for the final resolution.

In the above background mentioning relevant case laws and applicable provisions of IBC and IBBI Regulations answer the following questions :

(ii)Considering the points raised by National Company Law Tribunal in this case, answer the following questions mentioning the relevant Sections of IBC/IBBI (CIRP) Regulations :

(a)In the event of claim received after the specified period, whether the same can be accepted, if yes, state the process for accepting claim after specified period.

(b)In case the Books are not provided by the Corporate Debtors, list out the persons/authorities with whom the IRP/RP may access the books or records as per the Regulations.

(c)State the modes or medium through which Public announcements have to be published by IRP/RP as per the Regulations.

(d)As per the duties specified under the IBC, what type of details/information can be collected by the IRP ?

December 2019Q. 2(b)(ii)3 marksSyllabus 2017

(ii)Can an assignee of Financial Contract make an application under Corporate Insolvency Resolution Process ?

June 2026Q. 4(c)6 marksSyllabus 2022

(c)Omega Infotech Private Limited, a corporate debtor, filed an application under Section 10 of the Insolvency and Bankruptcy Code, 2016, seeking initiation of the Corporate Insolvency Resolution Process (CIRP). The company submitted all required documents, including financial statements and evidence of default.

However, certain creditors opposed the application, alleging that:

•Investigations were pending against the promoters for financial irregularities.

•There were allegations of fraud and mismanagement, and

•The application was filed to escape liability.

The Adjudicating Authority, taking note of these allegations, refused to admit the application, stating that the conduct of the promoters and pending investigations made the case unsuitable for initiation of CIRP.

Omega Infotech Private Limited challenged this decision before the appellate authority, arguing that the application met all statutory requirements and that such external factors should not influence admission under the Code. Examine the case study and provide your expert view and quote the relevant case laws in support of your answer.

December 2025Q. 2(a)(ii)2 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(a)Suruchi Fabrics Limited (SFL) availed term loan of ₹ 10 Crore and cash credit facility of ₹ 2 Crore from A-One Bank Ltd. Since the SFL was unable to service the loan, the Board of Directors of the company passed a resolution to initiate Corporate Insolvency Resolution Process (CIRP) and proposed the name of Aneri, an Insolvency Professional to act as Interim Resolution Professional (IRP). Apart from the credit facility from the A-One Bank, SFL have no other financial creditor. However, SFL have outstanding dues towards its operational creditors amounting to ₹ 25 Crore.

Mathew is the Company Secretary of A-One Bank. Mathew’s younger brother Thomas is the Chief Financial Officer in the SFL. Although Mathew and Thomas are brothers in relation, they are not in talking terms. Thomas joined the SFL after the loan was disbursed by the Bank.

In the first meeting of the Committee of Creditors (CoC) it was decided to change the existing IRP and to appoint Brijesh as Resolution Professional.

The Information Memorandum was prepared and expression of interest was invited for resolution plan.

Two Resolution Proposals were submitted, details of which are as under :

(i)A company named as Dinesh Textiles Private Limited, submitted the resolution plan.

Dinesh who is the Managing Director of the company holds 90% of the equity and rest 10% is in the name of his wife Neeta. Dinesh Textiles Private Limited has availed loan from another bank and his account has been classified as Non-performing Account by that bank.

(ii)Harsh, another Resolution Applicant was convicted and remained in imprisonment for two years under the provisions of the Prevention of Money Laundering Act, 2002. He was released in December 2021.

On the above background, referring relevant case laws, provisions of the Insolvency and Bankruptcy Code, 2016 and Regulations made by IBBI, answer the following questions :

(ii)Will your answer differ, if the SFL has not defaulted in servicing the credit facility granted by the A-One Bank but still want to initiate the CIRP ?

December 2025Q. 2(a)(i)2 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(a)Suruchi Fabrics Limited (SFL) availed term loan of ₹ 10 Crore and cash credit facility of ₹ 2 Crore from A-One Bank Ltd. Since the SFL was unable to service the loan, the Board of Directors of the company passed a resolution to initiate Corporate Insolvency Resolution Process (CIRP) and proposed the name of Aneri, an Insolvency Professional to act as Interim Resolution Professional (IRP). Apart from the credit facility from the A-One Bank, SFL have no other financial creditor. However, SFL have outstanding dues towards its operational creditors amounting to ₹ 25 Crore.

Mathew is the Company Secretary of A-One Bank. Mathew’s younger brother Thomas is the Chief Financial Officer in the SFL. Although Mathew and Thomas are brothers in relation, they are not in talking terms. Thomas joined the SFL after the loan was disbursed by the Bank.

In the first meeting of the Committee of Creditors (CoC) it was decided to change the existing IRP and to appoint Brijesh as Resolution Professional.

The Information Memorandum was prepared and expression of interest was invited for resolution plan.

Two Resolution Proposals were submitted, details of which are as under :

(i)A company named as Dinesh Textiles Private Limited, submitted the resolution plan.

Dinesh who is the Managing Director of the company holds 90% of the equity and rest 10% is in the name of his wife Neeta. Dinesh Textiles Private Limited has availed loan from another bank and his account has been classified as Non-performing Account by that bank.

(ii)Harsh, another Resolution Applicant was convicted and remained in imprisonment for two years under the provisions of the Prevention of Money Laundering Act, 2002. He was released in December 2021.

On the above background, referring relevant case laws, provisions of the Insolvency and Bankruptcy Code, 2016 and Regulations made by IBBI, answer the following questions :

(i)On the basis of the information given in the case whether SFL can initiate the corporate insolvency resolution process (CIRP) ? Refer relevant provisions of the Code.

December 2024Q. 2(b)(ii)4 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(b)Jayparan (“Jay” in short), has paid a sum of ₹ 4 crore to RD Developers Private Limited (hereinafter referred as ‘Corporate Debtor’) who was engaged in real estate business. This sum of ₹ 4 crore was paid in 2010 as earnest money against advance sale consideration for booking of a flat. Since there was no progress in the said project until 2014, Jay sought refund of the earnest money following which the Corporate Debtor assured to return the same with interest @ 12% per annum.

Since then, the sum of ₹ 4 crore was mutually treated as unsecured loan and reflected accordingly in the books of the account of the Corporate Debtor. Interest thereon was paid by the Corporate Debtor and TDS was also deducted thereon for which confirmation of books of accounts was periodically sought from Jay. Thus, it was contended that the Corporate Debtor by his own conduct changed the status of the home-buyer to a Financial Creditor.

The Corporate Debtor paid regular interest till FY 2016-17. On the grounds of liquidity and financial crunch, he sought waiver of interest from Jay which request was, however declined.

It is the contention of Mr. Jay that the Corporate Debtor thereafter, defaulted in making interest payment since 1st October, 2017 and continued to default from FY 2017-18 until FY 2020-21 except for part repayment in 2018. It is further submitted that on the demise of Mr.

Jay during October 2018, the loan amount was transferred to the name of his wife, Kushma Jayparan which stands confirmed from the confirmation of account for FY 2019-20 signed by the Directors of the Corporate Debtor.

On account of non-payment of debt, a letter dated 1st February, 2021 was sent by Kushma Jayparan to the Corporate Debtor demanding a sum of ₹ 6.20 crores which included principal amount of ₹ 4.09 crores and ₹ 2.11 crores as interest. Since the amount remained outstanding, on behalf of Jay, his wife filed an application under Section 7 of the IBC on 6th October, 2021 for initiating a Corporate Insolvency Resolution Process (CIRP) against the Corporate Debtor for the default committed.

The learned Counsel of the Corporate Debtor contended that there was no agreement between Jay and the Corporate Debtor with respect to the amount advanced by him and further, the amount paid by Jay is as an Advance amount for buying a flat under development of the Corporate Debtor. Hence, Jay is only a home buyer and not a Financial Creditor of unsecured loans. It is also the contention of the Corporate Debtor that the investment was made by the Jay to receive returns on investment from the Corporate Debtor. Hence, the sum advanced was in the nature of speculative investment and cannot be treated as a financial debt.

The Adjudicating Authority viewed that as no time period was stipulated in the demand notice, it may be held that no default had occurred and also this date fell in the prohibited period under Section 10A of the IBC, 2016. Thus, the Adjudicating Authority held that in both these circumstances, Section 7 application was non-maintainable. Aggrieved with the findings of the Adjudicating Authority, the wife of Jay preferred an appeal before the National Company Law Appellate Tribunal.

Referring to the relevant case laws and the applicable provisions of the IBC, 2016 and the Regulations made thereunder, answer the following questions :

(ii)In the light of the provisions of Section 10A of the IBC, 2016, state the legal position if default is committed by the Corporate Debtor during the period between 1st February, 2020 to 1st August, 2020 ?

June 2023Q. 5(b)6 marksSyllabus 2017

(b)Scenario Observations made by Rubin on

eligibility to initiate corporate insolvency resolution process (CIRP)

A Ltd. who owes ₹ 5 crore from B A Ltd. is eligible Ltd. under a contract for supply of goods C Ltd., undergoing CIRP, intends to C Ltd. is not eligible file an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (the Code) against an outstanding amounting to ₹ 70 crore from a debto B Pvt. Ltd. has lent money to Z Ltd. B Pvt. Ltd. is eligible Total outstanding amount including interest is ₹ 95 lakh

Examine whether the observations are in accordance with the provisions of the Code?

December 2019Q. 4(b)(i)3 marksSyllabus 2017

(b)(i) Under what circumstances Debtor is not entitled to make an application to the NCLT ?

December 2025Q. 1(e)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow :

Arya is a Practicing Company Secretary and Insolvency Professional. She renders Corporate Advisory Services and very often delivers guest lectures in Financial Institutions, Banks and Management and Law Colleges on the topics of Corporate Insolvency, Restructuring and Fund Raising.

R. K. Institute of Management and Technology (RK-IMT) is a reputed management college in Jaipur.

RK-IMT was established in the year 2000 and this year the college in completing its glorious 25 years.

The RK-IMT planned for its Silver Jubilee and organized a whole week of celebrations. During this week the college organized various programs / activities viz: Sports Day, Debate Competition, Cultural Evening, Seminars, Workshop etc.

Arya was invited to address a seminar on the topic of Corporate Insolvency. Arya explained the objectives and purposes of the Insolvency and Bankruptcy Code, 2016 (IBC) and touched the key points relating to Financial Creditor, Operational Creditor, Corporate Debtor, Default, Initiation of Corporate Insolvency, Constitution of Committee of Creditors, and Insolvency Resolution Process Period etc. After delivering a thought-provoking lecture, Arya invited the audiences to raise queries on the topic.

Vedika, a student of the college, was curious to know more about Insolvency Law. She exclaimed to know that the IBC is a totally new concept and prior to this enactment whether there was any such law on insolvency existed in India. Arya clarified the position.

Reyansh, an Associate Professor of the college, was curious to know that whether IBC is an effective recovery tool and the lending institution can effectively exercise its control over the debtor through the Resolution Professional. Arya again clarified the doubts of Reyansh referring the objectives and purpose of IBC.

As a lecturer of the Institute, Rohil shared his own experience, he booked a 2-BHK Flat in Swarnim Galaxy, a building project of Swarnim Builders Limited (Swarnim Builders), and paid upto 90% of the purchase price to the builder, Swarnim Builders, on various stages. Ten per cent (10%) of the purchase price was to be paid at the time of taking the possession which was due in December,

2023. However, the possession of the flat was not given by the Builder to him. Rohil is not the only allottee but all the other allottees who had booked the flat in the Swarnim Galaxy were not given the possession and the Builder was taking excuses by narrating false reasons. Rohil narrated the whole story before the Arya and requested if she could help him. Arya asked Rohil to let her know the details of the project and relevant information to proceed in the case.

Rohil meets Arya at her office and submits her the details of the project available with him. Arya studies about the project and also checks the financial statements of Swarnim Builders, which are filed with Registrar of Companies. On scrutiny of financial statements, Arya found out that Rishabh Suppliers Limited (RSL), one of the major suppliers of Swarnim Builders had supplied the construction materials to Swarnim Builders amounting to ₹ 15 crore. On scrutiny of RSL’s financial statements, Arya has found out that RSL has assigned its book debts at a discount of 3% in favour of the Moon star Financiers Limited (MFL) a NBFC Company.

Based on the above factual background, answer the following questions :

(e)Whether the Corporate Insolvency Resolution Process (CIRP) initiated against Swarnim Builders, is required to be completed within a fixed time frame ? If so, what is the time limit for completion of CIRP and whether any extension can be granted by the Adjudicating Authority ? Also specify the grounds of exclusion of certain period for the purpose of counting the total period of Insolvency Resolution Process.

December 2020Q. 1(b)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the following carefully and answer the questions given at the end:

BSC Bank filed an application for initiating Corporate Insolvency Resolution Process (CIRP) against one of its borrower company M/s Moon Storm Pvt. Ltd., in the National Company Law Tribunal (NCLT). The NCLT allowed the application and passed order for commencement of CIRP. Rohit has been appointed as Interim Resolution Professional (IRP) and moratorium was declared.

The Committee of Creditor (CoC) was constituted and Rohit was appointed as Resolution Professional by CoC. Meetings of the CoC was convened from time to time and expression of interest for Resolution Plan was invited from various parties via public notice. However, no Resolution Plan was received during the currency of 180 days period. Hence, NCLT on the recommendation of RP extended the initial time period from 180 days to 270 days. Since, no one had shown the expression of interest even during the extended period of 270 days, the CoC appointed another Resolution Professional (RP) after the expiry of 270 days.

When the matter of resolution could not be completed within the extended time.

NCLT, extended the period of CIRP by further period of 90 days after the expiry of 270 days by exercising the power conferred under Section 55 of Insolvency and Bankruptcy Code, 2016 by treating the matter as ‘Fast Track Corporate Insolvency Resolution Process’ and also determined the ‘Corporate Insolvency Resolution Process fee’ and the ‘Cost’ incurred and payable to the Resolution Professional.

Aggrieved from the said order of the NCLT, the Resolution Professional preferred appeals against the order of the NCLT. In light of the above facts, answer the following questions :

(b)Whether Committee of Creditors has jurisdiction to replace the Resolution Professional after completion of 270 days.

December 2019Q. 1(b)8 marksSyllabus 2017Law changed
Law changed after this attempt: The answer says the AA may extend CIRP by a period not exceeding 90 days beyond 180 days under S.12(3) and does not mention the outer limit. S.12 was amended by the IBC (Amendment) Act, 2019 (w.e.f. 16.08.2019) to add a mandatory 330-day limit including extension and legal proceedings, and later amendments have further changed the S.12 timelines. The answer below reflects the law as it stood for December 2019.
Show the facts common to all parts of Q. 1

Facts of the case :

Richa Infrastructure Limited engaged in the construction of roads is in default in repayment of loans due to general slowdown in construction industry. Repeated follow-up by the financial institutions with the Corporate Debtor, ‘Richa Infrastructure Ltd.’ for submitting its specific plan for repayment of dues did not evoke any response.

One of the financial creditors filed a case against Richa Infrastructure Ltd. before the Debt Recovery Tribunal.

Richa Infrastructure Ltd. had issued some cheques to some Operational Creditors.

All the cheques issued to creditors were dishonored/returned by the banker due to insufficient funds in the account. Consequently, Operational Creditors issued legal notices to Richa Infrastructure Ltd, with clear intimation that if due amount is not paid within 15 days from the date of receipt of legal notice, criminal complaint shall be filed against Richa Infrastructure Ltd. under the Negotiable Instrument Act, 1881 and criminal complaints were filed. After a joint lenders meeting, all the financial institutions unanimously decided to apply under the provisions of the Insolvency and Bankruptcy Code, 2016 to the National Company Law Tribunal (NCLT) for starting the process of Insolvency Resolution. Their application was admitted by NCLT on 30th June, 2018 and orders were issued for commencement of a moratorium period of 180 days, appointment of an Interim Resolution Professional and issue of public announcement inviting claims from all concerned.

After public announcement and the responses thereto, following details were brought out :

(1)Financial debts due to unsecured creditors (F1) - ₹15 Crores.

(2)Workmen’s due for the period of 24 months preceding the liquidation commencement date (F2) - ₹25 Crores.

(3)Debts due to a secured creditor who has relinquished his security (F3) - ₹30 Crores.

(4)Amount due to the Central Government (F4) - ₹27 Crores.

(5)Debts due to a secured creditor after the enforcement of security interest (F5) -₹36 Crores.

Insolvency Resolution Professional (IRP) approached the promoters, directors and officials of Richa Infrastructure Ltd to provide the necessary information, documents, statutory records, books of accounts to verify the claims filed by creditors. The promoters, directors and officials of Richa Infrastructure Ltd. ignored the request of Resolution Professional.

M/s ANG & Associates, Chartered Accountants were the Statutory Auditors of Richa Infrastructure Ltd. They audited the accounts for the financial year end March, 2018 of Richa Infrastructure Ltd. and submitted the Annual Accounts for approval of the Board of Directors.

The Resolution Professional has appointed valuers and has received the valuation reports. The Resolution Professional then started the efforts to get resolution proposals.

However during the normal resolution process period of 180 days, no resolution proposal could be finalized. The Committee of Creditors decided that Resolution Professional should get the extension as per the provisions of Insolvency and Bankruptcy Code, 2016.

Based on the above facts, answer the following questions :

(b)Is it necessary that application for extension of time period of 90 days must be filed before the completion of 180 days ? What precautions should be taken by Insolvency Professional while applying to NCLT for extension of time period by 90 days ? Examine the issue by referring to decided case law, if any.

June 2024Q. 1(B)(i)6 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(B)Mr. Krish, an operational creditor, filed an application with the Adjudicating Authority (NCLT, Delhi) to initiate the Corporate Insolvency Resolution Process (CIRP) against M/s Master Mind Limited, and the application was accepted. On 10th July 2023, NCLT Delhi appointed Mr.

Aditya to act as an Interim Resolution Professional of M Limited. After the appointment, Mr.

Aditya issued the public announcement on 12th July 2023, of the initiation of CIRP process and called for the submission of claims. On 20th July 2023, the Committee of Creditors was constituted by Mr. Aditya.

Thereafter, Mr. Krish wants to withdraw his application under Section 12A of the Insolvency and Bankruptcy Code, 2016. However, Mr. Aditya denied filing a withdrawal application stating that the Committee of Creditors has already been constituted.

Referring to the provisions of the Insolvency and Bankruptcy Code, 2016, answer the following with reference to the above facts :

(i)Is Mr. Aditya right to deny Mr. Krish to file a withdrawal application with NCLT, Delhi ?

Explain in detail.

June 2024Q. 1(B)(iii)3 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(B)Mr. Krish, an operational creditor, filed an application with the Adjudicating Authority (NCLT, Delhi) to initiate the Corporate Insolvency Resolution Process (CIRP) against M/s Master Mind Limited, and the application was accepted. On 10th July 2023, NCLT Delhi appointed Mr.

Aditya to act as an Interim Resolution Professional of M Limited. After the appointment, Mr.

Aditya issued the public announcement on 12th July 2023, of the initiation of CIRP process and called for the submission of claims. On 20th July 2023, the Committee of Creditors was constituted by Mr. Aditya.

Thereafter, Mr. Krish wants to withdraw his application under Section 12A of the Insolvency and Bankruptcy Code, 2016. However, Mr. Aditya denied filing a withdrawal application stating that the Committee of Creditors has already been constituted.

Referring to the provisions of the Insolvency and Bankruptcy Code, 2016, answer the following with reference to the above facts :

(iii)Who is the authority to pass the final order of withdrawal application ?

June 2024Q. 3(a)(iv)7 marksSyllabus 2022
Show the facts common to all parts of Q. 3

(a)Suhani and Dhwani are childhood friends and were very fond of designing Indian traditional dresses. After completing their schooling, Suhani joined a fashion designing course to pursue her interest and Dhwani decided to be a fashion Model. She participated in various fashion show programs conducted by Non-Government Organisation(s) engaged in the creating awareness for cervical cancer which is spreading rapidly among Ladies in India.

After some years, in one of the fashion programmes, they met again and planned to form a private Limited Company in the name of Suhani Fashions Private Limited having a paid-up share capital of 5 Crore and became Entrepreneurs.

Suhani Fashions Pvt. Ltd. is engaged in the business of Manufacturing and Selling Ladies Suits and Sarees in Kolkata, West Bengal which is a very big market for Indian traditional dresses.

They also offered their products on online e-commerce platforms. They employed more than 100 Ladies and other staff in their workshop who were engaged in designing, cutting, tailoring and other allied works. Suhani also used to design products being sold by the company.

Both Suhani and Dhwani were Promoter Directors of the company as per the Article of Association of the company and also the subscribers to the Memorandum of Association of the company by subscribing 50% shares each in the company. Dhwani, being a fashion model, did modelling for her products in order to improve the sales of the company. The company started growing very fast and sales touched a figure of ₹ 20 crores in the very first year and in order to meet the working capital and other requirements, the company approached the bankers Beta bank and Gama Bank for a facility of ₹ 3 crores and ₹ 5 crores respectively. The Company already had taken the credit facilities with Alpha Bank and outstanding amount is ₹ 6 crores.

After the change in demand of the products and growing need of Formal dresses from the Indian traditional dresses, sales started declining and the company started facing cash crunch and made a default in paying the instalments for ₹ 2 crores which were outstanding in the name of the Alpha bank.

The Alpha bank decided to file an Insolvency Petition under Section 7 of the Insolvency and Bankruptcy Code, 2016 as a financial Creditor on 3rd January, 2024. The Corporate Insolvency Resolution Process application was admitted by the Adjudicating Authority on 25th January, 2024. Moratorium was declared and Ishann was appointed as an Interim Resolution Professional. Ishaan, Interim Resolution Professional made a public announcement and prepared a list of creditors based on the claims received. The CoC is yet to be formed.

Consider the above facts and answer the following questions :

(iv)State the provisions of Insolvency and Bankruptcy Code for withdrawal of application admitted under section 7, 9 and 10 by the applicant. Can it be withdrawn after its admission but before the constitution of CoC. Explain with the help of the case laws.

December 2020Q. 3(b)6 marksSyllabus 2017

(b)An Operational Creditor of a Company has made an application to National Company Law Tribunal (NCLT) for initiating Corporate Insolvency Resolution Process (CIRP) for non-payment his dues for long time. The NCLT ordered for commencement of CIRP. During the course of CIRP period Corporate Director has agreed to settle the dues of Operational Creditor and requested him to withdraw the CIRP. Whether NCLT may allow the withdrawal of application admitted under Insolvency and Bankruptcy Code, 2016 in the above case. Will your answer differ, if the above application is made by Financial Creditor and subsequently Corporate Debtor settle its dues?

December 2022Q. 1(a)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

JCP Industries Ltd (JIL) was incorporated in the year 2011 with an authorized share capital of ₹2,000 crore having its registered office located in Mumbai with the main objects to carry out the business (a) manufacturing of heavy duty earth moving machinery and their spare parts (b) purchase, sale, construction of multi-story commercial and residential apartments under own name or as under Joint Development Agreements (c) Mining of minerals and thereafter refining and processing them for sale; and (d) doing the business in the hospitality sector by running and maintaining Hotels, Resorts and Budget Hotels. The paid-up share capital of the company as on date is ₹1,750 crore.

During the course of business, the company has approached various banks, state finance corporations and NBFCs for availing financial assistance in the nature of term loans and other facilities. However, based on the business plans and security offered, the finance proposal was approved by National Bank of India (the Bank) in the form of both fund based and non-fund based limits. The company during the course of its business operations was also availing credit for 90 days to 120 days from its creditors in connection with the purchase of raw material being used in the business of manufacturing heavy duty earth moving machineries, real estate, mining and hospitality sectors. The progress of the company since its incorporation till 31st March, 2019 was exceptional. However, because of certain transactions carried out by the directors with their relatives and other parties between 1st July, 2020 to 30th June, 2021 which were in the nature purchase of raw-material for different business segments of the company including the purchase of immovable properties as well as transferring and sale of goods and assets of the company to such related and other parties by givingthem preference over the other buyers ultimately resulted into mismatch in the cash flows and consequently resulted into losses to the company.

With an intention to grow organically, the company also incorporated a wholly owned subsidiary in the year 2017 under the name of JCP Buildcon Ltd (JAL) which was mainly engaged in the real estate business involving construction of apartments and flats in multi-story buildings under the Joint Development Agreements being entered into with the various parties including various State Governments under Housing Schemes. JAL entered into a tripartite Joint Development Agreement with Jaipur Development Authority (JDA) for construction of apartments and flats in multi-story buildings after development of land belonging to JDA. In an attempt to extend support to JIL, JAL had also mortgaged its assets in favour of banks in the month of August, 2018 when additional financial assistance was provided to JIL.

The financial condition of JIL started deteriorating after July, 2019 because of reduction in the business activities as well as default being committed in honoring the debt obligations towards banks, payment to trade creditors and delays in construction of apartments to be handed over to the buyers who had entered into agreements with the company and have paid almost 95% of the cost of the apartment.

The banks, trade creditors and buyers of the flats were constantly making follow up with the management but no reply was given to them by the management of JIL as well as JAL. National Bank of India during their internal review meeting informed their legal team that the promoter/directors may have siphoned off the money which was supposed to have been used for business purposes; since it appears to them that the amounts have been advanced to related parties and diverted towards a few suspicious transactions.

The bank despite the continuous follow up with the management and the Board of directors could not get any suitable response relating to the repayment plan to honor the debt obligations.

Considering the situation and based on the recommendation of their legal department, the bank decided to take action against the company under the Insolvency and Bankruptcy Code, 2016 (the Code) and thus filed an application on 16th February, 2022 before the Adjudicating Authority (AA) for initiating Corporate Insolvency Resolution Process (CIRP). In the application, the Bank had proposed name of Robin to act as Interim Resolution Professional (IRP). Simultaneously, other lenders of JAL also submitted an application before the AA to initiate CIRP against JAL for default in repayment of their dues.

After hearing the parties, the AA admitted the applications in the case of JIL and JAL on 25th April, 2022 and also confirmed the appointment of Robin as IRP in both the companies. In the case of JIL, Robin constituted a Committee of Creditors (CoC) on 15th May, 2022 and called first meeting of the CoC on 20th May, 2022. The constitution of CoC by Robin was challenged by the operational creditors as well as home buyers since their name was not included in the list of the CoC. Further, the members of the suspended Board of directors of JIL also challenged the actions of Robin who did not allow their participation in the first meeting of the CoC.

During the first meeting of the CoC in the case of JIL, Robin was confirmed to act as Resolution Professional (RP) by the CoC and was asked to invite the Expression of Interest (EoI) from the Resolution Applicants (RA) for submitting Resolution Plan.

Besides the above, JDA has also issued notice to JAL for taking over possession of the land given for the purpose of construction.

Considering the above facts answer the following questions :

(a)The AA on admitting the application for CIRP against the corporate debtor and confirming the appointment of IRP is also required to issue various other orders as per the Code. State the necessity of making such further orders by the AA against the corporate debtor when the order for initiating CIRP stands approved and appointment of IRP has also been made.

June 2025Q. 1(a)(i)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

(a)Read the following and answer the questions below based on the relevant case laws and the applicable provisions of the Insolvency and Bankruptcy Code, 20l6 (‘IBC, 2016’) and the Regulations made thereunder in this regard.

Facts of the case Thakur Engineering Products Private Limited [‘the company’] engaged in the business Industrial Machinery supplies. It got Machinery supplies worth ₹ 21,10,11,054/- from a supplier (‘Respondent’), which was due and payable by the company. Several cheques were issued by the company in favour of the respondent towards amounts payable for supplies, all of which were returned dishonoured for the reason “funds insufficient”.

As a result, the respondent issued a statutory demand notice under Section 138 read with Section 141 of the Negotiable Instruments Act, l88l (‘NI Act’), calling upon the company and its three Directors, to pay the amount within 15 days of the receipt of the notice.

Subsequently, two cheques for a total amount of ₹ 90,80,123/- presented by the respondent for encashment were returned dishonoured for the reason “funds insufficient”. A second demand notice was therefore issued under the same Sections by the respondent, calling upon the company and the appellants to pay this amount within l5 days of the receipt of the notice.

Since no payment was forthcoming pursuant to the two statutory demand notices, two criminal complaints, were filed by the respondent against the company and the appellants under Section 138 read with Section 141 of the Negotiable Instruments Act before the Additional Chief Metropolitan Magistrate [‘ACMM’]. Summons were issued by the ACMM to the company and the appellants in both the criminal complaints.

Meanwhile, as a statutory notice under Section 8 of the IBC, 20l6 had been issued by the respondent to the company, and an order was passed by the Adjudicating Authority admitting the application under Section 9 of the IBC and directing commencement of the corporate insolvency resolution process with respect to the company, a moratorium in terms of Section 14 of the IBC was ordered.

Pursuant thereto, the Adjudicating Authority stayed further proceedings in the two criminal complaints pending before the ACMM. In an appeal filed to the National Company Law Appellate, Tribunal (‘NCLAT’), the NCLAT set aside this order, holding that Section 138, being a criminal law provision, cannot be held to be a “proceeding” within the meaning of Section 14 of the IBC, 20l6. In an appeal filed before the Court, the Court ordered a stay of further proceedings in the two complaints pending before the learned ACMM.

Subsequent thereto, since a resolution plan submitted by the promoters of the company had been approved by the committee of creditors, the Adjudicating Authority approved such plan as a result of which, the moratorium order ceased to have effect. It may only be added that at present, an application for withdrawal of approval of this resolution plan has been filed by the financial creditors of the company before the Adjudicating Authority.

Equally, an application to extend time for implementation of this plan has been filed by the resolution applicant before the Adjudicating Authority. Both these applications have yet to be decided by the Adjudicating Authority.

On the above background, referring the provisions of IBC, 2016 and applicable case laws answer following questions :

(i)What is the main purpose of the moratorium under Section l4 of the IBC, 20l6, and how did the Supreme Court apply it to Section 138 of the NI Act ?

June 2025Q. 1(a)(iii)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

(a)Read the following and answer the questions below based on the relevant case laws and the applicable provisions of the Insolvency and Bankruptcy Code, 20l6 (‘IBC, 2016’) and the Regulations made thereunder in this regard.

Facts of the case Thakur Engineering Products Private Limited [‘the company’] engaged in the business Industrial Machinery supplies. It got Machinery supplies worth ₹ 21,10,11,054/- from a supplier (‘Respondent’), which was due and payable by the company. Several cheques were issued by the company in favour of the respondent towards amounts payable for supplies, all of which were returned dishonoured for the reason “funds insufficient”.

As a result, the respondent issued a statutory demand notice under Section 138 read with Section 141 of the Negotiable Instruments Act, l88l (‘NI Act’), calling upon the company and its three Directors, to pay the amount within 15 days of the receipt of the notice.

Subsequently, two cheques for a total amount of ₹ 90,80,123/- presented by the respondent for encashment were returned dishonoured for the reason “funds insufficient”. A second demand notice was therefore issued under the same Sections by the respondent, calling upon the company and the appellants to pay this amount within l5 days of the receipt of the notice.

Since no payment was forthcoming pursuant to the two statutory demand notices, two criminal complaints, were filed by the respondent against the company and the appellants under Section 138 read with Section 141 of the Negotiable Instruments Act before the Additional Chief Metropolitan Magistrate [‘ACMM’]. Summons were issued by the ACMM to the company and the appellants in both the criminal complaints.

Meanwhile, as a statutory notice under Section 8 of the IBC, 20l6 had been issued by the respondent to the company, and an order was passed by the Adjudicating Authority admitting the application under Section 9 of the IBC and directing commencement of the corporate insolvency resolution process with respect to the company, a moratorium in terms of Section 14 of the IBC was ordered.

Pursuant thereto, the Adjudicating Authority stayed further proceedings in the two criminal complaints pending before the ACMM. In an appeal filed to the National Company Law Appellate, Tribunal (‘NCLAT’), the NCLAT set aside this order, holding that Section 138, being a criminal law provision, cannot be held to be a “proceeding” within the meaning of Section 14 of the IBC, 20l6. In an appeal filed before the Court, the Court ordered a stay of further proceedings in the two complaints pending before the learned ACMM.

Subsequent thereto, since a resolution plan submitted by the promoters of the company had been approved by the committee of creditors, the Adjudicating Authority approved such plan as a result of which, the moratorium order ceased to have effect. It may only be added that at present, an application for withdrawal of approval of this resolution plan has been filed by the financial creditors of the company before the Adjudicating Authority.

Equally, an application to extend time for implementation of this plan has been filed by the resolution applicant before the Adjudicating Authority. Both these applications have yet to be decided by the Adjudicating Authority.

On the above background, referring the provisions of IBC, 2016 and applicable case laws answer following questions :

(iii)In a case with similar facts, Supreme Court made a landmark decision, how does this decision affect the creditors who have initiated Section 138 proceedings against a company undergoing Corporate Insolvency Resolution Process (CIRP) ?

June 2025Q. 1(a)(iv)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

(a)Read the following and answer the questions below based on the relevant case laws and the applicable provisions of the Insolvency and Bankruptcy Code, 20l6 (‘IBC, 2016’) and the Regulations made thereunder in this regard.

Facts of the case Thakur Engineering Products Private Limited [‘the company’] engaged in the business Industrial Machinery supplies. It got Machinery supplies worth ₹ 21,10,11,054/- from a supplier (‘Respondent’), which was due and payable by the company. Several cheques were issued by the company in favour of the respondent towards amounts payable for supplies, all of which were returned dishonoured for the reason “funds insufficient”.

As a result, the respondent issued a statutory demand notice under Section 138 read with Section 141 of the Negotiable Instruments Act, l88l (‘NI Act’), calling upon the company and its three Directors, to pay the amount within 15 days of the receipt of the notice.

Subsequently, two cheques for a total amount of ₹ 90,80,123/- presented by the respondent for encashment were returned dishonoured for the reason “funds insufficient”. A second demand notice was therefore issued under the same Sections by the respondent, calling upon the company and the appellants to pay this amount within l5 days of the receipt of the notice.

Since no payment was forthcoming pursuant to the two statutory demand notices, two criminal complaints, were filed by the respondent against the company and the appellants under Section 138 read with Section 141 of the Negotiable Instruments Act before the Additional Chief Metropolitan Magistrate [‘ACMM’]. Summons were issued by the ACMM to the company and the appellants in both the criminal complaints.

Meanwhile, as a statutory notice under Section 8 of the IBC, 20l6 had been issued by the respondent to the company, and an order was passed by the Adjudicating Authority admitting the application under Section 9 of the IBC and directing commencement of the corporate insolvency resolution process with respect to the company, a moratorium in terms of Section 14 of the IBC was ordered.

Pursuant thereto, the Adjudicating Authority stayed further proceedings in the two criminal complaints pending before the ACMM. In an appeal filed to the National Company Law Appellate, Tribunal (‘NCLAT’), the NCLAT set aside this order, holding that Section 138, being a criminal law provision, cannot be held to be a “proceeding” within the meaning of Section 14 of the IBC, 20l6. In an appeal filed before the Court, the Court ordered a stay of further proceedings in the two complaints pending before the learned ACMM.

Subsequent thereto, since a resolution plan submitted by the promoters of the company had been approved by the committee of creditors, the Adjudicating Authority approved such plan as a result of which, the moratorium order ceased to have effect. It may only be added that at present, an application for withdrawal of approval of this resolution plan has been filed by the financial creditors of the company before the Adjudicating Authority.

Equally, an application to extend time for implementation of this plan has been filed by the resolution applicant before the Adjudicating Authority. Both these applications have yet to be decided by the Adjudicating Authority.

On the above background, referring the provisions of IBC, 2016 and applicable case laws answer following questions :

(iv)If a personal guarantor for Thakur Engineering Products Private Limited had also issued a cheque which had bounced, would the Section l4 moratorium apply to the personal guarantor ? Why or why not ?

June 2025Q. 1(a)(vi)4 marksSyllabus 2022
Show the facts common to all parts of Q. 1

(a)Read the following and answer the questions below based on the relevant case laws and the applicable provisions of the Insolvency and Bankruptcy Code, 20l6 (‘IBC, 2016’) and the Regulations made thereunder in this regard.

Facts of the case Thakur Engineering Products Private Limited [‘the company’] engaged in the business Industrial Machinery supplies. It got Machinery supplies worth ₹ 21,10,11,054/- from a supplier (‘Respondent’), which was due and payable by the company. Several cheques were issued by the company in favour of the respondent towards amounts payable for supplies, all of which were returned dishonoured for the reason “funds insufficient”.

As a result, the respondent issued a statutory demand notice under Section 138 read with Section 141 of the Negotiable Instruments Act, l88l (‘NI Act’), calling upon the company and its three Directors, to pay the amount within 15 days of the receipt of the notice.

Subsequently, two cheques for a total amount of ₹ 90,80,123/- presented by the respondent for encashment were returned dishonoured for the reason “funds insufficient”. A second demand notice was therefore issued under the same Sections by the respondent, calling upon the company and the appellants to pay this amount within l5 days of the receipt of the notice.

Since no payment was forthcoming pursuant to the two statutory demand notices, two criminal complaints, were filed by the respondent against the company and the appellants under Section 138 read with Section 141 of the Negotiable Instruments Act before the Additional Chief Metropolitan Magistrate [‘ACMM’]. Summons were issued by the ACMM to the company and the appellants in both the criminal complaints.

Meanwhile, as a statutory notice under Section 8 of the IBC, 20l6 had been issued by the respondent to the company, and an order was passed by the Adjudicating Authority admitting the application under Section 9 of the IBC and directing commencement of the corporate insolvency resolution process with respect to the company, a moratorium in terms of Section 14 of the IBC was ordered.

Pursuant thereto, the Adjudicating Authority stayed further proceedings in the two criminal complaints pending before the ACMM. In an appeal filed to the National Company Law Appellate, Tribunal (‘NCLAT’), the NCLAT set aside this order, holding that Section 138, being a criminal law provision, cannot be held to be a “proceeding” within the meaning of Section 14 of the IBC, 20l6. In an appeal filed before the Court, the Court ordered a stay of further proceedings in the two complaints pending before the learned ACMM.

Subsequent thereto, since a resolution plan submitted by the promoters of the company had been approved by the committee of creditors, the Adjudicating Authority approved such plan as a result of which, the moratorium order ceased to have effect. It may only be added that at present, an application for withdrawal of approval of this resolution plan has been filed by the financial creditors of the company before the Adjudicating Authority.

Equally, an application to extend time for implementation of this plan has been filed by the resolution applicant before the Adjudicating Authority. Both these applications have yet to be decided by the Adjudicating Authority.

On the above background, referring the provisions of IBC, 2016 and applicable case laws answer following questions :

(vi)Whether moratorium imposed under Section 14 and 85 of IBC, 2016 are subject specific ? Whether Section 14(1) applies only to legal proceedings ? Explain in detail quoting the relevant provisions of the IBC.

December 2022Q. 2(d)1 markSyllabus 2017
Show the facts common to all parts of Q. 2

Ruby and Emerald Pvt. Ltd (REPL), incorporated on 1st April, 2013 has its registered office in Surat. Gems and Gems Pvt. Ltd (GGPL), incorporated on 11th September, 2014 has its registered office in Jaipur. REPL was approached by GGPL for procuring its goods which can be used as raw material in the factory of REPL. It was agreed through a contract between REPL and GGPL that upon procurement of the goods entire payment shall be made by REPL within 10 days of issuance of the tax invoice.

The transaction was smoothly going between REPL and GGPL without any delays in supply of goods and payment. Owner of REPL died due to cardiac arrest and the business operations of REPL were severely affected. REPL started supplying faulty goods to its customers and the quality of raw material being supplied by the suppliers also deteriorated gradually. As on 2nd January, 2021, there were no dues outstanding towards GGPL and balance confirmation from GGPL was also taken by REPL.

However, between 3rd January, 2021 and 31st May, 2021 various transactions happened between REPL and GGPL. GGPL requested for the payments multiple times for such transaction between 3rd January, 2021 and 31st May, 2021; however, GGPL kept supplying goods in good faith based on relationship with REPL. REPL neither responded to requestsof GGPL nor stopped buying goods from them. Because of the long overdue from REPL, GGPL sent a demand notice on 16th June, 2021 through their lawyer to make the payment of entire outstanding to the tune of ‘ 1,25,00,000/- exclusive of interest @ 15% p.a. within 10 days from the receipt of the notice, failing which GGPL will take suitable actions under the law. No communication whatsoever was received from REPL. Therefore, as per the directions of the lawyer, GGPL filed an application to initiate Corporate Insolvency Resolution Process (CIRP)

against REPL. Also, they have sent a letter to the power company to disconnect the supply of electricity to REPL considering that they are not in a position to pay their dues Considering the above facts answer the following questions :

(d)Whether moratorium as envisaged under the Insolvency and Bankruptcy Code, 2016 is applicable in the present case ?

June 2022Q. 2(a)6 marksSyllabus 2017

(a)An Application for initiation of Corporate Insolvency Resolution Process (CIRP)

was filed against a Corporate Debtor (CD) and the following four Banks submitted their claims as under :

A Bank Limited 14 crore, B Bank Limited 3.26 crore, C Bank Limited 18.27 crore, and D Bank Limited 8.99 crore.

It was the case of consortium finance.

The Corporate Debtor filed an appeal before National Company Law Appellate Tribunal (NCLAT) challenging the order of admission of CIRP, which was ultimately upheld by Supreme Court. NCLAT in another order, directed the Resolution Professional (RP) to keep the company as a going concern and the bankers were also directed to co-operate with the Resolution Professional in this regard.

The banks allowed continuous operations in the company’s account through which the company was also routing all the business cash in the normal course of its business.

In the course of these operations, the Corporate Debtor’s outstanding dues under the said accounts got gradually liquidated through its surplus cash flows accruing out of its increasing cash profits. As the Corporate Debtor was making good profit and had accumulated adequate cash balance, the erstwhile RP opted to reduce the utilization of the Fund-based facilities and thus squared off the Cash Credit (CC) facilities with all the banks. In the meantime, in one of the meeting of the Committee of Creditors (CoC), new RP was proposed, which was approved by the Adjudicating Authority. The new RP asked the banks to reverse the amounts remitted by the previous RP while discharging his duties as per the provisions of the Insolvency and Bankruptcy Code, 2016 (IBC) and its Regulations thereof. The lenders consortium contended that the operation in the accounts was allowed as per the directions of Tribunal and that the credit was received in the normal course of business. Meanwhile the Resolution Plan was also approved by Adjudicating Authority.

In light of the above facts, discuss, whether the contention of lenders consortium is correct ?

December 2024Q. 5(a)6 marksSyllabus 2017

(a)Gold Crown Flat Buyers Association (herein after referred to as ‘Flat Buyers Association’)

is a registered Association of Residential Flat Buyers in respect of the flats promoted and constructed by Gold Crown Developers Private Limited (herein after referred as the “Developer Company”) in the city of Pune. Besides the location of the project being in the heart of the city, planned and developed with a host of amenities including compliance with Vasthu Sashtra, many home buyers invested in the Project and eventually formed the aforesaid association.

Unfortunately, the Developer Company was not able to complete the project due to various reasons and crossed various timelines fixed by them. Despite various attempts made by the Flat Buyers Association requesting the Management of the Company for earliest completion of the project, it was all in vain and the project got further delayed.

In view of the above situation, as most of members expressed their dissatisfaction over the delay, the Flat Buyers Association filed a complaint before the National Consumer Disputes Redressal Commission (the National Commission). After hearing the parties of their submissions, an order was made by the National Commission directing the Developer Company to complete the project in all respects and handover the possession of the allotted flats to the members of the Association of the homebuyers within the time specified.

In the meantime, one of the Operational Creditors of the Developer Company, filed an application under Section 9 of the IBC, 2016 and the said application was admitted by the Honourable NCLT.

The National Commission, by its order, held that a decree cannot be executed against the Developer Company in view of the operation of Moratorium granted under Section 14 of the IBC, 2016. The National Commission also observed that in view of the moratorium against the Developer Company, it would not be appropriate to proceed in the same execution against the Directors and Officers of the Company. Also, there was no finding recorded by the National Commission that in view of the provisions of the IBC, 2016, moratorium will apply to the directors and officers of the company.

Aggrieved by the Order of the National Commission, the Flat Buyers Association filed an appeal before the Honourable Supreme Court of India with an understanding that just because there is a moratorium against the company, it cannot be said that no proceedings can be initiated against the opposite party for execution, provided they are otherwise liable to abide by and comply with the order, which is passed against the company.

In the light of the provisions of the IBC, 2016 and the decided case laws state whether the Flat Buyers Association will succeed in their appeal who are aggrieved by the order of the National Commission with respect to Directors and Officers of Corporate Debtor to take protection of the moratorium ?

December 2019Q. 1(c)8 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Facts of the case :

Richa Infrastructure Limited engaged in the construction of roads is in default in repayment of loans due to general slowdown in construction industry. Repeated follow-up by the financial institutions with the Corporate Debtor, ‘Richa Infrastructure Ltd.’ for submitting its specific plan for repayment of dues did not evoke any response.

One of the financial creditors filed a case against Richa Infrastructure Ltd. before the Debt Recovery Tribunal.

Richa Infrastructure Ltd. had issued some cheques to some Operational Creditors.

All the cheques issued to creditors were dishonored/returned by the banker due to insufficient funds in the account. Consequently, Operational Creditors issued legal notices to Richa Infrastructure Ltd, with clear intimation that if due amount is not paid within 15 days from the date of receipt of legal notice, criminal complaint shall be filed against Richa Infrastructure Ltd. under the Negotiable Instrument Act, 1881 and criminal complaints were filed. After a joint lenders meeting, all the financial institutions unanimously decided to apply under the provisions of the Insolvency and Bankruptcy Code, 2016 to the National Company Law Tribunal (NCLT) for starting the process of Insolvency Resolution. Their application was admitted by NCLT on 30th June, 2018 and orders were issued for commencement of a moratorium period of 180 days, appointment of an Interim Resolution Professional and issue of public announcement inviting claims from all concerned.

After public announcement and the responses thereto, following details were brought out :

(1)Financial debts due to unsecured creditors (F1) - ₹15 Crores.

(2)Workmen’s due for the period of 24 months preceding the liquidation commencement date (F2) - ₹25 Crores.

(3)Debts due to a secured creditor who has relinquished his security (F3) - ₹30 Crores.

(4)Amount due to the Central Government (F4) - ₹27 Crores.

(5)Debts due to a secured creditor after the enforcement of security interest (F5) -₹36 Crores.

Insolvency Resolution Professional (IRP) approached the promoters, directors and officials of Richa Infrastructure Ltd to provide the necessary information, documents, statutory records, books of accounts to verify the claims filed by creditors. The promoters, directors and officials of Richa Infrastructure Ltd. ignored the request of Resolution Professional.

M/s ANG & Associates, Chartered Accountants were the Statutory Auditors of Richa Infrastructure Ltd. They audited the accounts for the financial year end March, 2018 of Richa Infrastructure Ltd. and submitted the Annual Accounts for approval of the Board of Directors.

The Resolution Professional has appointed valuers and has received the valuation reports. The Resolution Professional then started the efforts to get resolution proposals.

However during the normal resolution process period of 180 days, no resolution proposal could be finalized. The Committee of Creditors decided that Resolution Professional should get the extension as per the provisions of Insolvency and Bankruptcy Code, 2016.

Based on the above facts, answer the following questions :

(c)Can criminal proceedings under Section 138 of Negotiable Instrument Act, 1881 continue even after initiation of Corporate Insolvency Resolution Process ?

Examine the issue by referring to decided case law, if any.

June 2019Q. 1(a)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Facts of the case :

SB Pvt. Ltd. supplied raw materials worth ₹15 lakh in January 2018 to a company named MR Ltd. MR Ltd. issued two cheques for ₹10 lakh, dated l5th April, 2018 and ₹ 5 lakh, dated 1st June, 2018, in favour of SB Pvt. Ltd. MR Ltd. had availed loan facility of ₹50 lakh from State Bank of India (SBI) and due to non-payment the account became Non-performing Asset (NPA) in the books of SBI.

The SBI started recovery measures and lastly filed Corporate Insolvency Resolution Process (CIRP) against the MR Ltd. with the Adjudicating Authority (AA), The Adjudicating Authority admitted the CIRP filed by the SBI and the order of moratorium was passed under section 14 of the Insolvency and Bankruptcy Code, 2016 (the Code) on 6th June, 2018.

The first cheque of ₹10 lakh lodged by SB Pvt. Ltd. returned unpaid by its banker for the reason of insufficiency of funds. The SB Pvt. Ltd lodged a criminal complaint under section 138 of the Negotiable Instruments Act, 1881 (NI Act) against MR Ltd.

and its directors in the competent court having jurisdiction on 1st June, 2018. (i. e.

prior to declaration of moratorium by the AA).

The second cheque of ₹5 lakh was also returned unpaid for the reason of insufficiency of funds and again a second criminal complaint was lodged by the SB Pvt. Ltd.

against the MR Ltd. and its directors on l5th June, 2018 (i.e after declaration of moratorium by the AA).

The MR Ltd. and its Directors moved before the Adjudicating Authority and argued that during the period of moratorium proceeding petition under Section 138 of NI Act was not maintainable. This was opposed by the SB Pvt. Ltd. but the Adjudicating Authority directed the SB Pvt. Ltd. to withdraw the complaint case filed under Section 138 of NI Act treating it as a proceeding filed after order of moratorium with observation that such action amounts to deliberate attempt on the part of SB Pvt. Ltd. and sheer misuse of the process of law.

Aggrieved from the order of the Adjudicating Authority, the SB Pvt. Ltd. preferred appeal before the National Company Law Appellate Tribunal (NCLAT). The NCLAT accepted the appeal and set aside the order of the Adjudicating Authority.

Based on the above facts, answer the following questions :

(a)Citing relevant case law elaborate the decision of the Adjudicating Authority ?

State with reasons, if aggrieved party prefers an appeal, will they succeed.

June 2019Q. 1(c)10 marksSyllabus 2017Law changed
Law changed after this attempt: The answer reproduces S.14 as it stood in 2019 (sub-sections (1) to (4)). S.14(2A) on critical goods and services and later amendments to S.14(3) were added by subsequent amendments and are not noted in the answer. The answer below reflects the law as it stood for June 2019.
Show the facts common to all parts of Q. 1

Facts of the case :

SB Pvt. Ltd. supplied raw materials worth ₹15 lakh in January 2018 to a company named MR Ltd. MR Ltd. issued two cheques for ₹10 lakh, dated l5th April, 2018 and ₹ 5 lakh, dated 1st June, 2018, in favour of SB Pvt. Ltd. MR Ltd. had availed loan facility of ₹50 lakh from State Bank of India (SBI) and due to non-payment the account became Non-performing Asset (NPA) in the books of SBI.

The SBI started recovery measures and lastly filed Corporate Insolvency Resolution Process (CIRP) against the MR Ltd. with the Adjudicating Authority (AA), The Adjudicating Authority admitted the CIRP filed by the SBI and the order of moratorium was passed under section 14 of the Insolvency and Bankruptcy Code, 2016 (the Code) on 6th June, 2018.

The first cheque of ₹10 lakh lodged by SB Pvt. Ltd. returned unpaid by its banker for the reason of insufficiency of funds. The SB Pvt. Ltd lodged a criminal complaint under section 138 of the Negotiable Instruments Act, 1881 (NI Act) against MR Ltd.

and its directors in the competent court having jurisdiction on 1st June, 2018. (i. e.

prior to declaration of moratorium by the AA).

The second cheque of ₹5 lakh was also returned unpaid for the reason of insufficiency of funds and again a second criminal complaint was lodged by the SB Pvt. Ltd.

against the MR Ltd. and its directors on l5th June, 2018 (i.e after declaration of moratorium by the AA).

The MR Ltd. and its Directors moved before the Adjudicating Authority and argued that during the period of moratorium proceeding petition under Section 138 of NI Act was not maintainable. This was opposed by the SB Pvt. Ltd. but the Adjudicating Authority directed the SB Pvt. Ltd. to withdraw the complaint case filed under Section 138 of NI Act treating it as a proceeding filed after order of moratorium with observation that such action amounts to deliberate attempt on the part of SB Pvt. Ltd. and sheer misuse of the process of law.

Aggrieved from the order of the Adjudicating Authority, the SB Pvt. Ltd. preferred appeal before the National Company Law Appellate Tribunal (NCLAT). The NCLAT accepted the appeal and set aside the order of the Adjudicating Authority.

Based on the above facts, answer the following questions :

(c)What is effect of the declaration of the moratorium under section 14 of the Insolvency and Bankruptcy Code, 2016 ?

December 2022Q. 1(b)(ii)3 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

JCP Industries Ltd (JIL) was incorporated in the year 2011 with an authorized share capital of ₹2,000 crore having its registered office located in Mumbai with the main objects to carry out the business (a) manufacturing of heavy duty earth moving machinery and their spare parts (b) purchase, sale, construction of multi-story commercial and residential apartments under own name or as under Joint Development Agreements (c) Mining of minerals and thereafter refining and processing them for sale; and (d) doing the business in the hospitality sector by running and maintaining Hotels, Resorts and Budget Hotels. The paid-up share capital of the company as on date is ₹1,750 crore.

During the course of business, the company has approached various banks, state finance corporations and NBFCs for availing financial assistance in the nature of term loans and other facilities. However, based on the business plans and security offered, the finance proposal was approved by National Bank of India (the Bank) in the form of both fund based and non-fund based limits. The company during the course of its business operations was also availing credit for 90 days to 120 days from its creditors in connection with the purchase of raw material being used in the business of manufacturing heavy duty earth moving machineries, real estate, mining and hospitality sectors. The progress of the company since its incorporation till 31st March, 2019 was exceptional. However, because of certain transactions carried out by the directors with their relatives and other parties between 1st July, 2020 to 30th June, 2021 which were in the nature purchase of raw-material for different business segments of the company including the purchase of immovable properties as well as transferring and sale of goods and assets of the company to such related and other parties by givingthem preference over the other buyers ultimately resulted into mismatch in the cash flows and consequently resulted into losses to the company.

With an intention to grow organically, the company also incorporated a wholly owned subsidiary in the year 2017 under the name of JCP Buildcon Ltd (JAL) which was mainly engaged in the real estate business involving construction of apartments and flats in multi-story buildings under the Joint Development Agreements being entered into with the various parties including various State Governments under Housing Schemes. JAL entered into a tripartite Joint Development Agreement with Jaipur Development Authority (JDA) for construction of apartments and flats in multi-story buildings after development of land belonging to JDA. In an attempt to extend support to JIL, JAL had also mortgaged its assets in favour of banks in the month of August, 2018 when additional financial assistance was provided to JIL.

The financial condition of JIL started deteriorating after July, 2019 because of reduction in the business activities as well as default being committed in honoring the debt obligations towards banks, payment to trade creditors and delays in construction of apartments to be handed over to the buyers who had entered into agreements with the company and have paid almost 95% of the cost of the apartment.

The banks, trade creditors and buyers of the flats were constantly making follow up with the management but no reply was given to them by the management of JIL as well as JAL. National Bank of India during their internal review meeting informed their legal team that the promoter/directors may have siphoned off the money which was supposed to have been used for business purposes; since it appears to them that the amounts have been advanced to related parties and diverted towards a few suspicious transactions.

The bank despite the continuous follow up with the management and the Board of directors could not get any suitable response relating to the repayment plan to honor the debt obligations.

Considering the situation and based on the recommendation of their legal department, the bank decided to take action against the company under the Insolvency and Bankruptcy Code, 2016 (the Code) and thus filed an application on 16th February, 2022 before the Adjudicating Authority (AA) for initiating Corporate Insolvency Resolution Process (CIRP). In the application, the Bank had proposed name of Robin to act as Interim Resolution Professional (IRP). Simultaneously, other lenders of JAL also submitted an application before the AA to initiate CIRP against JAL for default in repayment of their dues.

After hearing the parties, the AA admitted the applications in the case of JIL and JAL on 25th April, 2022 and also confirmed the appointment of Robin as IRP in both the companies. In the case of JIL, Robin constituted a Committee of Creditors (CoC) on 15th May, 2022 and called first meeting of the CoC on 20th May, 2022. The constitution of CoC by Robin was challenged by the operational creditors as well as home buyers since their name was not included in the list of the CoC. Further, the members of the suspended Board of directors of JIL also challenged the actions of Robin who did not allow their participation in the first meeting of the CoC.

During the first meeting of the CoC in the case of JIL, Robin was confirmed to act as Resolution Professional (RP) by the CoC and was asked to invite the Expression of Interest (EoI) from the Resolution Applicants (RA) for submitting Resolution Plan.

Besides the above, JDA has also issued notice to JAL for taking over possession of the land given for the purpose of construction.

Considering the above facts answer the following questions :

(ii)State what will be the fate of the registration, licenses, grants and other benefits availed by JIL after the Insolvency Commencement Date.

June 2025Q. 1(a)(ii)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

(a)Read the following and answer the questions below based on the relevant case laws and the applicable provisions of the Insolvency and Bankruptcy Code, 20l6 (‘IBC, 2016’) and the Regulations made thereunder in this regard.

Facts of the case Thakur Engineering Products Private Limited [‘the company’] engaged in the business Industrial Machinery supplies. It got Machinery supplies worth ₹ 21,10,11,054/- from a supplier (‘Respondent’), which was due and payable by the company. Several cheques were issued by the company in favour of the respondent towards amounts payable for supplies, all of which were returned dishonoured for the reason “funds insufficient”.

As a result, the respondent issued a statutory demand notice under Section 138 read with Section 141 of the Negotiable Instruments Act, l88l (‘NI Act’), calling upon the company and its three Directors, to pay the amount within 15 days of the receipt of the notice.

Subsequently, two cheques for a total amount of ₹ 90,80,123/- presented by the respondent for encashment were returned dishonoured for the reason “funds insufficient”. A second demand notice was therefore issued under the same Sections by the respondent, calling upon the company and the appellants to pay this amount within l5 days of the receipt of the notice.

Since no payment was forthcoming pursuant to the two statutory demand notices, two criminal complaints, were filed by the respondent against the company and the appellants under Section 138 read with Section 141 of the Negotiable Instruments Act before the Additional Chief Metropolitan Magistrate [‘ACMM’]. Summons were issued by the ACMM to the company and the appellants in both the criminal complaints.

Meanwhile, as a statutory notice under Section 8 of the IBC, 20l6 had been issued by the respondent to the company, and an order was passed by the Adjudicating Authority admitting the application under Section 9 of the IBC and directing commencement of the corporate insolvency resolution process with respect to the company, a moratorium in terms of Section 14 of the IBC was ordered.

Pursuant thereto, the Adjudicating Authority stayed further proceedings in the two criminal complaints pending before the ACMM. In an appeal filed to the National Company Law Appellate, Tribunal (‘NCLAT’), the NCLAT set aside this order, holding that Section 138, being a criminal law provision, cannot be held to be a “proceeding” within the meaning of Section 14 of the IBC, 20l6. In an appeal filed before the Court, the Court ordered a stay of further proceedings in the two complaints pending before the learned ACMM.

Subsequent thereto, since a resolution plan submitted by the promoters of the company had been approved by the committee of creditors, the Adjudicating Authority approved such plan as a result of which, the moratorium order ceased to have effect. It may only be added that at present, an application for withdrawal of approval of this resolution plan has been filed by the financial creditors of the company before the Adjudicating Authority.

Equally, an application to extend time for implementation of this plan has been filed by the resolution applicant before the Adjudicating Authority. Both these applications have yet to be decided by the Adjudicating Authority.

On the above background, referring the provisions of IBC, 2016 and applicable case laws answer following questions :

(ii)Why did the Supreme Court classify proceedings under Section 138 of the NI Act as “criminal” for the purpose of the Section l4 moratorium ?

June 2025Q. 1(a)(v)4 marksSyllabus 2022
Show the facts common to all parts of Q. 1

(a)Read the following and answer the questions below based on the relevant case laws and the applicable provisions of the Insolvency and Bankruptcy Code, 20l6 (‘IBC, 2016’) and the Regulations made thereunder in this regard.

Facts of the case Thakur Engineering Products Private Limited [‘the company’] engaged in the business Industrial Machinery supplies. It got Machinery supplies worth ₹ 21,10,11,054/- from a supplier (‘Respondent’), which was due and payable by the company. Several cheques were issued by the company in favour of the respondent towards amounts payable for supplies, all of which were returned dishonoured for the reason “funds insufficient”.

As a result, the respondent issued a statutory demand notice under Section 138 read with Section 141 of the Negotiable Instruments Act, l88l (‘NI Act’), calling upon the company and its three Directors, to pay the amount within 15 days of the receipt of the notice.

Subsequently, two cheques for a total amount of ₹ 90,80,123/- presented by the respondent for encashment were returned dishonoured for the reason “funds insufficient”. A second demand notice was therefore issued under the same Sections by the respondent, calling upon the company and the appellants to pay this amount within l5 days of the receipt of the notice.

Since no payment was forthcoming pursuant to the two statutory demand notices, two criminal complaints, were filed by the respondent against the company and the appellants under Section 138 read with Section 141 of the Negotiable Instruments Act before the Additional Chief Metropolitan Magistrate [‘ACMM’]. Summons were issued by the ACMM to the company and the appellants in both the criminal complaints.

Meanwhile, as a statutory notice under Section 8 of the IBC, 20l6 had been issued by the respondent to the company, and an order was passed by the Adjudicating Authority admitting the application under Section 9 of the IBC and directing commencement of the corporate insolvency resolution process with respect to the company, a moratorium in terms of Section 14 of the IBC was ordered.

Pursuant thereto, the Adjudicating Authority stayed further proceedings in the two criminal complaints pending before the ACMM. In an appeal filed to the National Company Law Appellate, Tribunal (‘NCLAT’), the NCLAT set aside this order, holding that Section 138, being a criminal law provision, cannot be held to be a “proceeding” within the meaning of Section 14 of the IBC, 20l6. In an appeal filed before the Court, the Court ordered a stay of further proceedings in the two complaints pending before the learned ACMM.

Subsequent thereto, since a resolution plan submitted by the promoters of the company had been approved by the committee of creditors, the Adjudicating Authority approved such plan as a result of which, the moratorium order ceased to have effect. It may only be added that at present, an application for withdrawal of approval of this resolution plan has been filed by the financial creditors of the company before the Adjudicating Authority.

Equally, an application to extend time for implementation of this plan has been filed by the resolution applicant before the Adjudicating Authority. Both these applications have yet to be decided by the Adjudicating Authority.

On the above background, referring the provisions of IBC, 2016 and applicable case laws answer following questions :

(v)Whether arbitration proceedings are included under moratorium imposed under Section l4 ? Explain in detail with the relevant provisions of the IBC, 2016.

June 2019Q. 1(b)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Facts of the case :

SB Pvt. Ltd. supplied raw materials worth ₹15 lakh in January 2018 to a company named MR Ltd. MR Ltd. issued two cheques for ₹10 lakh, dated l5th April, 2018 and ₹ 5 lakh, dated 1st June, 2018, in favour of SB Pvt. Ltd. MR Ltd. had availed loan facility of ₹50 lakh from State Bank of India (SBI) and due to non-payment the account became Non-performing Asset (NPA) in the books of SBI.

The SBI started recovery measures and lastly filed Corporate Insolvency Resolution Process (CIRP) against the MR Ltd. with the Adjudicating Authority (AA), The Adjudicating Authority admitted the CIRP filed by the SBI and the order of moratorium was passed under section 14 of the Insolvency and Bankruptcy Code, 2016 (the Code) on 6th June, 2018.

The first cheque of ₹10 lakh lodged by SB Pvt. Ltd. returned unpaid by its banker for the reason of insufficiency of funds. The SB Pvt. Ltd lodged a criminal complaint under section 138 of the Negotiable Instruments Act, 1881 (NI Act) against MR Ltd.

and its directors in the competent court having jurisdiction on 1st June, 2018. (i. e.

prior to declaration of moratorium by the AA).

The second cheque of ₹5 lakh was also returned unpaid for the reason of insufficiency of funds and again a second criminal complaint was lodged by the SB Pvt. Ltd.

against the MR Ltd. and its directors on l5th June, 2018 (i.e after declaration of moratorium by the AA).

The MR Ltd. and its Directors moved before the Adjudicating Authority and argued that during the period of moratorium proceeding petition under Section 138 of NI Act was not maintainable. This was opposed by the SB Pvt. Ltd. but the Adjudicating Authority directed the SB Pvt. Ltd. to withdraw the complaint case filed under Section 138 of NI Act treating it as a proceeding filed after order of moratorium with observation that such action amounts to deliberate attempt on the part of SB Pvt. Ltd. and sheer misuse of the process of law.

Aggrieved from the order of the Adjudicating Authority, the SB Pvt. Ltd. preferred appeal before the National Company Law Appellate Tribunal (NCLAT). The NCLAT accepted the appeal and set aside the order of the Adjudicating Authority.

Based on the above facts, answer the following questions :

(b)Section 14 of the Code states that after declaration of the moratorium no legal action can be maintained against the Corporate Debtor. What will be your answer when :

(i)Criminal action under section 138 of Nl Act filed before the declaration of moratorium; and

(ii)Criminal action under section 138 of NI Act filed after the declaration of moratorium.

December 2025Q. 4(c)5 marksSyllabus 2022

(c)The City Development Authority (CDA / Lessor) entered into a lease deed with ABC Private Limited (the Corporate Debtor / Lessee) in respect of a piece of land for the purpose of constructing residential flats according to the setbacks and building plan approved by the lessor.

The lessee was to pay the lease premium of ₹ 24.29 Crore, out of which 10% i.e. ₹ 2.42 Crore was paid by the lessee to the lessor with a moratorium of 24 months from the date of allotment and after the expiry of moratorium period, the balance 90% premium i.e. ₹ 21.86 Crore of the plot along with interest was to be paid in the manner provided in the lease deed.

In the meantime, an application filed under Section 7 of the Code against the Corporate debtor was admitted on 10.10.2019. The CDA put up its claim of ₹ 32.96 Crore assessed on 10.10.2019 to the RP on 31.12.2019.

The RP invited for Expression of Interest (EOI) and Resolution Plans were submitted by few Resolution Applicants. Resolution Plan submitted by the consortium of home buyers’ association, namely, Crossroad Welfare Society was approved by the CoC and thereafter, the RP filed an application before the Adjudicating Authority seeking its approval. The said application is pending.

Meanwhile, CDA submitted a letter dated 04.06.2021 to the RP highlighting its dues towards lease premium calculated from 11.10.2019 to 30.06.2021 amounting to ₹ l6.15 Crore, which is payable within a period of 15 days. However, the said dues were not paid within the stipulated period, therefore, the CDA presumed that the RP has declined the same and filed the application before the Adjudicating Authority on 27.09.2021.

The Adjudicating Authority stated that in terms of explanation of Section 14(1) of the Code, the applicant is entitled to get lease premium amount as well as lease rent arising for the use or continuation of the lease during the moratorium period and in case of non-payment the moratorium benefit will not apply for the suspension or termination of lease. The Adjudicating Authority ordered that the Resolution Professional has failed to pay the lease premium and lease rent due to the CDA, therefore, the Resolution Professional is directed to make the payment of the lease amount within 6 months or else include the said amount as Insolvency Resolution Process Cost under Regulation 31 of the IBBI (Insolvency Resolution Process of Corporate Person).

On the above background, state whether the Adjudicating Authority has rightly applied the explanation under Section 14(1)(d) of the Code for the purpose of directing the Resolution Professional to pay the lease premium amount and the lease rent to the CDA ?

December 2022Q. 1(c)(i)7 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

JCP Industries Ltd (JIL) was incorporated in the year 2011 with an authorized share capital of ₹2,000 crore having its registered office located in Mumbai with the main objects to carry out the business (a) manufacturing of heavy duty earth moving machinery and their spare parts (b) purchase, sale, construction of multi-story commercial and residential apartments under own name or as under Joint Development Agreements (c) Mining of minerals and thereafter refining and processing them for sale; and (d) doing the business in the hospitality sector by running and maintaining Hotels, Resorts and Budget Hotels. The paid-up share capital of the company as on date is ₹1,750 crore.

During the course of business, the company has approached various banks, state finance corporations and NBFCs for availing financial assistance in the nature of term loans and other facilities. However, based on the business plans and security offered, the finance proposal was approved by National Bank of India (the Bank) in the form of both fund based and non-fund based limits. The company during the course of its business operations was also availing credit for 90 days to 120 days from its creditors in connection with the purchase of raw material being used in the business of manufacturing heavy duty earth moving machineries, real estate, mining and hospitality sectors. The progress of the company since its incorporation till 31st March, 2019 was exceptional. However, because of certain transactions carried out by the directors with their relatives and other parties between 1st July, 2020 to 30th June, 2021 which were in the nature purchase of raw-material for different business segments of the company including the purchase of immovable properties as well as transferring and sale of goods and assets of the company to such related and other parties by givingthem preference over the other buyers ultimately resulted into mismatch in the cash flows and consequently resulted into losses to the company.

With an intention to grow organically, the company also incorporated a wholly owned subsidiary in the year 2017 under the name of JCP Buildcon Ltd (JAL) which was mainly engaged in the real estate business involving construction of apartments and flats in multi-story buildings under the Joint Development Agreements being entered into with the various parties including various State Governments under Housing Schemes. JAL entered into a tripartite Joint Development Agreement with Jaipur Development Authority (JDA) for construction of apartments and flats in multi-story buildings after development of land belonging to JDA. In an attempt to extend support to JIL, JAL had also mortgaged its assets in favour of banks in the month of August, 2018 when additional financial assistance was provided to JIL.

The financial condition of JIL started deteriorating after July, 2019 because of reduction in the business activities as well as default being committed in honoring the debt obligations towards banks, payment to trade creditors and delays in construction of apartments to be handed over to the buyers who had entered into agreements with the company and have paid almost 95% of the cost of the apartment.

The banks, trade creditors and buyers of the flats were constantly making follow up with the management but no reply was given to them by the management of JIL as well as JAL. National Bank of India during their internal review meeting informed their legal team that the promoter/directors may have siphoned off the money which was supposed to have been used for business purposes; since it appears to them that the amounts have been advanced to related parties and diverted towards a few suspicious transactions.

The bank despite the continuous follow up with the management and the Board of directors could not get any suitable response relating to the repayment plan to honor the debt obligations.

Considering the situation and based on the recommendation of their legal department, the bank decided to take action against the company under the Insolvency and Bankruptcy Code, 2016 (the Code) and thus filed an application on 16th February, 2022 before the Adjudicating Authority (AA) for initiating Corporate Insolvency Resolution Process (CIRP). In the application, the Bank had proposed name of Robin to act as Interim Resolution Professional (IRP). Simultaneously, other lenders of JAL also submitted an application before the AA to initiate CIRP against JAL for default in repayment of their dues.

After hearing the parties, the AA admitted the applications in the case of JIL and JAL on 25th April, 2022 and also confirmed the appointment of Robin as IRP in both the companies. In the case of JIL, Robin constituted a Committee of Creditors (CoC) on 15th May, 2022 and called first meeting of the CoC on 20th May, 2022. The constitution of CoC by Robin was challenged by the operational creditors as well as home buyers since their name was not included in the list of the CoC. Further, the members of the suspended Board of directors of JIL also challenged the actions of Robin who did not allow their participation in the first meeting of the CoC.

During the first meeting of the CoC in the case of JIL, Robin was confirmed to act as Resolution Professional (RP) by the CoC and was asked to invite the Expression of Interest (EoI) from the Resolution Applicants (RA) for submitting Resolution Plan.

Besides the above, JDA has also issued notice to JAL for taking over possession of the land given for the purpose of construction.

Considering the above facts answer the following questions :

(c)(i) JAL had entered into tripartite Joint Development Agreement for development of land belonging to JDA. State whether moratorium will apply on such tripartite Joint Development Agreement and whether the owner of land being JDA after service of termination notice can repossess the land despite that the corporate debtor was having interest in it ?

December 2022Q. 2(c)2 marksSyllabus 2017
Show the facts common to all parts of Q. 2

Ruby and Emerald Pvt. Ltd (REPL), incorporated on 1st April, 2013 has its registered office in Surat. Gems and Gems Pvt. Ltd (GGPL), incorporated on 11th September, 2014 has its registered office in Jaipur. REPL was approached by GGPL for procuring its goods which can be used as raw material in the factory of REPL. It was agreed through a contract between REPL and GGPL that upon procurement of the goods entire payment shall be made by REPL within 10 days of issuance of the tax invoice.

The transaction was smoothly going between REPL and GGPL without any delays in supply of goods and payment. Owner of REPL died due to cardiac arrest and the business operations of REPL were severely affected. REPL started supplying faulty goods to its customers and the quality of raw material being supplied by the suppliers also deteriorated gradually. As on 2nd January, 2021, there were no dues outstanding towards GGPL and balance confirmation from GGPL was also taken by REPL.

However, between 3rd January, 2021 and 31st May, 2021 various transactions happened between REPL and GGPL. GGPL requested for the payments multiple times for such transaction between 3rd January, 2021 and 31st May, 2021; however, GGPL kept supplying goods in good faith based on relationship with REPL. REPL neither responded to requestsof GGPL nor stopped buying goods from them. Because of the long overdue from REPL, GGPL sent a demand notice on 16th June, 2021 through their lawyer to make the payment of entire outstanding to the tune of ‘ 1,25,00,000/- exclusive of interest @ 15% p.a. within 10 days from the receipt of the notice, failing which GGPL will take suitable actions under the law. No communication whatsoever was received from REPL. Therefore, as per the directions of the lawyer, GGPL filed an application to initiate Corporate Insolvency Resolution Process (CIRP)

against REPL. Also, they have sent a letter to the power company to disconnect the supply of electricity to REPL considering that they are not in a position to pay their dues Considering the above facts answer the following questions :

(c)Examine whether the power company can disconnect the electricity supply based on the letter received from GGPL, being an applicant who initiated CIRP ?

June 2019Q. 1(d)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Facts of the case :

SB Pvt. Ltd. supplied raw materials worth ₹15 lakh in January 2018 to a company named MR Ltd. MR Ltd. issued two cheques for ₹10 lakh, dated l5th April, 2018 and ₹ 5 lakh, dated 1st June, 2018, in favour of SB Pvt. Ltd. MR Ltd. had availed loan facility of ₹50 lakh from State Bank of India (SBI) and due to non-payment the account became Non-performing Asset (NPA) in the books of SBI.

The SBI started recovery measures and lastly filed Corporate Insolvency Resolution Process (CIRP) against the MR Ltd. with the Adjudicating Authority (AA), The Adjudicating Authority admitted the CIRP filed by the SBI and the order of moratorium was passed under section 14 of the Insolvency and Bankruptcy Code, 2016 (the Code) on 6th June, 2018.

The first cheque of ₹10 lakh lodged by SB Pvt. Ltd. returned unpaid by its banker for the reason of insufficiency of funds. The SB Pvt. Ltd lodged a criminal complaint under section 138 of the Negotiable Instruments Act, 1881 (NI Act) against MR Ltd.

and its directors in the competent court having jurisdiction on 1st June, 2018. (i. e.

prior to declaration of moratorium by the AA).

The second cheque of ₹5 lakh was also returned unpaid for the reason of insufficiency of funds and again a second criminal complaint was lodged by the SB Pvt. Ltd.

against the MR Ltd. and its directors on l5th June, 2018 (i.e after declaration of moratorium by the AA).

The MR Ltd. and its Directors moved before the Adjudicating Authority and argued that during the period of moratorium proceeding petition under Section 138 of NI Act was not maintainable. This was opposed by the SB Pvt. Ltd. but the Adjudicating Authority directed the SB Pvt. Ltd. to withdraw the complaint case filed under Section 138 of NI Act treating it as a proceeding filed after order of moratorium with observation that such action amounts to deliberate attempt on the part of SB Pvt. Ltd. and sheer misuse of the process of law.

Aggrieved from the order of the Adjudicating Authority, the SB Pvt. Ltd. preferred appeal before the National Company Law Appellate Tribunal (NCLAT). The NCLAT accepted the appeal and set aside the order of the Adjudicating Authority.

Based on the above facts, answer the following questions :

(d)Adjudicating Authority appoints Interim Resolution Professional (IRP) under the Insolvency and Bankruptcy Code - Enumerate his role, powers and duties.

December 2019Q. 1(d)8 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Facts of the case :

Richa Infrastructure Limited engaged in the construction of roads is in default in repayment of loans due to general slowdown in construction industry. Repeated follow-up by the financial institutions with the Corporate Debtor, ‘Richa Infrastructure Ltd.’ for submitting its specific plan for repayment of dues did not evoke any response.

One of the financial creditors filed a case against Richa Infrastructure Ltd. before the Debt Recovery Tribunal.

Richa Infrastructure Ltd. had issued some cheques to some Operational Creditors.

All the cheques issued to creditors were dishonored/returned by the banker due to insufficient funds in the account. Consequently, Operational Creditors issued legal notices to Richa Infrastructure Ltd, with clear intimation that if due amount is not paid within 15 days from the date of receipt of legal notice, criminal complaint shall be filed against Richa Infrastructure Ltd. under the Negotiable Instrument Act, 1881 and criminal complaints were filed. After a joint lenders meeting, all the financial institutions unanimously decided to apply under the provisions of the Insolvency and Bankruptcy Code, 2016 to the National Company Law Tribunal (NCLT) for starting the process of Insolvency Resolution. Their application was admitted by NCLT on 30th June, 2018 and orders were issued for commencement of a moratorium period of 180 days, appointment of an Interim Resolution Professional and issue of public announcement inviting claims from all concerned.

After public announcement and the responses thereto, following details were brought out :

(1)Financial debts due to unsecured creditors (F1) - ₹15 Crores.

(2)Workmen’s due for the period of 24 months preceding the liquidation commencement date (F2) - ₹25 Crores.

(3)Debts due to a secured creditor who has relinquished his security (F3) - ₹30 Crores.

(4)Amount due to the Central Government (F4) - ₹27 Crores.

(5)Debts due to a secured creditor after the enforcement of security interest (F5) -₹36 Crores.

Insolvency Resolution Professional (IRP) approached the promoters, directors and officials of Richa Infrastructure Ltd to provide the necessary information, documents, statutory records, books of accounts to verify the claims filed by creditors. The promoters, directors and officials of Richa Infrastructure Ltd. ignored the request of Resolution Professional.

M/s ANG & Associates, Chartered Accountants were the Statutory Auditors of Richa Infrastructure Ltd. They audited the accounts for the financial year end March, 2018 of Richa Infrastructure Ltd. and submitted the Annual Accounts for approval of the Board of Directors.

The Resolution Professional has appointed valuers and has received the valuation reports. The Resolution Professional then started the efforts to get resolution proposals.

However during the normal resolution process period of 180 days, no resolution proposal could be finalized. The Committee of Creditors decided that Resolution Professional should get the extension as per the provisions of Insolvency and Bankruptcy Code, 2016.

Based on the above facts, answer the following questions :

(d)Who will sign the Annual Financial Statements of the Corporate Debtor undergoing Corporate Insolvency Resolution Process ?

December 2024Q. 4(a)(ii)(d)2 marksSyllabus 2022
Show the facts common to all parts of Q. 4

(a)An agreement was entered into during August, 2006 between the ZY Infrastructures Private Limited (hereinafter referred to as ‘ZY Infra’) and WV Infrastructure Private Limited (hereinafter referred to as ‘the Corporate Debtor’), for development of land licensed with the ZY Infra admeasuring 8 acres into a residential group housing complex at Bengaluru. However, the ZY infra, being aggrieved by the Corporate Debtor’s alleged misconduct in advertising the project under its own name and without mentioning the name of the ZY Infra, sought reference to arbitration during May, 2011.

The arbitral proceedings culminated in an award dated 1st August, 2016 in favour of the ZY Infra. In addition to awarding a monetary claim, the award inter alia directed the Corporate Debtor to apply to the authorities for transfer of the requisite licenses to the ZY Infra.

Aggrieved by the award, the Corporate Debtor filed a petition under Section 34 of the Arbitration and Conciliation Act, 1996 (hereinafter referred to as the ‘Arbitration Act’) during September, 2016.

On the same date, the ZY Infra filed execution proceedings in respect of the said award.

These execution proceedings were ultimately adjourned sine die on 22nd December, 2017 on account of the pendency of the proceedings under Section 34 of the Arbitration Act.

These proceedings under Section 34 of the Arbitration Act culminated in the award being upheld by Special Commercial Court with some modifications.

Corporate Debtor who has filed an appeal against the same under Section 37 of the Arbitration Act is stated to be pending.

Meanwhile, the Corporate Insolvency Resolution Process (‘CIRP’) was initiated against the Corporate Debtor in respect of three real estate projects by certain homebuyers who had invested in these projects. This application under Section 7 of the Insolvency and Bankruptcy Code (hereinafter referred to as ‘the IBC’) was admitted on 27th March, 2019 by the Adjudicating Authority. On the same date, an Interim Resolution Professional (‘IRP’) was appointed. The IRP issued a public announcement inviting claims from creditors, in accordance with Section 15 of the IBC read with Regulation 6 of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 (hereinafter referred to as the ‘IBBI Regulations’) on 30th March, 2019.

After receipt of the claims, the IRP constituted the Committee of Creditors (‘COC’) on 6th November, 2019 and circulated the draft information memorandum and invited expressions of interest from prospective resolution applicants. Five such applications were received.

Thereafter, the IRP was replaced by Resolution Professional (RP) by the COC on 18th June,

2020. The resolution plan as submitted by TSK Residential Welfare Association was approved by the COC by a majority vote of 80.74% on 11th July, 2020. This plan was then submitted by RP to the Adjudicating Authority for approval under Section 31 of the IBC on 8th September, 2020.

ZY Infra sent an email on 19th August, 2020 to RP highlighting their pending claim of ₹ 35 Crores and odd against the Corporate Debtor arising from the arbitral award dated 1st August, 2016, confirmed with certain modifications in the proceedings under Section 34 of the said Act.

However, RP rejected this claim on 25th August, 2020 on the ground that the time period for submitting the claim was within 90 days of initiation of CIRP and the applicant was 287 days late. A Resolution plan had already been passed by the COC.

ZY Infra filed an application under Section 60(5) of the IBC. During the pendency of RP’s application for approval of the plan before the Adjudicating Authority, seeking directions to RP that the ZY Infra’s claim may be considered on merits.

This relief was granted to the ZY Infra by the Adjudicating Authority vide an order dated 3rd November, 2020 predicated on the following grounds :

(a)RP could not have summarily rejected ZY Infra’s claim, as this claim would have appeared in the Corporate Debtor’s books of accounts;

(b)In case such books of accounts were not available, RP had a duty to obtain them and verify the financial position; and

(c)as such announcement was made through public newspapers, it was likely that the appellant missed out on the same.

RP thereafter preferred an appeal under Section 61 of the IBC before the National Company Law Appellate Tribunal, New Delhi (‘NCLAT’) against the Adjudicating Authority’s order.

The NCLAT, vide the impugned order dated 30th July, 2021, did not favour the view adopted by the Adjudicating Authority. Their reasoning was as follows :

(i)RP had effectuated proper service for inviting claims in accordance with Regulation 6 of the IBBI Regulations which only mandates a pronouncement through newspapers and not through personal service—an aspect that was not disputed by the appellant;

(ii)The appellant failed to show that it filed its claim as soon as it came to know of the initiation of the CIRP.

(iii)RP even filed an application under Section 19 of the IBC before the Adjudicating Authority seeking that a direction be issued to the ex-management to provide all records. Although nothing came of this attempt, it reflected his sincere efforts;

(iv)Regulations 12 and 13 of the IBBI Regulations obliged the RP to accept claims filed within the extended period of 90 days of the commencement of CIRP.

(v)The resolution plan, as approved by the COC, would be jeopardised if new claims were entertained.

Consequent to the decision of the NCLAT, ZY Infra approached Supreme Court of India for the final resolution.

In the above background mentioning relevant case laws and applicable provisions of IBC and IBBI Regulations answer the following questions :

(ii)Considering the points raised by National Company Law Tribunal in this case, answer the following questions mentioning the relevant Sections of IBC/IBBI (CIRP) Regulations :

(a)In the event of claim received after the specified period, whether the same can be accepted, if yes, state the process for accepting claim after specified period.

(b)In case the Books are not provided by the Corporate Debtors, list out the persons/authorities with whom the IRP/RP may access the books or records as per the Regulations.

(c)State the modes or medium through which Public announcements have to be published by IRP/RP as per the Regulations.

(d)As per the duties specified under the IBC, what type of details/information can be collected by the IRP ?

June 2026Q. 1(b)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow:

(I)Background:

Phoenix Asset Management Ltd. (Phoenix) is an asset reconstruction company registered under the applicable laws of India. It acquired, by way of an assignment agreement, the outstanding receivables owed by Meridian Hospitality Ltd. (Meridian), a company engaged in the hotel and hospitality business from a consortium of four public sector banks. The assignment took place in January 2009.

Meridian had originally borrowed ₹ 180 crores from the consortium in March 2003 under a term loan agreement. The funds were used for the renovation and expansion of its flagship hotel property. Repayments were irregular from the outset, and by November 2008, the consortium banks collectively classified Meridian’s loan account as a Non-Performing Asset (NPA). Shortly thereafter, the consortium assigned all outstanding receivables to Phoenix.

The shareholding of Meridian was held equally by two promoter entities, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd. each holding a 50% stake. Mr. Rajiv Bhatia served as the Chairman and Managing Director of Meridian as well as of both promoter companies.

(II)Settlement attempts and acknowledgments:

In March 2010, well within three years of the NPA declaration, Meridian wrote to Phoenix proposing a one-time settlement of the outstanding dues. In this letter, Meridian acknowledged that the aggregate outstanding liability, inclusive of principal and interest, stood at ₹ 195 crore as on 31 December 2009. It offered an upfront payment of ₹ 15 crores and committed to clearing the balance in instalments over 18 months.

A formal Settlement Agreement was executed between the parties on 15 April 2010.

Under this agreement, Meridian acknowledged its total liability of ₹ 195 crores, agreed to pay interest at 20% per annum compounded monthly, made an upfront payment of ₹ 15 crores, and committed to clearing the balance by 30 September 2011. Between 2010 and 2013, Meridian made further part payments totalling approximately ₹ 48 crores through various demand drafts and cheques.

However, Meridian repeatedly sought extensions of time to pay the balance. In June 2012, it acknowledged an outstanding liability of ₹ 241 crore (principal and interest combined) and sought extension until March 2013. In September 2013, Phoenix revoked the Settlement Agreement after Meridian defaulted once again.

From the financial year 2009-10 onwards, Meridian’s audited annual financial statements consistently reflected the amounts owed to Phoenix as a liability. However, beginning from the financial statements for the year 2014-15, the notes to the accounts contained a qualification. While the principal amount owed to Phoenix was shown as a liability in the balance sheet, the notes stated that the Settlement Agreement had been revoked by Phoenix and that Meridian had been legally advised the applicable interest rate could not exceed 13% per annum, not the 20% claimed by Phoenix. The notes further stated that the question of the correct rate of interest was pending adjudication before the Debt Recovery Tribunal (DRT).

Phoenix issued a notice under the SARFAESI Act in October 2013 and took symbolic possession of the hotel property in February 2014. Phoenix also invoked the personal guarantee of Mr. Rajiv Bhatia in May 2015.

(III)The IBC, 2016 application and proceedings:

On 10 April 2018, Phoenix filed an application under Section 7(2) of the Insolvency and Bankruptcy Code, 2016 (IBC) before the National Company Law Tribunal (NCLT), seeking initiation of the Corporate Insolvency Resolution Process (CIRP) against Meridian. In its application, Phoenix claimed a principal amount of ₹42 crore and interest of ₹ 178 crores calculated at 20% per annum, bringing the total claim to approximately ₹ 220 crores.

Meridian filed a miscellaneous application before the NCLT seeking dismissal of the petition on the ground that it was barred by limitation. Meridian argued that the NPA was declared in November 2008, that the limitation period of three years expired in November 2011, and that the IBC application filed in April 2018 was hopelessly late by nearly seven years. Meridian further contended that the financial statements contained a clear dispute as to the rate of interest and could not, therefore, be read as an unequivocal acknowledgment of liability sufficient to extend limitation.

Phoenix countered that its application was well within time. It relied on the audited balance sheet of Meridian for the financial year 2014-15, signed by Meridian’s directors on 12 September 2015, which reflected Phoenix as a creditor and acknowledged Meridian’s outstanding financial liability. Phoenix argued that this acknowledgment, made before the original limitation period had expired, created a fresh three-year limitation period running from 12 September 2015 to 12 September 2018. Since the application was filed on 10 April 2018, it was within this extended period.

Phoenix also argued that regardless of the caveats in the notes to accounts concerning the interest rate, the balance sheet clearly showed the jural relationship of debtor and creditor between Meridian and Phoenix, and the existence of financial liability. A dispute about the rate of interest was a dispute about quantum, not about the existence of the debt itself. Moreover, even if the parts payments made by Meridian were to be considered, they would first be appropriated towards interest and then towards principal, meaning a substantial principal remained outstanding.

The promoter companies, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd., separately filed an appeal challenging the admission of the CIRP, arguing there was no subsisting financial debt and that the application was time-barred.

The NCLT rejected Meridian’s limitation objection and admitted the application, appointing an Interim Resolution Professional. The matter was then appealed to the NCLAT, which set aside the NCLT’s order, holding that the financial statements with caveated notes could not amount to an unequivocal acknowledgment under Section 18 of the Limitation Act and that the application was therefore barred by limitation.

Phoenix has now filed an appeal before the Supreme Court of India challenging the NCLAT’s order.

Required:

(b)Phoenix relies on Meridian’s audited balance sheet for 2014-15 as an acknowledgment of liability under Section 18 of the Limitation Act. According to Meridian, there is a variation of Rate of Interest charged by the bank. Can a balance sheet with a caveat about the rate of interest still qualify as an acknowledgment of debt? What does the law require?

December 2024Q. 4(b)(ii)4 marksSyllabus 2022
Show the facts common to all parts of Q. 4

(b)MPCL (hereinafter referred as ‘MPCL/Corporate Debtor’) imported goods from China for utilising in the construction of MPCL’s Power Plant. Unfortunately, CIRP was initiated on MPCL by the Adjudicating Authority and Resolution Professional (RP) was appointed. The Customs Bank Guarantees were issued by 5 Banks prior to the CIRP initiation of MPCL, with a condition that the said Bank Guarantee shall be kept alive until Unit Nos. 2 & 5 achieves confirmed Mega Power Plant (MPP) status.

Upon expiry of the Customs Bank Guarantees, the Banks requested for renewal of the same pending the grant of MPP status of Unit Nos. 2 & 5. However, the Resolution Professional is of the view that since there are no goods being imported by MPCL or its contractor for the operationalisation of the units of MPCL, there is no exemption which MPCL can claim for customs duty liability.

He further intimated the CoC that these renewals are not necessary for the ‘Going Concern’ nature of MPCL and the RP was not in favour renewal the Bank Guarantees.

The Banks filed an application before the Adjudicating Authority (AA) against the action of Resolution Professional. However, AA ruled in favour of the RP. Hence, the Banks preferred an appeal against the order of the Adjudicating Authority.

(ii)What are the endeavours and authorities of the Interim Resolution Professional to protect and preserve the value of the property of the Corporate Debtor and to manage the operations of Corporate Debtor as a going concern ?

December 2024Q. 4(b)(i)4 marksSyllabus 2022
Show the facts common to all parts of Q. 4

(b)MPCL (hereinafter referred as ‘MPCL/Corporate Debtor’) imported goods from China for utilising in the construction of MPCL’s Power Plant. Unfortunately, CIRP was initiated on MPCL by the Adjudicating Authority and Resolution Professional (RP) was appointed. The Customs Bank Guarantees were issued by 5 Banks prior to the CIRP initiation of MPCL, with a condition that the said Bank Guarantee shall be kept alive until Unit Nos. 2 & 5 achieves confirmed Mega Power Plant (MPP) status.

Upon expiry of the Customs Bank Guarantees, the Banks requested for renewal of the same pending the grant of MPP status of Unit Nos. 2 & 5. However, the Resolution Professional is of the view that since there are no goods being imported by MPCL or its contractor for the operationalisation of the units of MPCL, there is no exemption which MPCL can claim for customs duty liability.

He further intimated the CoC that these renewals are not necessary for the ‘Going Concern’ nature of MPCL and the RP was not in favour renewal the Bank Guarantees.

The Banks filed an application before the Adjudicating Authority (AA) against the action of Resolution Professional. However, AA ruled in favour of the RP. Hence, the Banks preferred an appeal against the order of the Adjudicating Authority.

(i)In the light of the inputs stated above, examine, stating the relevant case law and the provisions of the IBC, 2016 whether the appeal preferred by the Banks against the order of the Adjudicating Authority is tenable ?

December 2021Q. 1(a)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Images Gym Ltd. was granted credit facility of ₹100 lakh under consortium arrangements.

Under the consortium, there were 5 five banks, and credit facility provided by the respective banks were as under :

A-One Bank Ltd. - ₹45 lakh, Best Bank Ltd. - ₹20 lakh, Good Deal Bank Ltd. - ₹15 lakh, Credit Arrangers Bank Ltd. - ₹10 lakh and Your Bank Ltd - ₹10 lakh Among theses the A-One Bank Ltd. was the leader.

Images Gym Ltd. was engaged in the business of manufacturing and trading of Gym exercise machines. However, due to poor demand of the products, the company could not sell out the machines and as a result the account of the company with respective banks were classified as Non-performing Advances (NPAs).

Apart from credit facility from the above banks, the company was also having outstanding dues of the creditor, which the company was not able to pay-off. The total amount outstanding of such operational creditors amounted ₹30 lakh.

The company has also not paid the salary to its employees and workers for the last 6 months and the total dues amounted to ₹10 lakh.

The leader of the consortium filed Corporate Insolvency Resolution Process (CIRP)

with the Adjudicating Authority (AA) and proposed the name of Saket Sharma, as Interim Resolution Professional (IRP).

The AA accepted the application and appointed Saket Sharma as IRP and put moratorium.

The IRP constituted the Committee of Creditors (CoC) and first meeting of the CoC was called upon.

The operational creditors objected about the constitution of the committee and asked the IRP to include operational creditors also in the CoC, which the IRP denied.

The CoC observed that IRP is not discharging his functions properly and was reluctant in calling the expression of interest from Resolution Applicant(s), so they proposed for the change of the existing IRP and appointment of the new Resolution Professional (RP) named as Anubhav Dutt.

The RP called the expression of interest from the eligible applicants and each proposal was placed before the CoC, but no consensus had arrived at. The initial period of 180 days was going to elapsed so the CoC through the RP sought extension which the Adjudicating Authority for further 90 days. The RP again called the expression of interest from other Resolutionm Applicants, but it was also not agreed upon by the CoC and after lapse of total 270 days, the Adjudicating Authority ordered for its liquidation and the present RP was appointed as Liquidator.

The Liquidator sold off the assets of the Company and realised only ₹150 lakh, whereas the outstanding dues of the various stakeholders remained as under.

Dues of ₹ in Lakhs Fee payable as Resolution Professional 10 Fee payable as Liquidator 10 Dues of the banks with interest 110 Outstanding from Operational Creditors 30 Dues of Govts. 15 Workmen’s dues 10 Employee’s salary 15 Equity shareholders 30 Total 230 Based on the above information, answer the following questions:

(a)Mention the provisions relating to the constitution of the Committee of Creditors (CoC) under the Insolvency and Bankruptcy Code, 2016. In the instant case, the IRP did not included the Operational Creditors. Whether this action of the IRP was justified?

December 2025Q. 1(d)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow :

Arya is a Practicing Company Secretary and Insolvency Professional. She renders Corporate Advisory Services and very often delivers guest lectures in Financial Institutions, Banks and Management and Law Colleges on the topics of Corporate Insolvency, Restructuring and Fund Raising.

R. K. Institute of Management and Technology (RK-IMT) is a reputed management college in Jaipur.

RK-IMT was established in the year 2000 and this year the college in completing its glorious 25 years.

The RK-IMT planned for its Silver Jubilee and organized a whole week of celebrations. During this week the college organized various programs / activities viz: Sports Day, Debate Competition, Cultural Evening, Seminars, Workshop etc.

Arya was invited to address a seminar on the topic of Corporate Insolvency. Arya explained the objectives and purposes of the Insolvency and Bankruptcy Code, 2016 (IBC) and touched the key points relating to Financial Creditor, Operational Creditor, Corporate Debtor, Default, Initiation of Corporate Insolvency, Constitution of Committee of Creditors, and Insolvency Resolution Process Period etc. After delivering a thought-provoking lecture, Arya invited the audiences to raise queries on the topic.

Vedika, a student of the college, was curious to know more about Insolvency Law. She exclaimed to know that the IBC is a totally new concept and prior to this enactment whether there was any such law on insolvency existed in India. Arya clarified the position.

Reyansh, an Associate Professor of the college, was curious to know that whether IBC is an effective recovery tool and the lending institution can effectively exercise its control over the debtor through the Resolution Professional. Arya again clarified the doubts of Reyansh referring the objectives and purpose of IBC.

As a lecturer of the Institute, Rohil shared his own experience, he booked a 2-BHK Flat in Swarnim Galaxy, a building project of Swarnim Builders Limited (Swarnim Builders), and paid upto 90% of the purchase price to the builder, Swarnim Builders, on various stages. Ten per cent (10%) of the purchase price was to be paid at the time of taking the possession which was due in December,

2023. However, the possession of the flat was not given by the Builder to him. Rohil is not the only allottee but all the other allottees who had booked the flat in the Swarnim Galaxy were not given the possession and the Builder was taking excuses by narrating false reasons. Rohil narrated the whole story before the Arya and requested if she could help him. Arya asked Rohil to let her know the details of the project and relevant information to proceed in the case.

Rohil meets Arya at her office and submits her the details of the project available with him. Arya studies about the project and also checks the financial statements of Swarnim Builders, which are filed with Registrar of Companies. On scrutiny of financial statements, Arya found out that Rishabh Suppliers Limited (RSL), one of the major suppliers of Swarnim Builders had supplied the construction materials to Swarnim Builders amounting to ₹ 15 crore. On scrutiny of RSL’s financial statements, Arya has found out that RSL has assigned its book debts at a discount of 3% in favour of the Moon star Financiers Limited (MFL) a NBFC Company.

Based on the above factual background, answer the following questions :

(d)In the given case, if Corporate Insolvency Resolution Process (CIRP) is initiated against Swarnim Builders, who can be a member of the Committee of Creditors (CoC) ? Whether Moon Star Financiers Limited (MFL), in whose favour the RSL has assigned its book debts, can be treated as Financial Creditor ? Explain the relevant provisions of the IBC.

December 2022Q. 1(c)(ii)3 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

JCP Industries Ltd (JIL) was incorporated in the year 2011 with an authorized share capital of ₹2,000 crore having its registered office located in Mumbai with the main objects to carry out the business (a) manufacturing of heavy duty earth moving machinery and their spare parts (b) purchase, sale, construction of multi-story commercial and residential apartments under own name or as under Joint Development Agreements (c) Mining of minerals and thereafter refining and processing them for sale; and (d) doing the business in the hospitality sector by running and maintaining Hotels, Resorts and Budget Hotels. The paid-up share capital of the company as on date is ₹1,750 crore.

During the course of business, the company has approached various banks, state finance corporations and NBFCs for availing financial assistance in the nature of term loans and other facilities. However, based on the business plans and security offered, the finance proposal was approved by National Bank of India (the Bank) in the form of both fund based and non-fund based limits. The company during the course of its business operations was also availing credit for 90 days to 120 days from its creditors in connection with the purchase of raw material being used in the business of manufacturing heavy duty earth moving machineries, real estate, mining and hospitality sectors. The progress of the company since its incorporation till 31st March, 2019 was exceptional. However, because of certain transactions carried out by the directors with their relatives and other parties between 1st July, 2020 to 30th June, 2021 which were in the nature purchase of raw-material for different business segments of the company including the purchase of immovable properties as well as transferring and sale of goods and assets of the company to such related and other parties by givingthem preference over the other buyers ultimately resulted into mismatch in the cash flows and consequently resulted into losses to the company.

With an intention to grow organically, the company also incorporated a wholly owned subsidiary in the year 2017 under the name of JCP Buildcon Ltd (JAL) which was mainly engaged in the real estate business involving construction of apartments and flats in multi-story buildings under the Joint Development Agreements being entered into with the various parties including various State Governments under Housing Schemes. JAL entered into a tripartite Joint Development Agreement with Jaipur Development Authority (JDA) for construction of apartments and flats in multi-story buildings after development of land belonging to JDA. In an attempt to extend support to JIL, JAL had also mortgaged its assets in favour of banks in the month of August, 2018 when additional financial assistance was provided to JIL.

The financial condition of JIL started deteriorating after July, 2019 because of reduction in the business activities as well as default being committed in honoring the debt obligations towards banks, payment to trade creditors and delays in construction of apartments to be handed over to the buyers who had entered into agreements with the company and have paid almost 95% of the cost of the apartment.

The banks, trade creditors and buyers of the flats were constantly making follow up with the management but no reply was given to them by the management of JIL as well as JAL. National Bank of India during their internal review meeting informed their legal team that the promoter/directors may have siphoned off the money which was supposed to have been used for business purposes; since it appears to them that the amounts have been advanced to related parties and diverted towards a few suspicious transactions.

The bank despite the continuous follow up with the management and the Board of directors could not get any suitable response relating to the repayment plan to honor the debt obligations.

Considering the situation and based on the recommendation of their legal department, the bank decided to take action against the company under the Insolvency and Bankruptcy Code, 2016 (the Code) and thus filed an application on 16th February, 2022 before the Adjudicating Authority (AA) for initiating Corporate Insolvency Resolution Process (CIRP). In the application, the Bank had proposed name of Robin to act as Interim Resolution Professional (IRP). Simultaneously, other lenders of JAL also submitted an application before the AA to initiate CIRP against JAL for default in repayment of their dues.

After hearing the parties, the AA admitted the applications in the case of JIL and JAL on 25th April, 2022 and also confirmed the appointment of Robin as IRP in both the companies. In the case of JIL, Robin constituted a Committee of Creditors (CoC) on 15th May, 2022 and called first meeting of the CoC on 20th May, 2022. The constitution of CoC by Robin was challenged by the operational creditors as well as home buyers since their name was not included in the list of the CoC. Further, the members of the suspended Board of directors of JIL also challenged the actions of Robin who did not allow their participation in the first meeting of the CoC.

During the first meeting of the CoC in the case of JIL, Robin was confirmed to act as Resolution Professional (RP) by the CoC and was asked to invite the Expression of Interest (EoI) from the Resolution Applicants (RA) for submitting Resolution Plan.

Besides the above, JDA has also issued notice to JAL for taking over possession of the land given for the purpose of construction.

Considering the above facts answer the following questions :

(ii)Whether the operational creditors and the home buyers who have paid advances in the building project of JIL can raise objection for not including them in the list of CoC prepared by Robin for the purpose of voting on the agenda items ?

June 2022Q. 1(c)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

DK Swan Limited (DK) was subject to Corporate Insolvency Resolution Process (CIRP) initiated by an Operational Creditor under Section 9 of Insolvency Bankruptcy Code, 2016 (IBC). During the CIRP, claims were invited by the Interim Resolution Professional (IRP). Sunrise filed its claim in Form C as a financial creditor for a sum of ₹62.60 lakh on 15th June, 2017. Thereafter, Sunrise filed a revised Form C for a sum of ₹119.11 lakh on 25th June, 2017. Sunrise had filed the revised claim Form on the basis of an alleged Memorandum of Understanding dated 17th September, 2010 executed with the Corporate Debtor, which stated that Inter Corporate Deposits (ICDs) of ₹36.55 lakh have been granted to the Corporate Debtor by Sunrise bearing interest of 24% repayable in terms of the mutual agreement between the parties.

However, Sunrise has submitted that it has granted ICDs of ₹76.00 lakh (approx.) to the Corporate Debtor between July, 2008 and February, 2012. Out of this amount, Sunrise is claiming a principal amount of ₹33.00 lakh. The balance amount of ₹53.60 lakh was credited in the account of XYZ, which is a wholly owned subsidiary of Sunrise. The total claim of Sunrise has increased to ₹119.11 lakh in 7 years on account of interest at the rate of 24% XYZ filed its claim before the IRP in Form F as a creditor other than a financial creditor or operational creditor for a sum of ₹103.90 lakh on 15th June, 2017.

Thereafter, XYZ filed a revised claim in Form C as a financial creditor for a sum of ₹119.72 lakh on 28th June, 2017. It had entered into a Development Agreement dated 6th April, 2011 with the Corporate Debtor for a sale consideration of ₹42.80 lakh to purchase development rights in a project. On 30th November, 2011, the Development Agreement was terminated and an Agreement to sell, along with a Side Letter, was executed between XYZ and the Corporate Debtor for purchase of flats. The sale consideration for the Agreement to sell was enhanced to ₹96.01 lakh from ₹42.80 lakh under the Development Agreement. XYZ paid a sum of ₹53.06 lakh as advance payment under the Agreement to Sell. This amount was adjusted out of the ICDs payable to Sunrise as noted above. The claim of XYZ is with respect to the principal amount of ₹53.06 lakh, which along with interest at the rate of 18% increased to ₹119.72 lakh in 5 years.

Phantom is also a financial creditor of the Corporate Debtor and is a part of Committee of Creditors (CoC). Its claim is based on a registered Deed of Assignment in its favour dated 2nd January, 2015, pursuant to which, Karnataka Bank Limited had assigned the non-performing assets relating to the credit facilities granted to the Corporate Debtor. The voting share of Phantom was reduced to 3.58% on account of XYZ and Sunrise being included in the CoC.

The CoC was constituted on 27th June, 2017. On 30th June, 2017, the IRP rejected the claim of Sunrise, inter alia, on the ground that the claim was not in the nature of a financial debt in terms of Section 5(8) of IBC since there was an absence of consideration for the time value of money, i.e., the period of repayment of the claimed ICDs was not stipulated The IRP also rejected the claim of XYZ on the ground that its claim as a financial creditor in Form C was filed after the expiry of the period for filing such a claim.

The IRP in his letter dated 30th June, 2017 has noted that as per the ledger provided by Sunrise, no interest was claimed on the alleged debt and no adjustment was made regarding the payment of principal or interest by the Corporate Debtor to Sunrise. It has been submitted in the written submissions filed on behalf of Sunrise and XYZ that the auditors of the Corporate Debtor had been putting a note in its balance sheets stating that the interest of 12% was not being paid to Sunrise due to a dispute.

Aggrieved by the rejection of their claim as financial creditors, XYZ and Sunrise filed applications before the National Company Law Tribunal (NCLT) to be included in the CoC. The NCLT by its order dated 5th July, 2017 allowed the applications.

However, none of the other financial creditors, such as Phantom and YES Bank, were parties to these proceedings. The NCLT observed that XYZ’s original claim in Form F was filed on time and it has only amended its claim as one under Form C.

The NCLT further observed that the amount given by Sunrise in the form of ICDs has been received as a deposit and is attracting interest as reflected in Form ‘26AS’, deducting TDS on interest. Thus, NCLT allowed Sunrise and XYZ to submit their claims as financial creditors with a direction to the IRP to consider the claims.

On 6th July, 2017, a meeting of the CoC took place which was attended by YES Bank and Phantom, and also by the newly approved financial creditors, XYZ and Sunrise. Following the meeting, YES Bank and Phantom filed applications in the NCLT for the exclusion of XYZ and Sunrise from the CoC on the ground that they are related parties.

The applications filed under Section 60(5) by Phantom also sought similar reliefs for:

(i)The removal of Sunrise and XYZ from the CoC; and

(ii)Directing the constitution of the CoC in terms of the Insolvency and Bankruptcy (Amendment) Ordinance 2018 (IBC Ordinance 2018).

As noted by NCLT, the Memorandum of Understanding dated 17th September, 2010, on the basis of which Sunrise had filed its claim in Form C before the IRP, was signed two years after the commencement of the purported transaction. The execution of the Memorandum of Understanding was sought to be explained on the basis that a formal document was created for specifying the rate of interest on the ICDs given by Sunrise to the Corporate Debtor. However, despite the creation of a formal document, the rate of interest being charged on the ICDs was 12% as mentioned in the claim before the IRP, which is half of the interest rate of 24% stipulated in the Memorandum of Understanding.

NCLT in its judgement dated 24th August, 2018 said :

(a)That Sunrise and XYZ did not qualify to be considered as financial creditors.

(b)In relation to the second issue, NCLT held that it ‘‘does not require a reply’’ in view of its above-mentioned finding. However, it took note of the first proviso to Section 21(2) of the IBC, which was introduced with effect from 6th June, 2018.

Under the first proviso, inter alia, a financial creditor who is a related party of the corporate debtor shall not have the right of representation, participation or voting in the CoC.

In appeal, the National Company Law Appellate Tribunal (NCLAT) proceeded of its decision to observe that admittedly Sunrise and XYZ are the financial creditors of the corporate debtor. Having stated so, the Appellate Tribunal proceeded to enquire into whether XYZ and Sunrise are related parties within the meaning of Section 5(24) of the IBC. Answering the above issue in the affirmative, the NCLAT held that Sunrise and XYZ are related parties of the Corporate Debtor since :

(a)XYZ was a partner of the Corporate Debtor.

(b)During the transaction period of 2009 to 2012, Sunrise led by Kunal Kumar was making substantial financial arrangements on the basis of advice provided by the Corporate Debtor led by its Management and Directors.

(c)The Corporate Debtor was acting on the directions/instructions of Kunal Kumar who, along with his family, is the majority shareholder in Sunrise, of which XYZ is a whollyowned subsidiary.

(d)On the basis of the same reasons, Kunal Kumar was also held to be a person participating in the policy-making process of the Corporate Debtor.

Aggrieved by order of NCLAT, Phantom approached the Hon’ble Supreme Court.

Referring the relevant case and relevant provisions of IBC, its Rules and Regulations made thereunder, answer the following questions :

(c)Whether Sunrise and XYZ have to be excluded from the CoC ?

June 2022Q. 1(d)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

DK Swan Limited (DK) was subject to Corporate Insolvency Resolution Process (CIRP) initiated by an Operational Creditor under Section 9 of Insolvency Bankruptcy Code, 2016 (IBC). During the CIRP, claims were invited by the Interim Resolution Professional (IRP). Sunrise filed its claim in Form C as a financial creditor for a sum of ₹62.60 lakh on 15th June, 2017. Thereafter, Sunrise filed a revised Form C for a sum of ₹119.11 lakh on 25th June, 2017. Sunrise had filed the revised claim Form on the basis of an alleged Memorandum of Understanding dated 17th September, 2010 executed with the Corporate Debtor, which stated that Inter Corporate Deposits (ICDs) of ₹36.55 lakh have been granted to the Corporate Debtor by Sunrise bearing interest of 24% repayable in terms of the mutual agreement between the parties.

However, Sunrise has submitted that it has granted ICDs of ₹76.00 lakh (approx.) to the Corporate Debtor between July, 2008 and February, 2012. Out of this amount, Sunrise is claiming a principal amount of ₹33.00 lakh. The balance amount of ₹53.60 lakh was credited in the account of XYZ, which is a wholly owned subsidiary of Sunrise. The total claim of Sunrise has increased to ₹119.11 lakh in 7 years on account of interest at the rate of 24% XYZ filed its claim before the IRP in Form F as a creditor other than a financial creditor or operational creditor for a sum of ₹103.90 lakh on 15th June, 2017.

Thereafter, XYZ filed a revised claim in Form C as a financial creditor for a sum of ₹119.72 lakh on 28th June, 2017. It had entered into a Development Agreement dated 6th April, 2011 with the Corporate Debtor for a sale consideration of ₹42.80 lakh to purchase development rights in a project. On 30th November, 2011, the Development Agreement was terminated and an Agreement to sell, along with a Side Letter, was executed between XYZ and the Corporate Debtor for purchase of flats. The sale consideration for the Agreement to sell was enhanced to ₹96.01 lakh from ₹42.80 lakh under the Development Agreement. XYZ paid a sum of ₹53.06 lakh as advance payment under the Agreement to Sell. This amount was adjusted out of the ICDs payable to Sunrise as noted above. The claim of XYZ is with respect to the principal amount of ₹53.06 lakh, which along with interest at the rate of 18% increased to ₹119.72 lakh in 5 years.

Phantom is also a financial creditor of the Corporate Debtor and is a part of Committee of Creditors (CoC). Its claim is based on a registered Deed of Assignment in its favour dated 2nd January, 2015, pursuant to which, Karnataka Bank Limited had assigned the non-performing assets relating to the credit facilities granted to the Corporate Debtor. The voting share of Phantom was reduced to 3.58% on account of XYZ and Sunrise being included in the CoC.

The CoC was constituted on 27th June, 2017. On 30th June, 2017, the IRP rejected the claim of Sunrise, inter alia, on the ground that the claim was not in the nature of a financial debt in terms of Section 5(8) of IBC since there was an absence of consideration for the time value of money, i.e., the period of repayment of the claimed ICDs was not stipulated The IRP also rejected the claim of XYZ on the ground that its claim as a financial creditor in Form C was filed after the expiry of the period for filing such a claim.

The IRP in his letter dated 30th June, 2017 has noted that as per the ledger provided by Sunrise, no interest was claimed on the alleged debt and no adjustment was made regarding the payment of principal or interest by the Corporate Debtor to Sunrise. It has been submitted in the written submissions filed on behalf of Sunrise and XYZ that the auditors of the Corporate Debtor had been putting a note in its balance sheets stating that the interest of 12% was not being paid to Sunrise due to a dispute.

Aggrieved by the rejection of their claim as financial creditors, XYZ and Sunrise filed applications before the National Company Law Tribunal (NCLT) to be included in the CoC. The NCLT by its order dated 5th July, 2017 allowed the applications.

However, none of the other financial creditors, such as Phantom and YES Bank, were parties to these proceedings. The NCLT observed that XYZ’s original claim in Form F was filed on time and it has only amended its claim as one under Form C.

The NCLT further observed that the amount given by Sunrise in the form of ICDs has been received as a deposit and is attracting interest as reflected in Form ‘26AS’, deducting TDS on interest. Thus, NCLT allowed Sunrise and XYZ to submit their claims as financial creditors with a direction to the IRP to consider the claims.

On 6th July, 2017, a meeting of the CoC took place which was attended by YES Bank and Phantom, and also by the newly approved financial creditors, XYZ and Sunrise. Following the meeting, YES Bank and Phantom filed applications in the NCLT for the exclusion of XYZ and Sunrise from the CoC on the ground that they are related parties.

The applications filed under Section 60(5) by Phantom also sought similar reliefs for:

(i)The removal of Sunrise and XYZ from the CoC; and

(ii)Directing the constitution of the CoC in terms of the Insolvency and Bankruptcy (Amendment) Ordinance 2018 (IBC Ordinance 2018).

As noted by NCLT, the Memorandum of Understanding dated 17th September, 2010, on the basis of which Sunrise had filed its claim in Form C before the IRP, was signed two years after the commencement of the purported transaction. The execution of the Memorandum of Understanding was sought to be explained on the basis that a formal document was created for specifying the rate of interest on the ICDs given by Sunrise to the Corporate Debtor. However, despite the creation of a formal document, the rate of interest being charged on the ICDs was 12% as mentioned in the claim before the IRP, which is half of the interest rate of 24% stipulated in the Memorandum of Understanding.

NCLT in its judgement dated 24th August, 2018 said :

(a)That Sunrise and XYZ did not qualify to be considered as financial creditors.

(b)In relation to the second issue, NCLT held that it ‘‘does not require a reply’’ in view of its above-mentioned finding. However, it took note of the first proviso to Section 21(2) of the IBC, which was introduced with effect from 6th June, 2018.

Under the first proviso, inter alia, a financial creditor who is a related party of the corporate debtor shall not have the right of representation, participation or voting in the CoC.

In appeal, the National Company Law Appellate Tribunal (NCLAT) proceeded of its decision to observe that admittedly Sunrise and XYZ are the financial creditors of the corporate debtor. Having stated so, the Appellate Tribunal proceeded to enquire into whether XYZ and Sunrise are related parties within the meaning of Section 5(24) of the IBC. Answering the above issue in the affirmative, the NCLAT held that Sunrise and XYZ are related parties of the Corporate Debtor since :

(a)XYZ was a partner of the Corporate Debtor.

(b)During the transaction period of 2009 to 2012, Sunrise led by Kunal Kumar was making substantial financial arrangements on the basis of advice provided by the Corporate Debtor led by its Management and Directors.

(c)The Corporate Debtor was acting on the directions/instructions of Kunal Kumar who, along with his family, is the majority shareholder in Sunrise, of which XYZ is a whollyowned subsidiary.

(d)On the basis of the same reasons, Kunal Kumar was also held to be a person participating in the policy-making process of the Corporate Debtor.

Aggrieved by order of NCLAT, Phantom approached the Hon’ble Supreme Court.

Referring the relevant case and relevant provisions of IBC, its Rules and Regulations made thereunder, answer the following questions :

(d)Section 21(2) of the IBC provides that the Committee of Creditors (CoC) shall comprise of all financial creditors of the corporate debtor. In light of this statutory provision what will be your answer, if there are no financial creditors or all the financial creditors are related party to the Corporate Debtor ?

December 2021Q. 1(b)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Images Gym Ltd. was granted credit facility of ₹100 lakh under consortium arrangements.

Under the consortium, there were 5 five banks, and credit facility provided by the respective banks were as under :

A-One Bank Ltd. - ₹45 lakh, Best Bank Ltd. - ₹20 lakh, Good Deal Bank Ltd. - ₹15 lakh, Credit Arrangers Bank Ltd. - ₹10 lakh and Your Bank Ltd - ₹10 lakh Among theses the A-One Bank Ltd. was the leader.

Images Gym Ltd. was engaged in the business of manufacturing and trading of Gym exercise machines. However, due to poor demand of the products, the company could not sell out the machines and as a result the account of the company with respective banks were classified as Non-performing Advances (NPAs).

Apart from credit facility from the above banks, the company was also having outstanding dues of the creditor, which the company was not able to pay-off. The total amount outstanding of such operational creditors amounted ₹30 lakh.

The company has also not paid the salary to its employees and workers for the last 6 months and the total dues amounted to ₹10 lakh.

The leader of the consortium filed Corporate Insolvency Resolution Process (CIRP)

with the Adjudicating Authority (AA) and proposed the name of Saket Sharma, as Interim Resolution Professional (IRP).

The AA accepted the application and appointed Saket Sharma as IRP and put moratorium.

The IRP constituted the Committee of Creditors (CoC) and first meeting of the CoC was called upon.

The operational creditors objected about the constitution of the committee and asked the IRP to include operational creditors also in the CoC, which the IRP denied.

The CoC observed that IRP is not discharging his functions properly and was reluctant in calling the expression of interest from Resolution Applicant(s), so they proposed for the change of the existing IRP and appointment of the new Resolution Professional (RP) named as Anubhav Dutt.

The RP called the expression of interest from the eligible applicants and each proposal was placed before the CoC, but no consensus had arrived at. The initial period of 180 days was going to elapsed so the CoC through the RP sought extension which the Adjudicating Authority for further 90 days. The RP again called the expression of interest from other Resolutionm Applicants, but it was also not agreed upon by the CoC and after lapse of total 270 days, the Adjudicating Authority ordered for its liquidation and the present RP was appointed as Liquidator.

The Liquidator sold off the assets of the Company and realised only ₹150 lakh, whereas the outstanding dues of the various stakeholders remained as under.

Dues of ₹ in Lakhs Fee payable as Resolution Professional 10 Fee payable as Liquidator 10 Dues of the banks with interest 110 Outstanding from Operational Creditors 30 Dues of Govts. 15 Workmen’s dues 10 Employee’s salary 15 Equity shareholders 30 Total 230 Based on the above information, answer the following questions:

(b)Comment on the following:

(i)How the voting of share shall be determined in the meeting of the CoC, since in the given case the finance was made available under the consortium arrangement.

(ii)What would have been the position of constitution of the CoC, if some of the operational creditor had assigned their rights in favour of the financial creditor?

December 2019Q. 1(a)8 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Facts of the case :

Richa Infrastructure Limited engaged in the construction of roads is in default in repayment of loans due to general slowdown in construction industry. Repeated follow-up by the financial institutions with the Corporate Debtor, ‘Richa Infrastructure Ltd.’ for submitting its specific plan for repayment of dues did not evoke any response.

One of the financial creditors filed a case against Richa Infrastructure Ltd. before the Debt Recovery Tribunal.

Richa Infrastructure Ltd. had issued some cheques to some Operational Creditors.

All the cheques issued to creditors were dishonored/returned by the banker due to insufficient funds in the account. Consequently, Operational Creditors issued legal notices to Richa Infrastructure Ltd, with clear intimation that if due amount is not paid within 15 days from the date of receipt of legal notice, criminal complaint shall be filed against Richa Infrastructure Ltd. under the Negotiable Instrument Act, 1881 and criminal complaints were filed. After a joint lenders meeting, all the financial institutions unanimously decided to apply under the provisions of the Insolvency and Bankruptcy Code, 2016 to the National Company Law Tribunal (NCLT) for starting the process of Insolvency Resolution. Their application was admitted by NCLT on 30th June, 2018 and orders were issued for commencement of a moratorium period of 180 days, appointment of an Interim Resolution Professional and issue of public announcement inviting claims from all concerned.

After public announcement and the responses thereto, following details were brought out :

(1)Financial debts due to unsecured creditors (F1) - ₹15 Crores.

(2)Workmen’s due for the period of 24 months preceding the liquidation commencement date (F2) - ₹25 Crores.

(3)Debts due to a secured creditor who has relinquished his security (F3) - ₹30 Crores.

(4)Amount due to the Central Government (F4) - ₹27 Crores.

(5)Debts due to a secured creditor after the enforcement of security interest (F5) -₹36 Crores.

Insolvency Resolution Professional (IRP) approached the promoters, directors and officials of Richa Infrastructure Ltd to provide the necessary information, documents, statutory records, books of accounts to verify the claims filed by creditors. The promoters, directors and officials of Richa Infrastructure Ltd. ignored the request of Resolution Professional.

M/s ANG & Associates, Chartered Accountants were the Statutory Auditors of Richa Infrastructure Ltd. They audited the accounts for the financial year end March, 2018 of Richa Infrastructure Ltd. and submitted the Annual Accounts for approval of the Board of Directors.

The Resolution Professional has appointed valuers and has received the valuation reports. The Resolution Professional then started the efforts to get resolution proposals.

However during the normal resolution process period of 180 days, no resolution proposal could be finalized. The Committee of Creditors decided that Resolution Professional should get the extension as per the provisions of Insolvency and Bankruptcy Code, 2016.

Based on the above facts, answer the following questions :

(a)Can a Financial Creditor proceed against a Corporate Debtor under the Insolvency and Bankruptcy Code, 2016, when the matter is already pending before the Debt Recovery Tribunal ? Examine the issue with the help of decided case law/ laws.

June 2021Q. 1(b)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the following carefully and answer the questions given at the end :

Pine Food Industries Limited (“PFIL”) is one of the top FMCG player and listed entity in India. It is a leading manufacturer and marketer of various edible oils, food products and eatables. Its Authorized Capital is Rs. 252.00 crore and Paid-up Capital is Rs.

65.00 crore. PFIL has borrowed from various Banks and Financial institutions in India and its borrowings were around Rs. 12,000 Crore.

Due to unprecedented crash in global prices of the oil seeds coupled with falling revenues in the oil business gave a crippling blow to PFIL.

AB Bank and BC Bank filed an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (“Code”) for initiating the insolvency resolution process against PFIL (hereinafter called as the Corporate Debtor (“CD”)). After hearing both the parties, National Company Law Tribunal (“NCLT”) admitted the petition filed. The Financial Creditor proposed the name of Kapoor to act as Interim Resolution Professional (“IRP”).

An application was filed before NCLT by one of the creditors who made a claim before the Resolution Professional (“RP”) stating that the CD owed to pay USD 10.00 crore, based on the Bills of Exchanges, ordering the CD to pay this creditor for the goods supplied by another party. On making of such claim before the RP, it has been rejected by him saying that it is not a Financial Debt as it is an Operational Debt therefore, it could not be considered as Financial Debt as claimed by applicant therein.

Vijay Kumar Jain, suspended Director of the CD, filed an application before the NCLT under section 60(5) of the Code seeking an order for setting aside the decision taken by the Committee of Creditors (“CoC”) disallowing the erstwhile representatives of the Corporate Debtor including Vijay to participate in the CoC meetings; declare that the CoC meeting is non est; direct the RP to ensure active participation of the applicant in the meetings of CoC; provide all the documents and information to the applicant.

RP filed application in NCLT under section 43(1) of the Code for seeking reversal of the amounts that were debited from the current accounts of the CD maintained with XYZ Bank which had been debited by the XYZ Bank before the insolvency commencement date and were utilized against the payment of the dues owed by the CD to a Bank in relation to the Letter of Credit issued by them.

The RP submits that the payment of the impugned amount lead to preferential treatment towards XYZ Bank by the CD as such payment has the effect of putting Respondents (i.e. XYZ Bank) in a beneficial position than it would have been in liquidation of the CD in accordance with Section 53 of the Code. It is further stated by the RP that the payments of the impugned amount by the Corporate Debtor were not in the “ordinary course of business” of the CD.

NCLT, vide its order, held that the respondent Bank, which had debited an amount aggregating to Rs. 65.98 crores from the current accounts of the Corporate Debtor is directed to reverse the said amount within 30 days from the date of the said order.

Since the resolution plan is already submitted and under examination of the CoC without consideration of this amount, therefore the appropriation of this amount will be decided by the CoC. XYZ Bank filed appeal in NCLAT against the order of NCLT.

The main plea taken by the Appellant Bank is that the RP before filing an application under Section 43(1) of the Code formed no independent opinion nor afforded an opportunity to the Appellant to explain about the transactions in question.

The RP called for Expression of Interest (“EOI”). 28 prospective resolution applicants showed their interest out of which two prospective resolution applicants were rejected as one was disqualified under Section 29 A of the Code (being related party) and the other was a financial investor who did not meet the criteria in the EOI evaluation parameters.

The applicant reviewed the four Resolution Plans submitted by the Resolution Applicants and found that only the plans submitted by 2 Resolution Applicants (RA1 and RA2) provided for the corporate insolvency resolution of the Corporate Debtor as a whole and on a going concern basis.

The RP filed application under section 30(6) of the Code, seeking order for approval of the resolution plan for the Corporate Debtor submitted by the consortium led by PAL (RA2) as approved by the members of Committee of Creditors (CoC). The said resolution plan was approved by a vote share of 96.85%. RP filed application in NCLT for approval of Resolution Plan.

While the said application was pending for consideration before the NCLT, Hon’ble Supreme Court, in Vijay Kumar Jain Vs. Standard Chartered Bank & Ors pronounced the judgment. Under the Judgment of Hon’ble Supreme Court, the approval of the NCLT to the resolution plan of RA2 was interdicted. In compliance of the above-mentioned Hon'ble Supreme Court order, NCLT by its order directed as follows :

“Resolution Professional is directed to comply with the directions of the Hon’ble Supreme Court and submit the report within the stipulated time as provided by the Hon'ble Supreme Court.”

Thereafter, NCLT approved the Resolution Plan submitted by RA2 and passed orders and directions on the reliefs and concession sought.

Since in Para 38, NCLT in their order rejected some of the relief sought, RA2 moved to NCLT for modification of order of NCLT.

In the application filed, RA2 had sought substitution of Para 38 of the order of NCLT approving the Resolution Plan of RA2 as under :

Existing Para “38. Any relief sought for in the Resolution Plan, where the contract/agreement/ understanding/ proceedings/actions/notice etc is not specifically identified or is for future and contingent liability, is at this moment rejected.”

Proposed Para “All claims that were either not filed or not admitted during CIRP in terms of the provisions of the Insolvency and Bankruptcy Code, 2016 shall stand extinguished.

Further, claims admitted/ verified by the Resolution Professional shall stand settled and extinguished as per the Resolution Plan.”

Resolution Plan approved by NCLT of RA2 leads to a 60% haircut for the lenders.

RA2 completed its acquisition of PFIL.

Referring decided case and relevant provisions of the Insolvency and Bankruptcy Code (IBC), 2016 and Rules and Regulations made thereunder, answer the following questions :

(b)In the instant case explain whether Vijay Kumar Jain succeeded in his contention.

Referring Supreme Court’s decision, discuss the role and position of suspended Board of Directors in the Committee of Creditors.

June 2024Q. 2(c)(v)5 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(c)Panapathi G. Seeds Pvt. Ltd. a closely held private company was engaged in the business of processing oilseeds for edible oils. It was established in 1988 under the leadership of Panapathi G. Prasad. Within a decade, Panapathi G. Seeds Pvt. Ltd positioned itself as a leader in production of groundnut oil in the Western region of India with two premium brands.

In 2016 Panapathi G. Prasad had a severe heart attack and died without any succession plan in place. Ram and Sham, the two sons of Panapathi G. Prasad were also directors in the company with equal shareholding. After the death of Panapathi G. Prasad, both brothers had strained relations over the management control which adversely affected the business of the company. With declining profit and turnover both the brothers were worried and decided to reach a family settlement whereby the control of the company was handed over to the elder brother Ram. Sham resigned as the director of the company and in lieu of the same he was entrusted with the management and control of another family firm Saraswathi Edibles, wherein both brothers were partners. Praveen, son of Ram was inducted as director in the Company.

In 2018 Sham wanted to withdraw unsecured loan given by him to the company because the company stopped paying him interest on the loan. Despite follow up Sham was not paid either the principal or interest, which forced him to file an application under section 7 of the Insolvency and Bankruptcy Code 2016.

The Adjudicating Authority (i) admitted the application, (ii) declared moratorium and (iii)

appointed Nagarajan, as an Interim Resolution Professional (IRP). Ram refused to hand over the management control to the IRP on the plea that it was a family dispute, and they will settle soon on their own. He also asked the IRP not to make the public announcement.

IRP tried to persuade Ram citing the provisions of the Code and warned him that if he does not hand over control of the Corporate Debtor IRP will be forced to approach the Adjudicating Authority for appropriate orders. Thereafter Ram allowed the IRP to take inventory of the assets and stocks after 15 days from the insolvency commencement date.

With reference to the above facts and other details provided, answer the following questions with particular reference to the provisions contained in the Code, Regulations and rules of IBC and others :

(v)IRP sent the notice of the CoC meeting to Ram but not to Sham. Sham protested this and represented that Ram is also a related party and an unsecured financial creditor like him therefore, he is also entitled to receive notice of the CoC meeting. What is your opinion on the representation by Sham ?

December 2024Q. 1(d)4 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(d)Referring to suitable case law(s), discuss the scope of Judiciary in the matter of ‘Commercial Wisdom’ and state who has to exercise ‘Commercial Wisdom’ judiciously for the benefit of all the stakeholders.

December 2019Q. 1(e)8 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Facts of the case :

Richa Infrastructure Limited engaged in the construction of roads is in default in repayment of loans due to general slowdown in construction industry. Repeated follow-up by the financial institutions with the Corporate Debtor, ‘Richa Infrastructure Ltd.’ for submitting its specific plan for repayment of dues did not evoke any response.

One of the financial creditors filed a case against Richa Infrastructure Ltd. before the Debt Recovery Tribunal.

Richa Infrastructure Ltd. had issued some cheques to some Operational Creditors.

All the cheques issued to creditors were dishonored/returned by the banker due to insufficient funds in the account. Consequently, Operational Creditors issued legal notices to Richa Infrastructure Ltd, with clear intimation that if due amount is not paid within 15 days from the date of receipt of legal notice, criminal complaint shall be filed against Richa Infrastructure Ltd. under the Negotiable Instrument Act, 1881 and criminal complaints were filed. After a joint lenders meeting, all the financial institutions unanimously decided to apply under the provisions of the Insolvency and Bankruptcy Code, 2016 to the National Company Law Tribunal (NCLT) for starting the process of Insolvency Resolution. Their application was admitted by NCLT on 30th June, 2018 and orders were issued for commencement of a moratorium period of 180 days, appointment of an Interim Resolution Professional and issue of public announcement inviting claims from all concerned.

After public announcement and the responses thereto, following details were brought out :

(1)Financial debts due to unsecured creditors (F1) - ₹15 Crores.

(2)Workmen’s due for the period of 24 months preceding the liquidation commencement date (F2) - ₹25 Crores.

(3)Debts due to a secured creditor who has relinquished his security (F3) - ₹30 Crores.

(4)Amount due to the Central Government (F4) - ₹27 Crores.

(5)Debts due to a secured creditor after the enforcement of security interest (F5) -₹36 Crores.

Insolvency Resolution Professional (IRP) approached the promoters, directors and officials of Richa Infrastructure Ltd to provide the necessary information, documents, statutory records, books of accounts to verify the claims filed by creditors. The promoters, directors and officials of Richa Infrastructure Ltd. ignored the request of Resolution Professional.

M/s ANG & Associates, Chartered Accountants were the Statutory Auditors of Richa Infrastructure Ltd. They audited the accounts for the financial year end March, 2018 of Richa Infrastructure Ltd. and submitted the Annual Accounts for approval of the Board of Directors.

The Resolution Professional has appointed valuers and has received the valuation reports. The Resolution Professional then started the efforts to get resolution proposals.

However during the normal resolution process period of 180 days, no resolution proposal could be finalized. The Committee of Creditors decided that Resolution Professional should get the extension as per the provisions of Insolvency and Bankruptcy Code, 2016.

Based on the above facts, answer the following questions :

(e)Can IRP take action against employees of the Corporate Debtor in terms of employment agreement ?

December 2025Q. 2(a)(iv)4 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(a)Suruchi Fabrics Limited (SFL) availed term loan of ₹ 10 Crore and cash credit facility of ₹ 2 Crore from A-One Bank Ltd. Since the SFL was unable to service the loan, the Board of Directors of the company passed a resolution to initiate Corporate Insolvency Resolution Process (CIRP) and proposed the name of Aneri, an Insolvency Professional to act as Interim Resolution Professional (IRP). Apart from the credit facility from the A-One Bank, SFL have no other financial creditor. However, SFL have outstanding dues towards its operational creditors amounting to ₹ 25 Crore.

Mathew is the Company Secretary of A-One Bank. Mathew’s younger brother Thomas is the Chief Financial Officer in the SFL. Although Mathew and Thomas are brothers in relation, they are not in talking terms. Thomas joined the SFL after the loan was disbursed by the Bank.

In the first meeting of the Committee of Creditors (CoC) it was decided to change the existing IRP and to appoint Brijesh as Resolution Professional.

The Information Memorandum was prepared and expression of interest was invited for resolution plan.

Two Resolution Proposals were submitted, details of which are as under :

(i)A company named as Dinesh Textiles Private Limited, submitted the resolution plan.

Dinesh who is the Managing Director of the company holds 90% of the equity and rest 10% is in the name of his wife Neeta. Dinesh Textiles Private Limited has availed loan from another bank and his account has been classified as Non-performing Account by that bank.

(ii)Harsh, another Resolution Applicant was convicted and remained in imprisonment for two years under the provisions of the Prevention of Money Laundering Act, 2002. He was released in December 2021.

On the above background, referring relevant case laws, provisions of the Insolvency and Bankruptcy Code, 2016 and Regulations made by IBBI, answer the following questions :

(iv)In the given case, two resolution plans were received by the CoC. One from Dinesh Textiles Private Limited and another one from Harsh. Examine the validity of both the resolution plans.

June 2019Q. 2(b)6 marksSyllabus 2017

(b)ESI Ltd. filed Corporate Insolvency Resolution Plan (CIRP) with the Adjudicating Authority, which was accepted, and Expression of Interest (EOI) was invited.

One N Ltd. filed EOI. It was noticed that N Ltd was incorporated just 7 days before submission of the EOI as joint venture between AE Ltd and other two companies. It was further come to the notice that AE Ltd. was completely held by Sawant Seth (through various companies and a trust), said Sawant Seth was son of Ravi Seth, who was promoter of ESI Ltd.

You as a Resolution Professional in this case, what would you suggest the Committee of Creditors and Adjudicating Authority about the acceptance or rejection of the EOI. Give reasons and quote the decided case law.

December 2024Q. 1(iii)6 marksSyllabus 2017
Show the facts common to all parts of Q. 1

COB Bank filed an application under Section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC) for initiating a Corporate Insolvency Resolution Process (CIRP) against the Corporate Debtor, M/s. Gupta Infra Private Limited (GIPL). The said application was admitted by the Adjudicating Authority (AA) during October, 2018 and a Resolution Professional (RP) was appointed as an Interim Resolution Professional (IRP).

Following is the financial position of GIPL as on the date of commencement of the CIRP :

Liabilities Amount in Assets Amount in ₹

₹ Crores Crores

Share Capital – Equity 100.00 Fixed Assets – Land and 115.00

Building

Share Capital – Redeemable 75.00 Fixed Assets – Plant and 165.00 Preference Shares Machinery Share Capital – Convertible 25.00 Other Fixed Assets 70.00 Preference Shares Debentures (Unsecured fully 50.00 Investments in Subsidiaries 50.00 convertible)

Long Term Borrowings – Fully 300.00 Inventories 150.00 Secured Short Term Borrowings – Unsecured 75.00 Receivables 110.00 Loan from Related Parties 25.00 Cash and Bank Balances 15.00 Payables 65.00 Other Current Assets 25.00 Provisions 35.00 Accumulated Losses 100.00 Deferred Tax Liabilities 15.00 Other Current Liabilities 35.00 Total Liabilities 800.00 Total Assets 800.00 Other Additional information provided by the Corporate Debtor :

[Amounts stated in the table above can be treated as claims made by each of the parties in their respective category].

Other Current Liabilities include :

₹ In Crores

Workmen Wages Payable for 36 months 9.00 Salary Payable for 20 months 100.00 PF Liabilities 3.80 Sales Tax/Commercial Taxes Due * 4.80 Other Statutory Dues 2.40

* On the sales tax and commercial taxes due, the Commercial Tax Authorities have already attached one of the immovable properties of the Corporate Debtor valued at ₹ 3.50 crores.

Fixed Assets includes buildings occupied on long term lease for a period of 75 years obtained from the State Industrial Development Authority (SIDA) for ₹ 5 Crores. SIDA has also submitted their claim with the RP stating that their premium amount along with interest and penal interest is due for since last 7 years. SIDA has filed its claim as a Financial Creditor. Whereas, the Resolution Professional has requested SIDA to submit its claim as an Operational Creditor. (This amount is included in Other Current Liabilities).

Further, it was informed by the Resolution Professional that the Corporate Debtor, M/s. Gupta Infra Private Limited, who initiated a CIRP against one of its Operational Creditor, namely C-Digital Arts Private Ltd for ₹ 6 Crores and going forward, the National Company Law Tribunal (NCLT) has already ordered for initiation of Corporate Insolvency Resolution Process (CIRP). However, one of the suspended Director on the Board of C-Digital Arts Private Limited filed an appeal before the National Company Law Appellate Tribunal (NCLAT) stating that there was no notice given as required under Section 8 of the Insolvency and Bankruptcy Code, 2016 read with Rule 5 of the insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016 which entails that for initiation of insolvency resolution process by an Operational Creditor, a demand notice has to be served by the unpaid Operational Debtor on the Corporate Creditor. Nevertheless, the aforesaid suspended director he has not denied the debts due. This matter is pending before NCLAT for disposal.

Investments includes investment in Foreign Subsidiary of ₹ 30 Crores and in an Indian Subsidiary of ₹ 18 Crores and Investment in shares amounting to ₹ 2 Crores in another company incorporated and registered with charitable objects and not for profit.

Inventories and Receivables realisable only for 80% of its value.

Loan from related parties is from wife and son of one Director of GIPL.

Other Current Assets includes ₹ 10 Crores paid to National Highway Authority of India (NHAI) towards a bid amount for a road project.

Other Current Assets includes ₹ 2 Crores of assets of third party held under Trust. Machinery, the carrying value of which is ₹ 1.50 crores belonging to an Indian Subsidiary is lying in one of the Units of the Corporate Debtor.

A Machinery which was acquired for dispatching to the Foreign Subsidiary is also lying in the factory premises of the Corporate Debtor having a carrying value of ₹ 3 crores.

Cranes worth ₹ 5 Crores belonging to a proprietorship concern of one of the Director is also lying the Factory premises of the Corporate Debtor.

CIRP costs payable including all expenses is ₹ 2 Crores.

The Security Interest charged for COB Bank is 91.25% and SID Bank is 8.75%. (both the financial creditors have not relinquished their security interest).

During the CIRP, in one of the Meeting of the ‘Committee of Creditors’ (CoC), Resolution Plans were discussed. Revised Resolution Plans were submitted by the prospective Resolution Applicants.

Resolution Plan was put to e-Vote and by majority of 94.79%, the Resolution Plan of ‘GIPL’ was approved.

The Resolution plan proposes for utilisation of all assets including the assets under lease. Further, the Resolution Professional has sent a letter to the Commercial Taxes Authorities to release the property attached by them and on the contrary, the Authorities informed that the Department will get their portion as per the proposed Resolution Plan.

One of the Financial Creditor (SID Bank) sent an objection with respect to the distribution of the proceeds of the resolution plan under the Resolution Plan.

SID Bank also filed seeking direction to the Resolution Professional to distribute the proceeds of the Resolution Plan and made the following prayers :

“It is most respectfully prayed that :

1.The present application may kindly be allowed and the directions be issued to the Respondent No. 1 to modify/clarify the distribution to dissenting members as per the Resolution Plan and distribute the proceeds of the resolution plan to the Applicant SID Bank, for an amount of ₹ 8.97 Crores in priority in accordance with provisions of IBC, 2016 in the interest of justice and equity.

2.Interim stay be granted on distribution of the resolution plan amount by the Resolution Professional to the Committee of Creditors till the present application is decided.”

The case of the Appellant, namely SID Bank in the Application was that, as per the security interest of the Appellant, the Appellant is entitled to 8.75% i.e. the amount of ₹ 8.97 Crores and as per voting share as approved by the CoC, the Appellant is entitled to 5.21% i.e., ₹ 5.34 Crores. The case of the Appellant SID Bank set up in the Application is that he is entitled for his distribution of plan amount as per value of the security interest of the Appellant.

The Application was objected by the Resolution Professional. The Adjudicating Authority, by its Order, upheld the decision of the CoC for distribution of proceeds of the Resolution Plan as per the voting share. The Appellant, aggrieved by the said Order, has come up with the Appeal to the National Company Law Appellate Tribunal (NCLAT).

In the light of the above case study inputs and referring to the decisions of applicable case laws with reasons and the provisions of Insolvency and Bankruptcy Code, 2016 (IBC, 2016) and the Regulations made thereunder, answer the following questions :

(iii)Explain whether the claim of the Resolution Professional to require the State Industrial Development Authority (SIDA) to revise its claim as an Operational Creditor is correct ?

Support your answer in the light of the decided case laws in this regard.

December 2024Q. 2(a)9 marksSyllabus 2022

(a)One of your clients approaches you as a Company Secretary in Practice seeking your advice on initiation of Corporate Insolvency Resolution Process under the provisions of Insolvency and Bankruptcy Code, 2016 (‘IBC’, 2016) on the following persons and to state under which provisions, the initiation can be done :

(i)A Foreign Company (incorporated outside India) and having a place of business in India.

(ii)A Partnership Firm registered under Indian Partnership Act, 1932. (iii) A wholly owned Foreign Subsidiary of an Indian Holding Company.

(iv)A Proprietorship concern which is a guarantor to a Limited Liability Partnership. (v) The National Highway Authority of India.

(vi)A Public Registered Trust which owns majority stake in an unlisted Public Company.

(vii)A Society Registered under the Societies Registration Act.

(viii)A NBFC registered with the Reserve Bank of India.

(ix)A Nidhi Company registered under the Companies Act, 2013.

June 2026Q. 4(d)6 marksSyllabus 2022

(d)‘‘A resolution application may submit a resolution plan along with an affidavit stating that he is eligible under section 29A to the resolution professional prepared on the basis of the information memorandum. The resolution professional shall examine each resolution plan received by him to confirm that each resolution plan.’’ Explain the important requirements of the ‘Resolution Plan’ that are submitted by the Prospective Resolution Applicants.

June 2021Q. 6(a)6 marksSyllabus 2017
Show the facts common to all parts of Q. 6

A Resolution Professional appointed under Insolvency & Bankruptcy Code, 2016 (IBC, 2016), placed before the Committee of Creditors (CoC), a Consortium of Banks, a Resolution Plan submitted to him. The CoC approved the Resolution Plan and National Company Law Tribunal (NCLT), sanctioned it. As the Liquidation Value is not sufficient and there is a hair-cut involved in the dues payable to the secured financial creditors, nothing is provided for the Operational Creditors under the Resolution Plan. The Operational Creditor aggrieved by the decision of the NCLT filed Appeal before National Company Law Appellate Tribunal (NCLAT). The contention of the Operational Creditor is that the Resolution Plan approved is not in compliance with the provisions of the Insolvency and Bankruptcy Code, 2016 and the Regulations made thereunder :

(a)Referring suitable case law answer whether the contention of Operational Creditor is Correct.

December 2020Q. 2(b)6 marksSyllabus 2017

(b)You are appointed as Resolution Professional by Committee of Creditors. You have made a public announcement inviting Expression of Interest. Based on your invitation few Parties have submitted Resolution plans. As per the provisions of Insolvency and Bankruptcy Code, 2016 (IBC, 2016) Resolution Plans submitted should satisfy few criteria. As a Resolution Professional brief the criteria for a valid Resolution Plan under IBC, 2016.

December 2024Q. 1(b)(iii)1 markSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(iii)What would be the total claim that would be paid to the Operational Creditors and the Statutory Authorities ?

June 2024Q. 5(A)6 marksSyllabus 2017

(a)Mr. V. Ramaswamy is former Director of Corporate Debtor namely M/s Narmada Project Limited an application field with Resolution Professional (RP) to provide ‘Resolution Plan’. But RP denied to provide ‘Resolution Plan’ to Erstwhile Director of Mr. V. Ramaswamy and RP has contended that only the Members of CoC who is having Voting Rights are entitled to have Resolution Plans, as per CIRP Regulations. Whether the Resolution Professional Contention is Correct ? Explain with decided case in this regard.

December 2024Q. 1(e)2 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(e)The Resolution Plan was approved by 88% votes. What is the minimum percentage of vote required for approval of Resolution Plan and who are all eligible to vote for the Resolution Plan ?

June 2021Q. 5(b)6 marksSyllabus 2017

(b)National Company Law Tribunal (NCLT) has initiated CIRP on application of one of Operational Creditors of DOP Ltd. A Resolution Professional was appointed after all processes as per the Law. Two viable Resolutions Plans (Plan A and Plan B) were received. Committee of Creditors comprises of Three Financial Creditors. As per Regulations of Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016, what is the approval status of Resolution Plans (Plan A and Plan B) for various instances of Voting outcome as mentioned below ?

Voting Outcome % of votes in favour of % of votes against in different scenarios Plan A Plan B Plan A Plan B 1 52 64 48 36 2 64 78 36 22 3 78 78 22 22 Also clarify the requisite voting percentage and tie-breaker formula as per the aforesaid Regulations.

June 2025Q. 1(b)(i)3 marksSyllabus 2022

(b)Answer the following questions :

(i)Can a Resolution Professional withdraw or modify a successful Resolution Plan submitted with the Adjudication Authority ? Answer with suitable provisions of the IBBI Regulations and applicable case law.

June 2022Q. 5(b)6 marksSyllabus 2017

(b)A Ltd. and the B Ltd. had jointly submitted the Resolution Plan for taking over the Company. The same was approved unanimously by the Committee of Creditors (CoC), and after that, the Resolution Plan was further approved by the Adjudicating Authority (AA).

The approved Resolution Plan got executed, and the shares were allotted as per the terms of the approved Plan. All money in respect of 34% shares were paid by the A Ltd. and B Ltd. got 51% paid-up equity shares.

Later, after 13 months of completion of Corporate Insolvency Resolution Plan (CIRP), the AA, on an application of B Ltd. made changes in Plan, thus increasing its shareholding to 75% and reducing the shareholding of A Ltd. to 10%. This was done as typographical/ clerical error brought to notice of AA.

Discuss, based on case laws, whether A Ltd. will succeed in Appeal ?

December 2025Q. 4(b)5 marksSyllabus 2022

(b)DSP Private Limited (the Corporate Debtor) underwent a corporate insolvency resolution process (CIRP) in 09.12.2021 initiated by a financial creditor. A Resolution Plan was put forth by MM Limited, a Resolution Applicant which was approved by the Adjudicating Authority.

Prior to the commencement of the CIRP, on 20.10.2017 various First Information Reports (FIR)

alleging offenses including cheating and criminal breach of trust were filed against the Corporate Debtor and its former promoters.

These offenses fell under the “schduled offenses” as per Prevention of Money Laundering Act, 2002 (PMLA). Consequently, an Enforcement Case Information Report (ECIR) was filed by the Enforcement Directorate (ED) on 08.03.2018. The ECIR estimated the “proceeds of crime” to be approximately ₹ 9000 Crore. As a result of the ECIR, the ED filed an “original complaint,” leading to attachment proceedings against the assets of the Corporate Debtor.

This included four bank accounts and 14 flats constructed by the Corporate Debtor valued at ₹ 35 Crore referred to as the “Attached Properties”.

The attachment was initially provisional under Section 5 of the PMLA on 14.02.2019 and later confirmed by an order dated 05.08.2019 passed by the Adjudicating Authority. The attachment persisted even after the initiation of the CIRP and continued after the approval of the Resolution Plan.

MM Limited, the Resolution Applicant had filed Writ Petition in the High Court against the Adjudicating Authority under the PMLA, 2002 and the Deputy Director, Enforcement Directorate to quash the ECIR, the orders attaching the Attached Properties and the “original complaint”, based on which the attachment was effected as they relate to the Corporate Debtor and its assets and to release the Attached Properties.

On the above background, referring to the High Court’s decision state whether the NCLT has the jurisdiction to direct the Enforcement Directorate to release the attached properties once the Resolution Plan in respect of said Corporate Debtor is approved ?

December 2025Q. 3(d)5 marksSyllabus 2022

(d)Pluto Infrastructures Limited filed an application for initiation of CIRP under Section 10 of the Code. The NCLT admitted the application and moratorium was imposed. Padam, an Insolvency Professional was appointed as Interim Resolution Professional (IRP) who was confirmed to continue as Resolution Professional in the first meeting of the Committee of Creditors (CoC). The Resolution Plan submitted by one of the Resolution Applicant was placed before the CoC and thereafter before the NCLT for its final approval. The NCLT observed that the Resolution Plan do not meet all the requirements as per the provisions of the Code and removed Padam and appointed another Resolution Professional. Aggrieved from the order to the NCLT, Padam preferred an appeal before the NCLAT taking the plea that NCLT have no powers to remove Resolution Professional since it vests only with the CoC.

Whether NCLT is empowered to remove a Resolution Professional ? Substantiate your answer with the decided case law.

December 2022Q. 2(a)6 marksSyllabus 2017
Show the facts common to all parts of Q. 2

Ruby and Emerald Pvt. Ltd (REPL), incorporated on 1st April, 2013 has its registered office in Surat. Gems and Gems Pvt. Ltd (GGPL), incorporated on 11th September, 2014 has its registered office in Jaipur. REPL was approached by GGPL for procuring its goods which can be used as raw material in the factory of REPL. It was agreed through a contract between REPL and GGPL that upon procurement of the goods entire payment shall be made by REPL within 10 days of issuance of the tax invoice.

The transaction was smoothly going between REPL and GGPL without any delays in supply of goods and payment. Owner of REPL died due to cardiac arrest and the business operations of REPL were severely affected. REPL started supplying faulty goods to its customers and the quality of raw material being supplied by the suppliers also deteriorated gradually. As on 2nd January, 2021, there were no dues outstanding towards GGPL and balance confirmation from GGPL was also taken by REPL.

However, between 3rd January, 2021 and 31st May, 2021 various transactions happened between REPL and GGPL. GGPL requested for the payments multiple times for such transaction between 3rd January, 2021 and 31st May, 2021; however, GGPL kept supplying goods in good faith based on relationship with REPL. REPL neither responded to requestsof GGPL nor stopped buying goods from them. Because of the long overdue from REPL, GGPL sent a demand notice on 16th June, 2021 through their lawyer to make the payment of entire outstanding to the tune of ‘ 1,25,00,000/- exclusive of interest @ 15% p.a. within 10 days from the receipt of the notice, failing which GGPL will take suitable actions under the law. No communication whatsoever was received from REPL. Therefore, as per the directions of the lawyer, GGPL filed an application to initiate Corporate Insolvency Resolution Process (CIRP)

against REPL. Also, they have sent a letter to the power company to disconnect the supply of electricity to REPL considering that they are not in a position to pay their dues Considering the above facts answer the following questions :

(a)State whether GGPL can file an application to initiate CIRP against REPL.

State the documents that are required to be attached with such application as per Insolvency and Bankruptcy Code, 2016.

June 2024Q. 2(c)(iv)5 marks for the whole sub-partSyllabus 2022
Show the facts common to all parts of Q. 2

(c)Panapathi G. Seeds Pvt. Ltd. a closely held private company was engaged in the business of processing oilseeds for edible oils. It was established in 1988 under the leadership of Panapathi G. Prasad. Within a decade, Panapathi G. Seeds Pvt. Ltd positioned itself as a leader in production of groundnut oil in the Western region of India with two premium brands.

In 2016 Panapathi G. Prasad had a severe heart attack and died without any succession plan in place. Ram and Sham, the two sons of Panapathi G. Prasad were also directors in the company with equal shareholding. After the death of Panapathi G. Prasad, both brothers had strained relations over the management control which adversely affected the business of the company. With declining profit and turnover both the brothers were worried and decided to reach a family settlement whereby the control of the company was handed over to the elder brother Ram. Sham resigned as the director of the company and in lieu of the same he was entrusted with the management and control of another family firm Saraswathi Edibles, wherein both brothers were partners. Praveen, son of Ram was inducted as director in the Company.

In 2018 Sham wanted to withdraw unsecured loan given by him to the company because the company stopped paying him interest on the loan. Despite follow up Sham was not paid either the principal or interest, which forced him to file an application under section 7 of the Insolvency and Bankruptcy Code 2016.

The Adjudicating Authority (i) admitted the application, (ii) declared moratorium and (iii)

appointed Nagarajan, as an Interim Resolution Professional (IRP). Ram refused to hand over the management control to the IRP on the plea that it was a family dispute, and they will settle soon on their own. He also asked the IRP not to make the public announcement.

IRP tried to persuade Ram citing the provisions of the Code and warned him that if he does not hand over control of the Corporate Debtor IRP will be forced to approach the Adjudicating Authority for appropriate orders. Thereafter Ram allowed the IRP to take inventory of the assets and stocks after 15 days from the insolvency commencement date.

With reference to the above facts and other details provided, answer the following questions with particular reference to the provisions contained in the Code, Regulations and rules of IBC and others :

(iv)On review of the bank accounts, IRP observed that sixteen months before the insolvency commencement date, a payment of ₹ 1 Crore has been made to a creditor viz., Saraswathi Edibles in which Ram is a partner. What is the status of this transaction under the code ?

December 2022Q. 1(b)(i)7 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

JCP Industries Ltd (JIL) was incorporated in the year 2011 with an authorized share capital of ₹2,000 crore having its registered office located in Mumbai with the main objects to carry out the business (a) manufacturing of heavy duty earth moving machinery and their spare parts (b) purchase, sale, construction of multi-story commercial and residential apartments under own name or as under Joint Development Agreements (c) Mining of minerals and thereafter refining and processing them for sale; and (d) doing the business in the hospitality sector by running and maintaining Hotels, Resorts and Budget Hotels. The paid-up share capital of the company as on date is ₹1,750 crore.

During the course of business, the company has approached various banks, state finance corporations and NBFCs for availing financial assistance in the nature of term loans and other facilities. However, based on the business plans and security offered, the finance proposal was approved by National Bank of India (the Bank) in the form of both fund based and non-fund based limits. The company during the course of its business operations was also availing credit for 90 days to 120 days from its creditors in connection with the purchase of raw material being used in the business of manufacturing heavy duty earth moving machineries, real estate, mining and hospitality sectors. The progress of the company since its incorporation till 31st March, 2019 was exceptional. However, because of certain transactions carried out by the directors with their relatives and other parties between 1st July, 2020 to 30th June, 2021 which were in the nature purchase of raw-material for different business segments of the company including the purchase of immovable properties as well as transferring and sale of goods and assets of the company to such related and other parties by givingthem preference over the other buyers ultimately resulted into mismatch in the cash flows and consequently resulted into losses to the company.

With an intention to grow organically, the company also incorporated a wholly owned subsidiary in the year 2017 under the name of JCP Buildcon Ltd (JAL) which was mainly engaged in the real estate business involving construction of apartments and flats in multi-story buildings under the Joint Development Agreements being entered into with the various parties including various State Governments under Housing Schemes. JAL entered into a tripartite Joint Development Agreement with Jaipur Development Authority (JDA) for construction of apartments and flats in multi-story buildings after development of land belonging to JDA. In an attempt to extend support to JIL, JAL had also mortgaged its assets in favour of banks in the month of August, 2018 when additional financial assistance was provided to JIL.

The financial condition of JIL started deteriorating after July, 2019 because of reduction in the business activities as well as default being committed in honoring the debt obligations towards banks, payment to trade creditors and delays in construction of apartments to be handed over to the buyers who had entered into agreements with the company and have paid almost 95% of the cost of the apartment.

The banks, trade creditors and buyers of the flats were constantly making follow up with the management but no reply was given to them by the management of JIL as well as JAL. National Bank of India during their internal review meeting informed their legal team that the promoter/directors may have siphoned off the money which was supposed to have been used for business purposes; since it appears to them that the amounts have been advanced to related parties and diverted towards a few suspicious transactions.

The bank despite the continuous follow up with the management and the Board of directors could not get any suitable response relating to the repayment plan to honor the debt obligations.

Considering the situation and based on the recommendation of their legal department, the bank decided to take action against the company under the Insolvency and Bankruptcy Code, 2016 (the Code) and thus filed an application on 16th February, 2022 before the Adjudicating Authority (AA) for initiating Corporate Insolvency Resolution Process (CIRP). In the application, the Bank had proposed name of Robin to act as Interim Resolution Professional (IRP). Simultaneously, other lenders of JAL also submitted an application before the AA to initiate CIRP against JAL for default in repayment of their dues.

After hearing the parties, the AA admitted the applications in the case of JIL and JAL on 25th April, 2022 and also confirmed the appointment of Robin as IRP in both the companies. In the case of JIL, Robin constituted a Committee of Creditors (CoC) on 15th May, 2022 and called first meeting of the CoC on 20th May, 2022. The constitution of CoC by Robin was challenged by the operational creditors as well as home buyers since their name was not included in the list of the CoC. Further, the members of the suspended Board of directors of JIL also challenged the actions of Robin who did not allow their participation in the first meeting of the CoC.

During the first meeting of the CoC in the case of JIL, Robin was confirmed to act as Resolution Professional (RP) by the CoC and was asked to invite the Expression of Interest (EoI) from the Resolution Applicants (RA) for submitting Resolution Plan.

Besides the above, JDA has also issued notice to JAL for taking over possession of the land given for the purpose of construction.

Considering the above facts answer the following questions :

(b)(i) JIL had also taken loan on the strength of property mortgaged by JAL.

Examine and state whether such transaction would be treated as a preferential transaction and whether the creditors of JIL will be treated as “Financial Creditors” of JAL since JAL had provided the securities for funding given to JIL.

June 2021Q. 1(c)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the following carefully and answer the questions given at the end :

Pine Food Industries Limited (“PFIL”) is one of the top FMCG player and listed entity in India. It is a leading manufacturer and marketer of various edible oils, food products and eatables. Its Authorized Capital is Rs. 252.00 crore and Paid-up Capital is Rs.

65.00 crore. PFIL has borrowed from various Banks and Financial institutions in India and its borrowings were around Rs. 12,000 Crore.

Due to unprecedented crash in global prices of the oil seeds coupled with falling revenues in the oil business gave a crippling blow to PFIL.

AB Bank and BC Bank filed an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (“Code”) for initiating the insolvency resolution process against PFIL (hereinafter called as the Corporate Debtor (“CD”)). After hearing both the parties, National Company Law Tribunal (“NCLT”) admitted the petition filed. The Financial Creditor proposed the name of Kapoor to act as Interim Resolution Professional (“IRP”).

An application was filed before NCLT by one of the creditors who made a claim before the Resolution Professional (“RP”) stating that the CD owed to pay USD 10.00 crore, based on the Bills of Exchanges, ordering the CD to pay this creditor for the goods supplied by another party. On making of such claim before the RP, it has been rejected by him saying that it is not a Financial Debt as it is an Operational Debt therefore, it could not be considered as Financial Debt as claimed by applicant therein.

Vijay Kumar Jain, suspended Director of the CD, filed an application before the NCLT under section 60(5) of the Code seeking an order for setting aside the decision taken by the Committee of Creditors (“CoC”) disallowing the erstwhile representatives of the Corporate Debtor including Vijay to participate in the CoC meetings; declare that the CoC meeting is non est; direct the RP to ensure active participation of the applicant in the meetings of CoC; provide all the documents and information to the applicant.

RP filed application in NCLT under section 43(1) of the Code for seeking reversal of the amounts that were debited from the current accounts of the CD maintained with XYZ Bank which had been debited by the XYZ Bank before the insolvency commencement date and were utilized against the payment of the dues owed by the CD to a Bank in relation to the Letter of Credit issued by them.

The RP submits that the payment of the impugned amount lead to preferential treatment towards XYZ Bank by the CD as such payment has the effect of putting Respondents (i.e. XYZ Bank) in a beneficial position than it would have been in liquidation of the CD in accordance with Section 53 of the Code. It is further stated by the RP that the payments of the impugned amount by the Corporate Debtor were not in the “ordinary course of business” of the CD.

NCLT, vide its order, held that the respondent Bank, which had debited an amount aggregating to Rs. 65.98 crores from the current accounts of the Corporate Debtor is directed to reverse the said amount within 30 days from the date of the said order.

Since the resolution plan is already submitted and under examination of the CoC without consideration of this amount, therefore the appropriation of this amount will be decided by the CoC. XYZ Bank filed appeal in NCLAT against the order of NCLT.

The main plea taken by the Appellant Bank is that the RP before filing an application under Section 43(1) of the Code formed no independent opinion nor afforded an opportunity to the Appellant to explain about the transactions in question.

The RP called for Expression of Interest (“EOI”). 28 prospective resolution applicants showed their interest out of which two prospective resolution applicants were rejected as one was disqualified under Section 29 A of the Code (being related party) and the other was a financial investor who did not meet the criteria in the EOI evaluation parameters.

The applicant reviewed the four Resolution Plans submitted by the Resolution Applicants and found that only the plans submitted by 2 Resolution Applicants (RA1 and RA2) provided for the corporate insolvency resolution of the Corporate Debtor as a whole and on a going concern basis.

The RP filed application under section 30(6) of the Code, seeking order for approval of the resolution plan for the Corporate Debtor submitted by the consortium led by PAL (RA2) as approved by the members of Committee of Creditors (CoC). The said resolution plan was approved by a vote share of 96.85%. RP filed application in NCLT for approval of Resolution Plan.

While the said application was pending for consideration before the NCLT, Hon’ble Supreme Court, in Vijay Kumar Jain Vs. Standard Chartered Bank & Ors pronounced the judgment. Under the Judgment of Hon’ble Supreme Court, the approval of the NCLT to the resolution plan of RA2 was interdicted. In compliance of the above-mentioned Hon'ble Supreme Court order, NCLT by its order directed as follows :

“Resolution Professional is directed to comply with the directions of the Hon’ble Supreme Court and submit the report within the stipulated time as provided by the Hon'ble Supreme Court.”

Thereafter, NCLT approved the Resolution Plan submitted by RA2 and passed orders and directions on the reliefs and concession sought.

Since in Para 38, NCLT in their order rejected some of the relief sought, RA2 moved to NCLT for modification of order of NCLT.

In the application filed, RA2 had sought substitution of Para 38 of the order of NCLT approving the Resolution Plan of RA2 as under :

Existing Para “38. Any relief sought for in the Resolution Plan, where the contract/agreement/ understanding/ proceedings/actions/notice etc is not specifically identified or is for future and contingent liability, is at this moment rejected.”

Proposed Para “All claims that were either not filed or not admitted during CIRP in terms of the provisions of the Insolvency and Bankruptcy Code, 2016 shall stand extinguished.

Further, claims admitted/ verified by the Resolution Professional shall stand settled and extinguished as per the Resolution Plan.”

Resolution Plan approved by NCLT of RA2 leads to a 60% haircut for the lenders.

RA2 completed its acquisition of PFIL.

Referring decided case and relevant provisions of the Insolvency and Bankruptcy Code (IBC), 2016 and Rules and Regulations made thereunder, answer the following questions :

(c)Explain the decision of NCLAT in the aforesaid case filed by XYZ Bank for Section 43 transactions. Referring relevant provisions, brief against whom the application under Section 43 of the IB Code can be filed and what orders can be passed thereunder.

June 2025Q. 1(a)(iv)4 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(a)Read the following background information and answer the questions :

The Insolvency and Bankruptcy Code, 2016 (IBC, 2016) creates an ecosystem for maximizing the value of assets of the Corporate Debtor (CD) and balancing the interests of all stakeholders in a time-bound manner. A significant value of insolvent entities is often locked in assets underlying avoidance transactions which are undertaken by the CD prior to the initiation of the Corporate Insolvency Resolution Process (CIRP). The Resolution Professional (RP) or the liquidator is obliged to file applications, in respect of Avoidance Transactions (Preferential, Undervalued, Fraudulent and Extortionate (PUFE) Transactions) found by him during CIRP and Liquidation Processes before the Hon’ble Adjudicating Authority (AA), seeking appropriate relief permissible under the Code.

As of end of September 2024, 1,326 Avoidance Transaction Applications involving an amount of ₹ 3.76 lakh Crore have been filed with the AA. The AA, after consideration, can order for the amount to be clawed back. The IBC has led to a direct recovery of about ₹ 3.55 Lakh Crore due to Resolution and ₹ 10,446 Crore due to Liquidation till September, 2024. The Recovery from Avoidance Transactions will add to this recovery to the Creditors. Till September 2024, 338 Avoidance Transaction Applications have been settled by the AA ordering a claw back of about ₹ 7,516 Crore.

While the RP/Liquidator may have filed an Application with the AA based on his determination, it may not always be possible for the AA to consider and dispose of the application during the tenure of the CIRP or the Liquidation Process. Section 26 of the Code clarifies that the filing of an Avoidance Application by the RP shall not affect the proceedings of CIRP. Avoidance Applications and CIRP are a separate set of proceedings and Avoidance Applications can be continued Post-completion of CIRP. The IBC provides that the Resolution/Liquidation Process should not be held up if Avoidance Transaction Applications are pending. During CIRP if the decision on Avoidance Transactions is pending before Resolution is finalised, the amount would claw back to CD for the benefit of Creditors. The CIRP Regulations mandate that a Resolution Plan should contain the details of the Party/Person who will pursue these Avoidance Transactions after the Approval of the Resolution Plan, who will get the proceeds and the manner in which the proceeds, if any, from such proceedings will be distributed.

Consequently, after the Resolution Plan is approved, the RP has no role in pursuing these transactions and Creditors / Successful Resolution Applicant (SRA) will have to make their own arrangements to pursue them before the AA.

The amount clawed back would reflect in higher bids. In cases where decision on Avoidance Transactions is not available, the Avoidance Transactions being Assets of the CD, could be permitted by the CoC to be bid by Prospective Resolution Applicants (PRAs) in the Resolution plan. In case the CoC decides to assign the Avoidance Transactions to a Resolution Applicant (RA), the specifics of Avoidance Transactions should be made explicit in the information Memorandum (IM) and Request for Resolution Plan (RFRP), allowing prospective RAs to account for the value of Avoidance Transactions while submitting their plan. The CoC in the Resolution Plan should not give the proceeds of Avoidance Transactions to the RA without detailing such transactions in the IM or RFRP and without transparent bidding for such transactions. Another option could be to invite bids for Avoidance Transactions separately after obtaining the Approval of AA and the amount recovered could be appropriated by the Creditors Post-approval from the AA.

The provisions for Avoidance Transactions aid in maximizing the value of the CD both ex-post (i.e., once the CD is in Insolvency) and Ex-ante. These provisions foster good Corporate Governance and deter solvent entities and market participants from engaging in activities involving diversion of funds from the CD. By annulling such transactions, the Code Aims to prevent the depletion of the Debtor’s Assets and protect the interest of Creditors and other Stakeholders. They would act as an additional source of Recovery for the Creditors.

The Code calls upon the Resolution Professional/Liquidator, as the case may be, to bring to the knowledge to the Adjudicating Authority, transactions of Preferential. Under- value, Extortionate, Fraudulent, or unlawful nature, if any, identified during the course of CIRP or Liquidation. Considering the huge sums involved in these transactions, provisions for the same, in IBC as well as on a global scale, is of utmost importance.

In ABC Bank Limited v. JIL, the NCLT Bench, dealt with a crucial aspect of Insolvency proceedings, that is, vulnerable transactions. The Resolution Professional (RP) of the Corporate Debtor filed application in relation to a mortgage of an immovable property belonging to the Corporate Debtor to secure the debt of a related party (that is, the Holding Company of the Corporate Debtor). The RP sought directions, inter alia so as to declare the transaction as Preferential, Undervalued and “Fraudulent and Wrongful” under the Code.

Facts in a decided case :

In ABC Bank Ltd. v. JIL, certain mortgages created by JIL in favour of the lenders of its Holding Company JAL.

l JIL was a special purpose Company promoted by JAL for certain design, engineering, development and construction projects. JAL held approximately 70% of the shares of JIL.

l JIL started facing financial difficulties and failed to honour its project completion deadlines. It also started defaulting on its loan payments due to its financial creditors.

One of the lenders declared JIL as a Non-Performing Account (‘‘NPA’’) first and other lenders declared it as a NPA subsequently.

l JIL Mortgaged 800 plus Acres of unencumbered land owned by it to secure the debt of JAL, vide Mortgage Deeds entered on various dates.

l The NCLT Admitted an application filed by one of JIL’s Financial Creditors, IDBI Bank Ltd., for initiating Insolvency Proceedings under the Code, and appointed an Interim Resolution Professional (‘‘IRP’’).

l The IRP examined various transactions entered into by JIL with its promoter shareholders, pursuant to his duties as a Resolution Professional.

l The IRP, consequently filed an Application before the NCLT seeking declarations that the Impugned Transactions were :

(i)Fraudulent Transactions under Section 66 of the Code;

(ii)Preferential Transactions under Section 43 of the Code; and

(iii)Undervalued Transactions under Section 45 of the Code; and sought consequent reliefs (‘‘Application’’).

In the light of the above information and with reference to the relevant provisions and decision of Adjudicating Authority (NCLT Bench) under IBC, 2016, answer the following Questions :

(iv)Based on the decided case law, answer whether the Transaction in the above mentioned case a Preferential Transaction ?

June 2025Q. 1(a)(v)5 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(a)Read the following background information and answer the questions :

The Insolvency and Bankruptcy Code, 2016 (IBC, 2016) creates an ecosystem for maximizing the value of assets of the Corporate Debtor (CD) and balancing the interests of all stakeholders in a time-bound manner. A significant value of insolvent entities is often locked in assets underlying avoidance transactions which are undertaken by the CD prior to the initiation of the Corporate Insolvency Resolution Process (CIRP). The Resolution Professional (RP) or the liquidator is obliged to file applications, in respect of Avoidance Transactions (Preferential, Undervalued, Fraudulent and Extortionate (PUFE) Transactions) found by him during CIRP and Liquidation Processes before the Hon’ble Adjudicating Authority (AA), seeking appropriate relief permissible under the Code.

As of end of September 2024, 1,326 Avoidance Transaction Applications involving an amount of ₹ 3.76 lakh Crore have been filed with the AA. The AA, after consideration, can order for the amount to be clawed back. The IBC has led to a direct recovery of about ₹ 3.55 Lakh Crore due to Resolution and ₹ 10,446 Crore due to Liquidation till September, 2024. The Recovery from Avoidance Transactions will add to this recovery to the Creditors. Till September 2024, 338 Avoidance Transaction Applications have been settled by the AA ordering a claw back of about ₹ 7,516 Crore.

While the RP/Liquidator may have filed an Application with the AA based on his determination, it may not always be possible for the AA to consider and dispose of the application during the tenure of the CIRP or the Liquidation Process. Section 26 of the Code clarifies that the filing of an Avoidance Application by the RP shall not affect the proceedings of CIRP. Avoidance Applications and CIRP are a separate set of proceedings and Avoidance Applications can be continued Post-completion of CIRP. The IBC provides that the Resolution/Liquidation Process should not be held up if Avoidance Transaction Applications are pending. During CIRP if the decision on Avoidance Transactions is pending before Resolution is finalised, the amount would claw back to CD for the benefit of Creditors. The CIRP Regulations mandate that a Resolution Plan should contain the details of the Party/Person who will pursue these Avoidance Transactions after the Approval of the Resolution Plan, who will get the proceeds and the manner in which the proceeds, if any, from such proceedings will be distributed.

Consequently, after the Resolution Plan is approved, the RP has no role in pursuing these transactions and Creditors / Successful Resolution Applicant (SRA) will have to make their own arrangements to pursue them before the AA.

The amount clawed back would reflect in higher bids. In cases where decision on Avoidance Transactions is not available, the Avoidance Transactions being Assets of the CD, could be permitted by the CoC to be bid by Prospective Resolution Applicants (PRAs) in the Resolution plan. In case the CoC decides to assign the Avoidance Transactions to a Resolution Applicant (RA), the specifics of Avoidance Transactions should be made explicit in the information Memorandum (IM) and Request for Resolution Plan (RFRP), allowing prospective RAs to account for the value of Avoidance Transactions while submitting their plan. The CoC in the Resolution Plan should not give the proceeds of Avoidance Transactions to the RA without detailing such transactions in the IM or RFRP and without transparent bidding for such transactions. Another option could be to invite bids for Avoidance Transactions separately after obtaining the Approval of AA and the amount recovered could be appropriated by the Creditors Post-approval from the AA.

The provisions for Avoidance Transactions aid in maximizing the value of the CD both ex-post (i.e., once the CD is in Insolvency) and Ex-ante. These provisions foster good Corporate Governance and deter solvent entities and market participants from engaging in activities involving diversion of funds from the CD. By annulling such transactions, the Code Aims to prevent the depletion of the Debtor’s Assets and protect the interest of Creditors and other Stakeholders. They would act as an additional source of Recovery for the Creditors.

The Code calls upon the Resolution Professional/Liquidator, as the case may be, to bring to the knowledge to the Adjudicating Authority, transactions of Preferential. Under- value, Extortionate, Fraudulent, or unlawful nature, if any, identified during the course of CIRP or Liquidation. Considering the huge sums involved in these transactions, provisions for the same, in IBC as well as on a global scale, is of utmost importance.

In ABC Bank Limited v. JIL, the NCLT Bench, dealt with a crucial aspect of Insolvency proceedings, that is, vulnerable transactions. The Resolution Professional (RP) of the Corporate Debtor filed application in relation to a mortgage of an immovable property belonging to the Corporate Debtor to secure the debt of a related party (that is, the Holding Company of the Corporate Debtor). The RP sought directions, inter alia so as to declare the transaction as Preferential, Undervalued and “Fraudulent and Wrongful” under the Code.

Facts in a decided case :

In ABC Bank Ltd. v. JIL, certain mortgages created by JIL in favour of the lenders of its Holding Company JAL.

l JIL was a special purpose Company promoted by JAL for certain design, engineering, development and construction projects. JAL held approximately 70% of the shares of JIL.

l JIL started facing financial difficulties and failed to honour its project completion deadlines. It also started defaulting on its loan payments due to its financial creditors.

One of the lenders declared JIL as a Non-Performing Account (‘‘NPA’’) first and other lenders declared it as a NPA subsequently.

l JIL Mortgaged 800 plus Acres of unencumbered land owned by it to secure the debt of JAL, vide Mortgage Deeds entered on various dates.

l The NCLT Admitted an application filed by one of JIL’s Financial Creditors, IDBI Bank Ltd., for initiating Insolvency Proceedings under the Code, and appointed an Interim Resolution Professional (‘‘IRP’’).

l The IRP examined various transactions entered into by JIL with its promoter shareholders, pursuant to his duties as a Resolution Professional.

l The IRP, consequently filed an Application before the NCLT seeking declarations that the Impugned Transactions were :

(i)Fraudulent Transactions under Section 66 of the Code;

(ii)Preferential Transactions under Section 43 of the Code; and

(iii)Undervalued Transactions under Section 45 of the Code; and sought consequent reliefs (‘‘Application’’).

In the light of the above information and with reference to the relevant provisions and decision of Adjudicating Authority (NCLT Bench) under IBC, 2016, answer the following Questions :

(v)Based on the decided case law, answer whether the relief of ‘‘Ordinary Course of Business’’ available in the above-mentioned Case ?

June 2025Q. 1(a)(vii)5 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(a)Read the following background information and answer the questions :

The Insolvency and Bankruptcy Code, 2016 (IBC, 2016) creates an ecosystem for maximizing the value of assets of the Corporate Debtor (CD) and balancing the interests of all stakeholders in a time-bound manner. A significant value of insolvent entities is often locked in assets underlying avoidance transactions which are undertaken by the CD prior to the initiation of the Corporate Insolvency Resolution Process (CIRP). The Resolution Professional (RP) or the liquidator is obliged to file applications, in respect of Avoidance Transactions (Preferential, Undervalued, Fraudulent and Extortionate (PUFE) Transactions) found by him during CIRP and Liquidation Processes before the Hon’ble Adjudicating Authority (AA), seeking appropriate relief permissible under the Code.

As of end of September 2024, 1,326 Avoidance Transaction Applications involving an amount of ₹ 3.76 lakh Crore have been filed with the AA. The AA, after consideration, can order for the amount to be clawed back. The IBC has led to a direct recovery of about ₹ 3.55 Lakh Crore due to Resolution and ₹ 10,446 Crore due to Liquidation till September, 2024. The Recovery from Avoidance Transactions will add to this recovery to the Creditors. Till September 2024, 338 Avoidance Transaction Applications have been settled by the AA ordering a claw back of about ₹ 7,516 Crore.

While the RP/Liquidator may have filed an Application with the AA based on his determination, it may not always be possible for the AA to consider and dispose of the application during the tenure of the CIRP or the Liquidation Process. Section 26 of the Code clarifies that the filing of an Avoidance Application by the RP shall not affect the proceedings of CIRP. Avoidance Applications and CIRP are a separate set of proceedings and Avoidance Applications can be continued Post-completion of CIRP. The IBC provides that the Resolution/Liquidation Process should not be held up if Avoidance Transaction Applications are pending. During CIRP if the decision on Avoidance Transactions is pending before Resolution is finalised, the amount would claw back to CD for the benefit of Creditors. The CIRP Regulations mandate that a Resolution Plan should contain the details of the Party/Person who will pursue these Avoidance Transactions after the Approval of the Resolution Plan, who will get the proceeds and the manner in which the proceeds, if any, from such proceedings will be distributed.

Consequently, after the Resolution Plan is approved, the RP has no role in pursuing these transactions and Creditors / Successful Resolution Applicant (SRA) will have to make their own arrangements to pursue them before the AA.

The amount clawed back would reflect in higher bids. In cases where decision on Avoidance Transactions is not available, the Avoidance Transactions being Assets of the CD, could be permitted by the CoC to be bid by Prospective Resolution Applicants (PRAs) in the Resolution plan. In case the CoC decides to assign the Avoidance Transactions to a Resolution Applicant (RA), the specifics of Avoidance Transactions should be made explicit in the information Memorandum (IM) and Request for Resolution Plan (RFRP), allowing prospective RAs to account for the value of Avoidance Transactions while submitting their plan. The CoC in the Resolution Plan should not give the proceeds of Avoidance Transactions to the RA without detailing such transactions in the IM or RFRP and without transparent bidding for such transactions. Another option could be to invite bids for Avoidance Transactions separately after obtaining the Approval of AA and the amount recovered could be appropriated by the Creditors Post-approval from the AA.

The provisions for Avoidance Transactions aid in maximizing the value of the CD both ex-post (i.e., once the CD is in Insolvency) and Ex-ante. These provisions foster good Corporate Governance and deter solvent entities and market participants from engaging in activities involving diversion of funds from the CD. By annulling such transactions, the Code Aims to prevent the depletion of the Debtor’s Assets and protect the interest of Creditors and other Stakeholders. They would act as an additional source of Recovery for the Creditors.

The Code calls upon the Resolution Professional/Liquidator, as the case may be, to bring to the knowledge to the Adjudicating Authority, transactions of Preferential. Under- value, Extortionate, Fraudulent, or unlawful nature, if any, identified during the course of CIRP or Liquidation. Considering the huge sums involved in these transactions, provisions for the same, in IBC as well as on a global scale, is of utmost importance.

In ABC Bank Limited v. JIL, the NCLT Bench, dealt with a crucial aspect of Insolvency proceedings, that is, vulnerable transactions. The Resolution Professional (RP) of the Corporate Debtor filed application in relation to a mortgage of an immovable property belonging to the Corporate Debtor to secure the debt of a related party (that is, the Holding Company of the Corporate Debtor). The RP sought directions, inter alia so as to declare the transaction as Preferential, Undervalued and “Fraudulent and Wrongful” under the Code.

Facts in a decided case :

In ABC Bank Ltd. v. JIL, certain mortgages created by JIL in favour of the lenders of its Holding Company JAL.

l JIL was a special purpose Company promoted by JAL for certain design, engineering, development and construction projects. JAL held approximately 70% of the shares of JIL.

l JIL started facing financial difficulties and failed to honour its project completion deadlines. It also started defaulting on its loan payments due to its financial creditors.

One of the lenders declared JIL as a Non-Performing Account (‘‘NPA’’) first and other lenders declared it as a NPA subsequently.

l JIL Mortgaged 800 plus Acres of unencumbered land owned by it to secure the debt of JAL, vide Mortgage Deeds entered on various dates.

l The NCLT Admitted an application filed by one of JIL’s Financial Creditors, IDBI Bank Ltd., for initiating Insolvency Proceedings under the Code, and appointed an Interim Resolution Professional (‘‘IRP’’).

l The IRP examined various transactions entered into by JIL with its promoter shareholders, pursuant to his duties as a Resolution Professional.

l The IRP, consequently filed an Application before the NCLT seeking declarations that the Impugned Transactions were :

(i)Fraudulent Transactions under Section 66 of the Code;

(ii)Preferential Transactions under Section 43 of the Code; and

(iii)Undervalued Transactions under Section 45 of the Code; and sought consequent reliefs (‘‘Application’’).

In the light of the above information and with reference to the relevant provisions and decision of Adjudicating Authority (NCLT Bench) under IBC, 2016, answer the following Questions :

(vii)Based on the decided case law, answer whether look-back period will be 1 Year or 2 Years in the above-mentioned Case ?

December 2025Q. 4(d)10 marksSyllabus 2022

(d)The Insolvency and Bankruptcy Code, 2016 (IBC/Code) creates an ecosystem for maximizing the value of assets of the corporate debtor (CD) and balancing the interests of all stakeholders in a time-bound manner. A significant value of insolvent entities is often locked in assets underlying avoidance transactions which are undertaken by the CD prior to the initiation of the Corporate Insolvency Resolution Process (CIRP). The resolution professional (RP) or the liquidator is obliged to file applications, in respect of avoidance transactions (preferential, undervalued, extortionate and fraudulent transactions) found by him during CIRP and liquidation processes before the Hon’ble Adjudicating Authority (AA), seeking appropriate relief permissible under the Code.

While the RP/Liquidator may have filed an application with the AA based on his determination, it may not always be possible for the AA to consider and dispose of the application during the tenure of the CIRP or the liquidation process. Section 26 of the Code clarifies that the filing of an avoidance application by the RP shall not affect the proceedings of CIRP. Avoidance applications and CIRP are a separate set of proceedings and avoidance applications can be continued post-completion of CIRP. The IBC provides that the resolution / liquidation process should not be held up if avoidance transaction applications are pending. During CIRP, if the decision on avoidance transactions is pending before resolution is finalised, the amount would claw back to CD for the benefit of creditors. The CIRP Regulations mandate that a resolution plan should contain the details of the party / person who will pursue these avoidance transactions after the approval of the resolution plan, who will get the proceeds and the manner in which the proceeds, if any, from such proceedings will be distributed.

Consequently, after the resolution plan is approved, the RP has no role in pursuing these transactions and creditors/successful resolution applicant (SRA) will have to make their own arrangements to pursue them before the AA.

The amount clawed back would reflect in higher bids. In cases where decision on avoidance transactions is not available, the avoidance transactions being assets of the CD, could be permitted by the CoC to be bid by prospective resolution applicants (PRAs) in the resolution plan. In case the CoC decides to assign the avoidance transactions to a resolution applicant (RA), the specifics of avoidance transactions should be made explicit in the Information Memorandum (IM) and Request for Resolution Plan (RFRP), allowing prospective RAs to account for the value of avoidance transactions while submitting their plan. The CoC in the resolution plan should not give the proceeds of avoidance transactions to the RA without detailing such transactions in the IM or RFRP and without transparent bidding for such transactions. Another option could be to invite bids for avoidance transactions separately after obtaining the approval of AA and the amount recovered could be appropriated by the creditors post-approval from the AA.

Since avoidance transactions involve significant sums and potentially result in large recoveries, creditors should keep these avoidance transactions to themselves and benefit from the upside.

XYZ Company Limited, who is now under CIRP, The Committee of Creditors on the advice of Resolution Professional as appointed Forensic Auditor to track the transactions and to identify whether any transactions had been done in violations of the Code. The Transactional Auditor has identified few of the transactions under Sections 43, 45, 66 and 50 of the IBC, 2016.

Before, the Transactional Auditor submit his report, the Resolution Professional as a Company Secretary sort your suggestions on how the following “Transactions” be divided under four separate categories viz., (a) Preferential Transactions (b) Undervalued Transactions (c)

Fraudulent Transactions and (d) Extortionate Transactions, based on the above information.

List of transactions (assume that these transactions are carried within the timelines specified under the Code) :

(i)Payment to unsecured family loans during the look back period, while the debt of secured creditors is outstanding.

(ii)Payment of old operational creditors (other than regular business payments against supply of goods or services), while the debt of secured creditors or unsecured financial creditors are outstanding.

(iii)Payment to an Unsecured Financial Creditor, may be as per pre-fixed loan instalments, while the debt of secured creditors is still outstanding.

(iv)Sale of fancy and expensive cars owned by the Corporate Debtor to related parties or unrelated parties at a value which is much less than the market value of the car.

(v)Six months before initiation of Corporate Insolvency Resolution Process, the Managing Director has availed a private finance of ₹ 5 Crore from his relative at the interest rate of 60% p.a. and repayable within 5 years.

(vi)Payment to those creditors who have security of post-dated cheques signed by the directors.

(vii)Payment of old tax dues where there exists a risk of prosecution without any order from a court or authority.

(viii)Transfer of good franchisees to another person at a value which is much lower than the actual value.

(ix)Transfer of shares of subsidiary companies where the business is lucrative at a price which is less than the actual value.

(x)Corporate Debtor had bought new Machinery worth ₹ 2 Crore, just one year before initiation of Corporate Insolvency Resolution Process (CIRP), the Chairman of the Company, in order to protect the machinery being part of CIRP, transferred the same to a Company in which majority stake is held by his brother’s son for a value of ₹ 50 Lakh payable in 2 instalments.

Write the transaction and then identify the category of each of the transaction.

June 2026Q. 4(a)5 marksSyllabus 2022

(a)PQR Manufacturing Limited, a company engaged in the production of industrial equipment, defaulted on its financial obligations and insolvency proceedings were initiated against it before the National Company Law Tribunal under the Insolvency and Bankruptcy Code, 2016. A Resolution Professional was subsequently appointed to manage the affairs of the company and examine its financial records.

While reviewing past transactions, the Resolution Professional discovered that approximately one year before the commencement of insolvency proceedings, the company had transferred a valuable warehouse property to another company closely connected with its promoters. The property, which had a significantly higher market value, was transferred for a consideration for below its estimated worth.

The Resolution Professional also observed that such transfer was not part of the ordinary course of business of the company and that the transaction had the effect of substantially reducing the asset base available to creditors during the insolvency process.

The transferee company, however, argued that the transaction was a valid commercial arrangement entered into with the consent of the management of the corporate debtor.

In light of these facts, examine whether the Resolution Professional can challenge such a transaction before the National Company Law Tribunal. Also explain the possible powers of the tribunal if it finds that the transaction was detrimental to the interests of the creditors.

June 2025Q. 1(a)(vi)3 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(a)Read the following background information and answer the questions :

The Insolvency and Bankruptcy Code, 2016 (IBC, 2016) creates an ecosystem for maximizing the value of assets of the Corporate Debtor (CD) and balancing the interests of all stakeholders in a time-bound manner. A significant value of insolvent entities is often locked in assets underlying avoidance transactions which are undertaken by the CD prior to the initiation of the Corporate Insolvency Resolution Process (CIRP). The Resolution Professional (RP) or the liquidator is obliged to file applications, in respect of Avoidance Transactions (Preferential, Undervalued, Fraudulent and Extortionate (PUFE) Transactions) found by him during CIRP and Liquidation Processes before the Hon’ble Adjudicating Authority (AA), seeking appropriate relief permissible under the Code.

As of end of September 2024, 1,326 Avoidance Transaction Applications involving an amount of ₹ 3.76 lakh Crore have been filed with the AA. The AA, after consideration, can order for the amount to be clawed back. The IBC has led to a direct recovery of about ₹ 3.55 Lakh Crore due to Resolution and ₹ 10,446 Crore due to Liquidation till September, 2024. The Recovery from Avoidance Transactions will add to this recovery to the Creditors. Till September 2024, 338 Avoidance Transaction Applications have been settled by the AA ordering a claw back of about ₹ 7,516 Crore.

While the RP/Liquidator may have filed an Application with the AA based on his determination, it may not always be possible for the AA to consider and dispose of the application during the tenure of the CIRP or the Liquidation Process. Section 26 of the Code clarifies that the filing of an Avoidance Application by the RP shall not affect the proceedings of CIRP. Avoidance Applications and CIRP are a separate set of proceedings and Avoidance Applications can be continued Post-completion of CIRP. The IBC provides that the Resolution/Liquidation Process should not be held up if Avoidance Transaction Applications are pending. During CIRP if the decision on Avoidance Transactions is pending before Resolution is finalised, the amount would claw back to CD for the benefit of Creditors. The CIRP Regulations mandate that a Resolution Plan should contain the details of the Party/Person who will pursue these Avoidance Transactions after the Approval of the Resolution Plan, who will get the proceeds and the manner in which the proceeds, if any, from such proceedings will be distributed.

Consequently, after the Resolution Plan is approved, the RP has no role in pursuing these transactions and Creditors / Successful Resolution Applicant (SRA) will have to make their own arrangements to pursue them before the AA.

The amount clawed back would reflect in higher bids. In cases where decision on Avoidance Transactions is not available, the Avoidance Transactions being Assets of the CD, could be permitted by the CoC to be bid by Prospective Resolution Applicants (PRAs) in the Resolution plan. In case the CoC decides to assign the Avoidance Transactions to a Resolution Applicant (RA), the specifics of Avoidance Transactions should be made explicit in the information Memorandum (IM) and Request for Resolution Plan (RFRP), allowing prospective RAs to account for the value of Avoidance Transactions while submitting their plan. The CoC in the Resolution Plan should not give the proceeds of Avoidance Transactions to the RA without detailing such transactions in the IM or RFRP and without transparent bidding for such transactions. Another option could be to invite bids for Avoidance Transactions separately after obtaining the Approval of AA and the amount recovered could be appropriated by the Creditors Post-approval from the AA.

The provisions for Avoidance Transactions aid in maximizing the value of the CD both ex-post (i.e., once the CD is in Insolvency) and Ex-ante. These provisions foster good Corporate Governance and deter solvent entities and market participants from engaging in activities involving diversion of funds from the CD. By annulling such transactions, the Code Aims to prevent the depletion of the Debtor’s Assets and protect the interest of Creditors and other Stakeholders. They would act as an additional source of Recovery for the Creditors.

The Code calls upon the Resolution Professional/Liquidator, as the case may be, to bring to the knowledge to the Adjudicating Authority, transactions of Preferential. Under- value, Extortionate, Fraudulent, or unlawful nature, if any, identified during the course of CIRP or Liquidation. Considering the huge sums involved in these transactions, provisions for the same, in IBC as well as on a global scale, is of utmost importance.

In ABC Bank Limited v. JIL, the NCLT Bench, dealt with a crucial aspect of Insolvency proceedings, that is, vulnerable transactions. The Resolution Professional (RP) of the Corporate Debtor filed application in relation to a mortgage of an immovable property belonging to the Corporate Debtor to secure the debt of a related party (that is, the Holding Company of the Corporate Debtor). The RP sought directions, inter alia so as to declare the transaction as Preferential, Undervalued and “Fraudulent and Wrongful” under the Code.

Facts in a decided case :

In ABC Bank Ltd. v. JIL, certain mortgages created by JIL in favour of the lenders of its Holding Company JAL.

l JIL was a special purpose Company promoted by JAL for certain design, engineering, development and construction projects. JAL held approximately 70% of the shares of JIL.

l JIL started facing financial difficulties and failed to honour its project completion deadlines. It also started defaulting on its loan payments due to its financial creditors.

One of the lenders declared JIL as a Non-Performing Account (‘‘NPA’’) first and other lenders declared it as a NPA subsequently.

l JIL Mortgaged 800 plus Acres of unencumbered land owned by it to secure the debt of JAL, vide Mortgage Deeds entered on various dates.

l The NCLT Admitted an application filed by one of JIL’s Financial Creditors, IDBI Bank Ltd., for initiating Insolvency Proceedings under the Code, and appointed an Interim Resolution Professional (‘‘IRP’’).

l The IRP examined various transactions entered into by JIL with its promoter shareholders, pursuant to his duties as a Resolution Professional.

l The IRP, consequently filed an Application before the NCLT seeking declarations that the Impugned Transactions were :

(i)Fraudulent Transactions under Section 66 of the Code;

(ii)Preferential Transactions under Section 43 of the Code; and

(iii)Undervalued Transactions under Section 45 of the Code; and sought consequent reliefs (‘‘Application’’).

In the light of the above information and with reference to the relevant provisions and decision of Adjudicating Authority (NCLT Bench) under IBC, 2016, answer the following Questions :

(vi)Based on the decided case law, answer whether the Transaction was an Undervalued Transaction in the above-mentioned Case ?

December 2019Q. 4(b)(ii)3 marksSyllabus 2017

(ii)What is the relevant period for avoiding any undervalued transactions ?

June 2025Q. 1(a)(viii)3 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(a)Read the following background information and answer the questions :

The Insolvency and Bankruptcy Code, 2016 (IBC, 2016) creates an ecosystem for maximizing the value of assets of the Corporate Debtor (CD) and balancing the interests of all stakeholders in a time-bound manner. A significant value of insolvent entities is often locked in assets underlying avoidance transactions which are undertaken by the CD prior to the initiation of the Corporate Insolvency Resolution Process (CIRP). The Resolution Professional (RP) or the liquidator is obliged to file applications, in respect of Avoidance Transactions (Preferential, Undervalued, Fraudulent and Extortionate (PUFE) Transactions) found by him during CIRP and Liquidation Processes before the Hon’ble Adjudicating Authority (AA), seeking appropriate relief permissible under the Code.

As of end of September 2024, 1,326 Avoidance Transaction Applications involving an amount of ₹ 3.76 lakh Crore have been filed with the AA. The AA, after consideration, can order for the amount to be clawed back. The IBC has led to a direct recovery of about ₹ 3.55 Lakh Crore due to Resolution and ₹ 10,446 Crore due to Liquidation till September, 2024. The Recovery from Avoidance Transactions will add to this recovery to the Creditors. Till September 2024, 338 Avoidance Transaction Applications have been settled by the AA ordering a claw back of about ₹ 7,516 Crore.

While the RP/Liquidator may have filed an Application with the AA based on his determination, it may not always be possible for the AA to consider and dispose of the application during the tenure of the CIRP or the Liquidation Process. Section 26 of the Code clarifies that the filing of an Avoidance Application by the RP shall not affect the proceedings of CIRP. Avoidance Applications and CIRP are a separate set of proceedings and Avoidance Applications can be continued Post-completion of CIRP. The IBC provides that the Resolution/Liquidation Process should not be held up if Avoidance Transaction Applications are pending. During CIRP if the decision on Avoidance Transactions is pending before Resolution is finalised, the amount would claw back to CD for the benefit of Creditors. The CIRP Regulations mandate that a Resolution Plan should contain the details of the Party/Person who will pursue these Avoidance Transactions after the Approval of the Resolution Plan, who will get the proceeds and the manner in which the proceeds, if any, from such proceedings will be distributed.

Consequently, after the Resolution Plan is approved, the RP has no role in pursuing these transactions and Creditors / Successful Resolution Applicant (SRA) will have to make their own arrangements to pursue them before the AA.

The amount clawed back would reflect in higher bids. In cases where decision on Avoidance Transactions is not available, the Avoidance Transactions being Assets of the CD, could be permitted by the CoC to be bid by Prospective Resolution Applicants (PRAs) in the Resolution plan. In case the CoC decides to assign the Avoidance Transactions to a Resolution Applicant (RA), the specifics of Avoidance Transactions should be made explicit in the information Memorandum (IM) and Request for Resolution Plan (RFRP), allowing prospective RAs to account for the value of Avoidance Transactions while submitting their plan. The CoC in the Resolution Plan should not give the proceeds of Avoidance Transactions to the RA without detailing such transactions in the IM or RFRP and without transparent bidding for such transactions. Another option could be to invite bids for Avoidance Transactions separately after obtaining the Approval of AA and the amount recovered could be appropriated by the Creditors Post-approval from the AA.

The provisions for Avoidance Transactions aid in maximizing the value of the CD both ex-post (i.e., once the CD is in Insolvency) and Ex-ante. These provisions foster good Corporate Governance and deter solvent entities and market participants from engaging in activities involving diversion of funds from the CD. By annulling such transactions, the Code Aims to prevent the depletion of the Debtor’s Assets and protect the interest of Creditors and other Stakeholders. They would act as an additional source of Recovery for the Creditors.

The Code calls upon the Resolution Professional/Liquidator, as the case may be, to bring to the knowledge to the Adjudicating Authority, transactions of Preferential. Under- value, Extortionate, Fraudulent, or unlawful nature, if any, identified during the course of CIRP or Liquidation. Considering the huge sums involved in these transactions, provisions for the same, in IBC as well as on a global scale, is of utmost importance.

In ABC Bank Limited v. JIL, the NCLT Bench, dealt with a crucial aspect of Insolvency proceedings, that is, vulnerable transactions. The Resolution Professional (RP) of the Corporate Debtor filed application in relation to a mortgage of an immovable property belonging to the Corporate Debtor to secure the debt of a related party (that is, the Holding Company of the Corporate Debtor). The RP sought directions, inter alia so as to declare the transaction as Preferential, Undervalued and “Fraudulent and Wrongful” under the Code.

Facts in a decided case :

In ABC Bank Ltd. v. JIL, certain mortgages created by JIL in favour of the lenders of its Holding Company JAL.

l JIL was a special purpose Company promoted by JAL for certain design, engineering, development and construction projects. JAL held approximately 70% of the shares of JIL.

l JIL started facing financial difficulties and failed to honour its project completion deadlines. It also started defaulting on its loan payments due to its financial creditors.

One of the lenders declared JIL as a Non-Performing Account (‘‘NPA’’) first and other lenders declared it as a NPA subsequently.

l JIL Mortgaged 800 plus Acres of unencumbered land owned by it to secure the debt of JAL, vide Mortgage Deeds entered on various dates.

l The NCLT Admitted an application filed by one of JIL’s Financial Creditors, IDBI Bank Ltd., for initiating Insolvency Proceedings under the Code, and appointed an Interim Resolution Professional (‘‘IRP’’).

l The IRP examined various transactions entered into by JIL with its promoter shareholders, pursuant to his duties as a Resolution Professional.

l The IRP, consequently filed an Application before the NCLT seeking declarations that the Impugned Transactions were :

(i)Fraudulent Transactions under Section 66 of the Code;

(ii)Preferential Transactions under Section 43 of the Code; and

(iii)Undervalued Transactions under Section 45 of the Code; and sought consequent reliefs (‘‘Application’’).

In the light of the above information and with reference to the relevant provisions and decision of Adjudicating Authority (NCLT Bench) under IBC, 2016, answer the following Questions :

(viii)Based on the decided case law, answer whether the Transaction was to Defraud creditors in the above-mentioned Case ?

June 2024Q. 3(a)(i)3 marksSyllabus 2022
Show the facts common to all parts of Q. 3

(a)Suhani and Dhwani are childhood friends and were very fond of designing Indian traditional dresses. After completing their schooling, Suhani joined a fashion designing course to pursue her interest and Dhwani decided to be a fashion Model. She participated in various fashion show programs conducted by Non-Government Organisation(s) engaged in the creating awareness for cervical cancer which is spreading rapidly among Ladies in India.

After some years, in one of the fashion programmes, they met again and planned to form a private Limited Company in the name of Suhani Fashions Private Limited having a paid-up share capital of 5 Crore and became Entrepreneurs.

Suhani Fashions Pvt. Ltd. is engaged in the business of Manufacturing and Selling Ladies Suits and Sarees in Kolkata, West Bengal which is a very big market for Indian traditional dresses.

They also offered their products on online e-commerce platforms. They employed more than 100 Ladies and other staff in their workshop who were engaged in designing, cutting, tailoring and other allied works. Suhani also used to design products being sold by the company.

Both Suhani and Dhwani were Promoter Directors of the company as per the Article of Association of the company and also the subscribers to the Memorandum of Association of the company by subscribing 50% shares each in the company. Dhwani, being a fashion model, did modelling for her products in order to improve the sales of the company. The company started growing very fast and sales touched a figure of ₹ 20 crores in the very first year and in order to meet the working capital and other requirements, the company approached the bankers Beta bank and Gama Bank for a facility of ₹ 3 crores and ₹ 5 crores respectively. The Company already had taken the credit facilities with Alpha Bank and outstanding amount is ₹ 6 crores.

After the change in demand of the products and growing need of Formal dresses from the Indian traditional dresses, sales started declining and the company started facing cash crunch and made a default in paying the instalments for ₹ 2 crores which were outstanding in the name of the Alpha bank.

The Alpha bank decided to file an Insolvency Petition under Section 7 of the Insolvency and Bankruptcy Code, 2016 as a financial Creditor on 3rd January, 2024. The Corporate Insolvency Resolution Process application was admitted by the Adjudicating Authority on 25th January, 2024. Moratorium was declared and Ishann was appointed as an Interim Resolution Professional. Ishaan, Interim Resolution Professional made a public announcement and prepared a list of creditors based on the claims received. The CoC is yet to be formed.

Consider the above facts and answer the following questions :

(i)What is the date of initiation of Corporate Insolvency Resolution Process as per the provisions of Insolvency and Bankruptcy Code, 2016 ?

December 2019Q. 4(a)6 marksSyllabus 2017

(a)Naveen Kumar, a Financial Creditor filed an Insolvency Application under Section 7 of Insolvency and Bankruptcy Code, 2016 against M/s ABC Private Ltd, Corporate Debtor (Defaulter) before the National Company Law Tribunal on 1st July, 2018.

National Company Law Tribunal after satisfying that the default has occurred and the application is complete in all respects and all the related compliances have been met, admitted the application, by an order passed on 10th July, 2018 and appointed Kamal Kishore as Interim Resolution Professional (IRP).

As per the Insolvency and Bankruptcy Code, 2016, state the following :

(i)Initiation date for the Corporate Insolvency Resolution Process.

(ii)Date of commencement of Insolvency.

(iii)Date of issuance of Public Announcement.

(iv)Tenure of Interim Resolution Professional.

(v)Last Date for Creditors to file their Claims.

(vi)Calculate Time Period for the completion of the Insolvency Resolution Process by the NCLT.

December 2020Q. 1(c)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the following carefully and answer the questions given at the end:

BSC Bank filed an application for initiating Corporate Insolvency Resolution Process (CIRP) against one of its borrower company M/s Moon Storm Pvt. Ltd., in the National Company Law Tribunal (NCLT). The NCLT allowed the application and passed order for commencement of CIRP. Rohit has been appointed as Interim Resolution Professional (IRP) and moratorium was declared.

The Committee of Creditor (CoC) was constituted and Rohit was appointed as Resolution Professional by CoC. Meetings of the CoC was convened from time to time and expression of interest for Resolution Plan was invited from various parties via public notice. However, no Resolution Plan was received during the currency of 180 days period. Hence, NCLT on the recommendation of RP extended the initial time period from 180 days to 270 days. Since, no one had shown the expression of interest even during the extended period of 270 days, the CoC appointed another Resolution Professional (RP) after the expiry of 270 days.

When the matter of resolution could not be completed within the extended time.

NCLT, extended the period of CIRP by further period of 90 days after the expiry of 270 days by exercising the power conferred under Section 55 of Insolvency and Bankruptcy Code, 2016 by treating the matter as ‘Fast Track Corporate Insolvency Resolution Process’ and also determined the ‘Corporate Insolvency Resolution Process fee’ and the ‘Cost’ incurred and payable to the Resolution Professional.

Aggrieved from the said order of the NCLT, the Resolution Professional preferred appeals against the order of the NCLT. In light of the above facts, answer the following questions :

(c)Whether the NCLT is empowered to decide the resolution cost, including the resolution fee payable to the Resolution Professional.

June 2024Q. 3(a)(ii)5 marksSyllabus 2022
Show the facts common to all parts of Q. 3

(a)Suhani and Dhwani are childhood friends and were very fond of designing Indian traditional dresses. After completing their schooling, Suhani joined a fashion designing course to pursue her interest and Dhwani decided to be a fashion Model. She participated in various fashion show programs conducted by Non-Government Organisation(s) engaged in the creating awareness for cervical cancer which is spreading rapidly among Ladies in India.

After some years, in one of the fashion programmes, they met again and planned to form a private Limited Company in the name of Suhani Fashions Private Limited having a paid-up share capital of 5 Crore and became Entrepreneurs.

Suhani Fashions Pvt. Ltd. is engaged in the business of Manufacturing and Selling Ladies Suits and Sarees in Kolkata, West Bengal which is a very big market for Indian traditional dresses.

They also offered their products on online e-commerce platforms. They employed more than 100 Ladies and other staff in their workshop who were engaged in designing, cutting, tailoring and other allied works. Suhani also used to design products being sold by the company.

Both Suhani and Dhwani were Promoter Directors of the company as per the Article of Association of the company and also the subscribers to the Memorandum of Association of the company by subscribing 50% shares each in the company. Dhwani, being a fashion model, did modelling for her products in order to improve the sales of the company. The company started growing very fast and sales touched a figure of ₹ 20 crores in the very first year and in order to meet the working capital and other requirements, the company approached the bankers Beta bank and Gama Bank for a facility of ₹ 3 crores and ₹ 5 crores respectively. The Company already had taken the credit facilities with Alpha Bank and outstanding amount is ₹ 6 crores.

After the change in demand of the products and growing need of Formal dresses from the Indian traditional dresses, sales started declining and the company started facing cash crunch and made a default in paying the instalments for ₹ 2 crores which were outstanding in the name of the Alpha bank.

The Alpha bank decided to file an Insolvency Petition under Section 7 of the Insolvency and Bankruptcy Code, 2016 as a financial Creditor on 3rd January, 2024. The Corporate Insolvency Resolution Process application was admitted by the Adjudicating Authority on 25th January, 2024. Moratorium was declared and Ishann was appointed as an Interim Resolution Professional. Ishaan, Interim Resolution Professional made a public announcement and prepared a list of creditors based on the claims received. The CoC is yet to be formed.

Consider the above facts and answer the following questions :

(ii)Describe in detail the meaning of Interim finance. How the interim finance and cost incurred in raising such finance is treated in case the corporate debtor goes into liquidation ?

June 2024Q. 1(A)(i)6 marksSyllabus 2017
Show the facts common to all parts of Q. 1

(A)Mr. K Sridhar and Mr. K. Murali are the Directors of M/s S & M Engineering Enterprises Limited (SMEEL). Unfortunately, being the victims of COVID 2019 pandemic, by both the brothers and their respective families, they could not concentrate on the day-to-day affairs of the business and in the short run, the top line and the bottom line of the business went southwards and ultimately, they had to face the brunt of huge debts.

An application for initiation of Corporate Insolvency Resolution Process (CIRP) against M/s SMEEL under the Insolvency and Bankruptcy Code, 2016 (IBC, 2016) was moved by an ‘Assignee’ of an Operational Creditor for Non-payment of dues. The Adjudicating Authority admitted the application because there was no intimation of any dispute within the 10 days.

After following all the compliances prescribed under the IBC, 2016, the Adjudicating Authority passed an order to Liquidate the Corporate Debtor, on an intimation from the Resolution Professional to do so, as decided by the Committee of Creditors (CoC) by requisite voting, before the approval of the resolution plan.

The relevant information related to M/s SMEEL for the purpose of liquidation is produced as follows :

Liabilities ₹ in Assets ₹ in Lakhs

Lakhs

Capital : Fixed Assets :

Equity 300 Land and Buildings 350 Preference 200 Plant and Machinery 150 Financial Creditors : Current Assets :

Secured 250 Inventories 100 Unsecured 150 Trade Receivables 300 Operational Creditors : Other Current Assets 50 Secured 60 Cash and Cash Equivalents 100 Unsecured 70 Fictitious Assets 190 Government Dues 50 Workmen’s Dues 80 Employees Dues 80 Total 1,240 Total 1,240 Other Information :

1.Workmen’s dues represent the amounts payable for the period of 30 months preceding the liquidation commencement date.

2.Employee’s liability includes ₹ 72 Lakhs outstanding to employees for a period of 12 months, preceding the liquidation commencement date.

3.Land and Buildings would realize 110% of its book value, Plant and Machinery would realize 60% of its book value, net of any realization cost. Inventories and Trade Receivables would realize 72% of its book value.

4.The secured financial creditors worth ₹ 45 Lakhs decided to enforce their security interest in the other current assets and they could realize 80% of its value.

5.There has been a pending court case against the Company for use of child labour which could result in a penalty of approximately ₹ 30 lakhs. This has been reflected as a contingent liability only. It has been finally decided to pay ₹ 25 lakhs and settle the case.

6.Based on the amount realized and distributed, the cost of liquidation and insolvency period cost is computed to be ₹ 20 lakhs and ₹ 12 lakhs respectively.

In the light of the above inputs and with reference to the relevant provisions of the IBC, 2016, answer the following questions :

(i)Whether the decision made by the Adjudicating Authority of admitting the application filed by the ‘Assignee’ of an Operational Creditor is valid in law ?

December 2025Q. 2(a)(iii)4 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(a)Suruchi Fabrics Limited (SFL) availed term loan of ₹ 10 Crore and cash credit facility of ₹ 2 Crore from A-One Bank Ltd. Since the SFL was unable to service the loan, the Board of Directors of the company passed a resolution to initiate Corporate Insolvency Resolution Process (CIRP) and proposed the name of Aneri, an Insolvency Professional to act as Interim Resolution Professional (IRP). Apart from the credit facility from the A-One Bank, SFL have no other financial creditor. However, SFL have outstanding dues towards its operational creditors amounting to ₹ 25 Crore.

Mathew is the Company Secretary of A-One Bank. Mathew’s younger brother Thomas is the Chief Financial Officer in the SFL. Although Mathew and Thomas are brothers in relation, they are not in talking terms. Thomas joined the SFL after the loan was disbursed by the Bank.

In the first meeting of the Committee of Creditors (CoC) it was decided to change the existing IRP and to appoint Brijesh as Resolution Professional.

The Information Memorandum was prepared and expression of interest was invited for resolution plan.

Two Resolution Proposals were submitted, details of which are as under :

(i)A company named as Dinesh Textiles Private Limited, submitted the resolution plan.

Dinesh who is the Managing Director of the company holds 90% of the equity and rest 10% is in the name of his wife Neeta. Dinesh Textiles Private Limited has availed loan from another bank and his account has been classified as Non-performing Account by that bank.

(ii)Harsh, another Resolution Applicant was convicted and remained in imprisonment for two years under the provisions of the Prevention of Money Laundering Act, 2002. He was released in December 2021.

On the above background, referring relevant case laws, provisions of the Insolvency and Bankruptcy Code, 2016 and Regulations made by IBBI, answer the following questions :

(iii)What would be your answer, if Thomas, who is the CFO (Key Managerial Personnel)

in the SFL resigns before the initiation of the CIRP so as to give effect to the exclusion of ‘related party’ in terms of Section 5(24A) (b) of the Code ? Support your answer referring relevant case law.

June 2022Q. 1(b)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

DK Swan Limited (DK) was subject to Corporate Insolvency Resolution Process (CIRP) initiated by an Operational Creditor under Section 9 of Insolvency Bankruptcy Code, 2016 (IBC). During the CIRP, claims were invited by the Interim Resolution Professional (IRP). Sunrise filed its claim in Form C as a financial creditor for a sum of ₹62.60 lakh on 15th June, 2017. Thereafter, Sunrise filed a revised Form C for a sum of ₹119.11 lakh on 25th June, 2017. Sunrise had filed the revised claim Form on the basis of an alleged Memorandum of Understanding dated 17th September, 2010 executed with the Corporate Debtor, which stated that Inter Corporate Deposits (ICDs) of ₹36.55 lakh have been granted to the Corporate Debtor by Sunrise bearing interest of 24% repayable in terms of the mutual agreement between the parties.

However, Sunrise has submitted that it has granted ICDs of ₹76.00 lakh (approx.) to the Corporate Debtor between July, 2008 and February, 2012. Out of this amount, Sunrise is claiming a principal amount of ₹33.00 lakh. The balance amount of ₹53.60 lakh was credited in the account of XYZ, which is a wholly owned subsidiary of Sunrise. The total claim of Sunrise has increased to ₹119.11 lakh in 7 years on account of interest at the rate of 24% XYZ filed its claim before the IRP in Form F as a creditor other than a financial creditor or operational creditor for a sum of ₹103.90 lakh on 15th June, 2017.

Thereafter, XYZ filed a revised claim in Form C as a financial creditor for a sum of ₹119.72 lakh on 28th June, 2017. It had entered into a Development Agreement dated 6th April, 2011 with the Corporate Debtor for a sale consideration of ₹42.80 lakh to purchase development rights in a project. On 30th November, 2011, the Development Agreement was terminated and an Agreement to sell, along with a Side Letter, was executed between XYZ and the Corporate Debtor for purchase of flats. The sale consideration for the Agreement to sell was enhanced to ₹96.01 lakh from ₹42.80 lakh under the Development Agreement. XYZ paid a sum of ₹53.06 lakh as advance payment under the Agreement to Sell. This amount was adjusted out of the ICDs payable to Sunrise as noted above. The claim of XYZ is with respect to the principal amount of ₹53.06 lakh, which along with interest at the rate of 18% increased to ₹119.72 lakh in 5 years.

Phantom is also a financial creditor of the Corporate Debtor and is a part of Committee of Creditors (CoC). Its claim is based on a registered Deed of Assignment in its favour dated 2nd January, 2015, pursuant to which, Karnataka Bank Limited had assigned the non-performing assets relating to the credit facilities granted to the Corporate Debtor. The voting share of Phantom was reduced to 3.58% on account of XYZ and Sunrise being included in the CoC.

The CoC was constituted on 27th June, 2017. On 30th June, 2017, the IRP rejected the claim of Sunrise, inter alia, on the ground that the claim was not in the nature of a financial debt in terms of Section 5(8) of IBC since there was an absence of consideration for the time value of money, i.e., the period of repayment of the claimed ICDs was not stipulated The IRP also rejected the claim of XYZ on the ground that its claim as a financial creditor in Form C was filed after the expiry of the period for filing such a claim.

The IRP in his letter dated 30th June, 2017 has noted that as per the ledger provided by Sunrise, no interest was claimed on the alleged debt and no adjustment was made regarding the payment of principal or interest by the Corporate Debtor to Sunrise. It has been submitted in the written submissions filed on behalf of Sunrise and XYZ that the auditors of the Corporate Debtor had been putting a note in its balance sheets stating that the interest of 12% was not being paid to Sunrise due to a dispute.

Aggrieved by the rejection of their claim as financial creditors, XYZ and Sunrise filed applications before the National Company Law Tribunal (NCLT) to be included in the CoC. The NCLT by its order dated 5th July, 2017 allowed the applications.

However, none of the other financial creditors, such as Phantom and YES Bank, were parties to these proceedings. The NCLT observed that XYZ’s original claim in Form F was filed on time and it has only amended its claim as one under Form C.

The NCLT further observed that the amount given by Sunrise in the form of ICDs has been received as a deposit and is attracting interest as reflected in Form ‘26AS’, deducting TDS on interest. Thus, NCLT allowed Sunrise and XYZ to submit their claims as financial creditors with a direction to the IRP to consider the claims.

On 6th July, 2017, a meeting of the CoC took place which was attended by YES Bank and Phantom, and also by the newly approved financial creditors, XYZ and Sunrise. Following the meeting, YES Bank and Phantom filed applications in the NCLT for the exclusion of XYZ and Sunrise from the CoC on the ground that they are related parties.

The applications filed under Section 60(5) by Phantom also sought similar reliefs for:

(i)The removal of Sunrise and XYZ from the CoC; and

(ii)Directing the constitution of the CoC in terms of the Insolvency and Bankruptcy (Amendment) Ordinance 2018 (IBC Ordinance 2018).

As noted by NCLT, the Memorandum of Understanding dated 17th September, 2010, on the basis of which Sunrise had filed its claim in Form C before the IRP, was signed two years after the commencement of the purported transaction. The execution of the Memorandum of Understanding was sought to be explained on the basis that a formal document was created for specifying the rate of interest on the ICDs given by Sunrise to the Corporate Debtor. However, despite the creation of a formal document, the rate of interest being charged on the ICDs was 12% as mentioned in the claim before the IRP, which is half of the interest rate of 24% stipulated in the Memorandum of Understanding.

NCLT in its judgement dated 24th August, 2018 said :

(a)That Sunrise and XYZ did not qualify to be considered as financial creditors.

(b)In relation to the second issue, NCLT held that it ‘‘does not require a reply’’ in view of its above-mentioned finding. However, it took note of the first proviso to Section 21(2) of the IBC, which was introduced with effect from 6th June, 2018.

Under the first proviso, inter alia, a financial creditor who is a related party of the corporate debtor shall not have the right of representation, participation or voting in the CoC.

In appeal, the National Company Law Appellate Tribunal (NCLAT) proceeded of its decision to observe that admittedly Sunrise and XYZ are the financial creditors of the corporate debtor. Having stated so, the Appellate Tribunal proceeded to enquire into whether XYZ and Sunrise are related parties within the meaning of Section 5(24) of the IBC. Answering the above issue in the affirmative, the NCLAT held that Sunrise and XYZ are related parties of the Corporate Debtor since :

(a)XYZ was a partner of the Corporate Debtor.

(b)During the transaction period of 2009 to 2012, Sunrise led by Kunal Kumar was making substantial financial arrangements on the basis of advice provided by the Corporate Debtor led by its Management and Directors.

(c)The Corporate Debtor was acting on the directions/instructions of Kunal Kumar who, along with his family, is the majority shareholder in Sunrise, of which XYZ is a whollyowned subsidiary.

(d)On the basis of the same reasons, Kunal Kumar was also held to be a person participating in the policy-making process of the Corporate Debtor.

Aggrieved by order of NCLAT, Phantom approached the Hon’ble Supreme Court.

Referring the relevant case and relevant provisions of IBC, its Rules and Regulations made thereunder, answer the following questions :

(b)Explain based on Supreme Court’s decision, if Sunrise and XYZ are related parties of the Corporate Debtor ?

December 2021Q. 1(c)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Images Gym Ltd. was granted credit facility of ₹100 lakh under consortium arrangements.

Under the consortium, there were 5 five banks, and credit facility provided by the respective banks were as under :

A-One Bank Ltd. - ₹45 lakh, Best Bank Ltd. - ₹20 lakh, Good Deal Bank Ltd. - ₹15 lakh, Credit Arrangers Bank Ltd. - ₹10 lakh and Your Bank Ltd - ₹10 lakh Among theses the A-One Bank Ltd. was the leader.

Images Gym Ltd. was engaged in the business of manufacturing and trading of Gym exercise machines. However, due to poor demand of the products, the company could not sell out the machines and as a result the account of the company with respective banks were classified as Non-performing Advances (NPAs).

Apart from credit facility from the above banks, the company was also having outstanding dues of the creditor, which the company was not able to pay-off. The total amount outstanding of such operational creditors amounted ₹30 lakh.

The company has also not paid the salary to its employees and workers for the last 6 months and the total dues amounted to ₹10 lakh.

The leader of the consortium filed Corporate Insolvency Resolution Process (CIRP)

with the Adjudicating Authority (AA) and proposed the name of Saket Sharma, as Interim Resolution Professional (IRP).

The AA accepted the application and appointed Saket Sharma as IRP and put moratorium.

The IRP constituted the Committee of Creditors (CoC) and first meeting of the CoC was called upon.

The operational creditors objected about the constitution of the committee and asked the IRP to include operational creditors also in the CoC, which the IRP denied.

The CoC observed that IRP is not discharging his functions properly and was reluctant in calling the expression of interest from Resolution Applicant(s), so they proposed for the change of the existing IRP and appointment of the new Resolution Professional (RP) named as Anubhav Dutt.

The RP called the expression of interest from the eligible applicants and each proposal was placed before the CoC, but no consensus had arrived at. The initial period of 180 days was going to elapsed so the CoC through the RP sought extension which the Adjudicating Authority for further 90 days. The RP again called the expression of interest from other Resolutionm Applicants, but it was also not agreed upon by the CoC and after lapse of total 270 days, the Adjudicating Authority ordered for its liquidation and the present RP was appointed as Liquidator.

The Liquidator sold off the assets of the Company and realised only ₹150 lakh, whereas the outstanding dues of the various stakeholders remained as under.

Dues of ₹ in Lakhs Fee payable as Resolution Professional 10 Fee payable as Liquidator 10 Dues of the banks with interest 110 Outstanding from Operational Creditors 30 Dues of Govts. 15 Workmen’s dues 10 Employee’s salary 15 Equity shareholders 30 Total 230 Based on the above information, answer the following questions:

(c)What is the meaning of ‘Resolution Plan’ and ‘Resolution Applicant’? List out the persons not eligible to be ‘Resolution Applicant’.

June 2019Q. 612 marksSyllabus 2017

VN Pvt. Ltd. (VNPL) entered into a Sub-contract Agreement with KC Pvt. Ltd. (KCPL)

to undertake road construction works. During the course of the project, disputes and differences arose between the parties and the same were referred for an Arbitration, Arbitration Award was delivered in favour of the KCPL. VNPL challenged the Award by making an appeal under Section 34 of the Arbitration and Conciliation Act, 1996.

Meanwhile, VNPL sent a demand notice under the Insolvency and Bankruptcy Code and also initiated insolvency proceedings against KCPL. The KCPL claimed that there is a dispute and the award has been challenged and adjudication of which is pending.

NCLT as well as NCLAT admitted the insolvency petition stating that challenge of award could not be considered to be ‘existence of dispute’ under the Insolvency and Bankruptcy Code. The matter reached the Supreme Court.

What is ‘dispute’ within the meaning of the Insolvency and Bankruptcy Code, 2016 (IBC Code). Whether Award passed under Arbitration Act and challenged will be termed as existence of dispute under IBC Code. Comment with the help of decided case law.

June 2022Q. 1(a)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

DK Swan Limited (DK) was subject to Corporate Insolvency Resolution Process (CIRP) initiated by an Operational Creditor under Section 9 of Insolvency Bankruptcy Code, 2016 (IBC). During the CIRP, claims were invited by the Interim Resolution Professional (IRP). Sunrise filed its claim in Form C as a financial creditor for a sum of ₹62.60 lakh on 15th June, 2017. Thereafter, Sunrise filed a revised Form C for a sum of ₹119.11 lakh on 25th June, 2017. Sunrise had filed the revised claim Form on the basis of an alleged Memorandum of Understanding dated 17th September, 2010 executed with the Corporate Debtor, which stated that Inter Corporate Deposits (ICDs) of ₹36.55 lakh have been granted to the Corporate Debtor by Sunrise bearing interest of 24% repayable in terms of the mutual agreement between the parties.

However, Sunrise has submitted that it has granted ICDs of ₹76.00 lakh (approx.) to the Corporate Debtor between July, 2008 and February, 2012. Out of this amount, Sunrise is claiming a principal amount of ₹33.00 lakh. The balance amount of ₹53.60 lakh was credited in the account of XYZ, which is a wholly owned subsidiary of Sunrise. The total claim of Sunrise has increased to ₹119.11 lakh in 7 years on account of interest at the rate of 24% XYZ filed its claim before the IRP in Form F as a creditor other than a financial creditor or operational creditor for a sum of ₹103.90 lakh on 15th June, 2017.

Thereafter, XYZ filed a revised claim in Form C as a financial creditor for a sum of ₹119.72 lakh on 28th June, 2017. It had entered into a Development Agreement dated 6th April, 2011 with the Corporate Debtor for a sale consideration of ₹42.80 lakh to purchase development rights in a project. On 30th November, 2011, the Development Agreement was terminated and an Agreement to sell, along with a Side Letter, was executed between XYZ and the Corporate Debtor for purchase of flats. The sale consideration for the Agreement to sell was enhanced to ₹96.01 lakh from ₹42.80 lakh under the Development Agreement. XYZ paid a sum of ₹53.06 lakh as advance payment under the Agreement to Sell. This amount was adjusted out of the ICDs payable to Sunrise as noted above. The claim of XYZ is with respect to the principal amount of ₹53.06 lakh, which along with interest at the rate of 18% increased to ₹119.72 lakh in 5 years.

Phantom is also a financial creditor of the Corporate Debtor and is a part of Committee of Creditors (CoC). Its claim is based on a registered Deed of Assignment in its favour dated 2nd January, 2015, pursuant to which, Karnataka Bank Limited had assigned the non-performing assets relating to the credit facilities granted to the Corporate Debtor. The voting share of Phantom was reduced to 3.58% on account of XYZ and Sunrise being included in the CoC.

The CoC was constituted on 27th June, 2017. On 30th June, 2017, the IRP rejected the claim of Sunrise, inter alia, on the ground that the claim was not in the nature of a financial debt in terms of Section 5(8) of IBC since there was an absence of consideration for the time value of money, i.e., the period of repayment of the claimed ICDs was not stipulated The IRP also rejected the claim of XYZ on the ground that its claim as a financial creditor in Form C was filed after the expiry of the period for filing such a claim.

The IRP in his letter dated 30th June, 2017 has noted that as per the ledger provided by Sunrise, no interest was claimed on the alleged debt and no adjustment was made regarding the payment of principal or interest by the Corporate Debtor to Sunrise. It has been submitted in the written submissions filed on behalf of Sunrise and XYZ that the auditors of the Corporate Debtor had been putting a note in its balance sheets stating that the interest of 12% was not being paid to Sunrise due to a dispute.

Aggrieved by the rejection of their claim as financial creditors, XYZ and Sunrise filed applications before the National Company Law Tribunal (NCLT) to be included in the CoC. The NCLT by its order dated 5th July, 2017 allowed the applications.

However, none of the other financial creditors, such as Phantom and YES Bank, were parties to these proceedings. The NCLT observed that XYZ’s original claim in Form F was filed on time and it has only amended its claim as one under Form C.

The NCLT further observed that the amount given by Sunrise in the form of ICDs has been received as a deposit and is attracting interest as reflected in Form ‘26AS’, deducting TDS on interest. Thus, NCLT allowed Sunrise and XYZ to submit their claims as financial creditors with a direction to the IRP to consider the claims.

On 6th July, 2017, a meeting of the CoC took place which was attended by YES Bank and Phantom, and also by the newly approved financial creditors, XYZ and Sunrise. Following the meeting, YES Bank and Phantom filed applications in the NCLT for the exclusion of XYZ and Sunrise from the CoC on the ground that they are related parties.

The applications filed under Section 60(5) by Phantom also sought similar reliefs for:

(i)The removal of Sunrise and XYZ from the CoC; and

(ii)Directing the constitution of the CoC in terms of the Insolvency and Bankruptcy (Amendment) Ordinance 2018 (IBC Ordinance 2018).

As noted by NCLT, the Memorandum of Understanding dated 17th September, 2010, on the basis of which Sunrise had filed its claim in Form C before the IRP, was signed two years after the commencement of the purported transaction. The execution of the Memorandum of Understanding was sought to be explained on the basis that a formal document was created for specifying the rate of interest on the ICDs given by Sunrise to the Corporate Debtor. However, despite the creation of a formal document, the rate of interest being charged on the ICDs was 12% as mentioned in the claim before the IRP, which is half of the interest rate of 24% stipulated in the Memorandum of Understanding.

NCLT in its judgement dated 24th August, 2018 said :

(a)That Sunrise and XYZ did not qualify to be considered as financial creditors.

(b)In relation to the second issue, NCLT held that it ‘‘does not require a reply’’ in view of its above-mentioned finding. However, it took note of the first proviso to Section 21(2) of the IBC, which was introduced with effect from 6th June, 2018.

Under the first proviso, inter alia, a financial creditor who is a related party of the corporate debtor shall not have the right of representation, participation or voting in the CoC.

In appeal, the National Company Law Appellate Tribunal (NCLAT) proceeded of its decision to observe that admittedly Sunrise and XYZ are the financial creditors of the corporate debtor. Having stated so, the Appellate Tribunal proceeded to enquire into whether XYZ and Sunrise are related parties within the meaning of Section 5(24) of the IBC. Answering the above issue in the affirmative, the NCLAT held that Sunrise and XYZ are related parties of the Corporate Debtor since :

(a)XYZ was a partner of the Corporate Debtor.

(b)During the transaction period of 2009 to 2012, Sunrise led by Kunal Kumar was making substantial financial arrangements on the basis of advice provided by the Corporate Debtor led by its Management and Directors.

(c)The Corporate Debtor was acting on the directions/instructions of Kunal Kumar who, along with his family, is the majority shareholder in Sunrise, of which XYZ is a whollyowned subsidiary.

(d)On the basis of the same reasons, Kunal Kumar was also held to be a person participating in the policy-making process of the Corporate Debtor.

Aggrieved by order of NCLAT, Phantom approached the Hon’ble Supreme Court.

Referring the relevant case and relevant provisions of IBC, its Rules and Regulations made thereunder, answer the following questions :

(a)Explain whether Sunrise and XYZ are financial creditors of the Corporate Debtor?

December 2025Q. 1(c)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow :

Arya is a Practicing Company Secretary and Insolvency Professional. She renders Corporate Advisory Services and very often delivers guest lectures in Financial Institutions, Banks and Management and Law Colleges on the topics of Corporate Insolvency, Restructuring and Fund Raising.

R. K. Institute of Management and Technology (RK-IMT) is a reputed management college in Jaipur.

RK-IMT was established in the year 2000 and this year the college in completing its glorious 25 years.

The RK-IMT planned for its Silver Jubilee and organized a whole week of celebrations. During this week the college organized various programs / activities viz: Sports Day, Debate Competition, Cultural Evening, Seminars, Workshop etc.

Arya was invited to address a seminar on the topic of Corporate Insolvency. Arya explained the objectives and purposes of the Insolvency and Bankruptcy Code, 2016 (IBC) and touched the key points relating to Financial Creditor, Operational Creditor, Corporate Debtor, Default, Initiation of Corporate Insolvency, Constitution of Committee of Creditors, and Insolvency Resolution Process Period etc. After delivering a thought-provoking lecture, Arya invited the audiences to raise queries on the topic.

Vedika, a student of the college, was curious to know more about Insolvency Law. She exclaimed to know that the IBC is a totally new concept and prior to this enactment whether there was any such law on insolvency existed in India. Arya clarified the position.

Reyansh, an Associate Professor of the college, was curious to know that whether IBC is an effective recovery tool and the lending institution can effectively exercise its control over the debtor through the Resolution Professional. Arya again clarified the doubts of Reyansh referring the objectives and purpose of IBC.

As a lecturer of the Institute, Rohil shared his own experience, he booked a 2-BHK Flat in Swarnim Galaxy, a building project of Swarnim Builders Limited (Swarnim Builders), and paid upto 90% of the purchase price to the builder, Swarnim Builders, on various stages. Ten per cent (10%) of the purchase price was to be paid at the time of taking the possession which was due in December,

2023. However, the possession of the flat was not given by the Builder to him. Rohil is not the only allottee but all the other allottees who had booked the flat in the Swarnim Galaxy were not given the possession and the Builder was taking excuses by narrating false reasons. Rohil narrated the whole story before the Arya and requested if she could help him. Arya asked Rohil to let her know the details of the project and relevant information to proceed in the case.

Rohil meets Arya at her office and submits her the details of the project available with him. Arya studies about the project and also checks the financial statements of Swarnim Builders, which are filed with Registrar of Companies. On scrutiny of financial statements, Arya found out that Rishabh Suppliers Limited (RSL), one of the major suppliers of Swarnim Builders had supplied the construction materials to Swarnim Builders amounting to ₹ 15 crore. On scrutiny of RSL’s financial statements, Arya has found out that RSL has assigned its book debts at a discount of 3% in favour of the Moon star Financiers Limited (MFL) a NBFC Company.

Based on the above factual background, answer the following questions :

(c)Rohil had booked a flat from Swarnim Builders but the possession was not given to him on the due date. What shall be the status of Rohil in this case and whether he can initiate the insolvency proceedings against the Swarnim Builders ? Discuss the matter with decided case law.

December 2025Q. 4(a)5 marksSyllabus 2022

(a)PQR Private Limited (PQR) has requested the Managing Director of MNC Private Limited (MNC), who is good friend of PQ, who is Managing Director of PQR to invest in the shares of PQR. On the request of PQR, the funds were infused by the MNC, as share application money. In return, the PQR had allotted 3000 equity shares for an amount of ₹ 6.97 Lakh in the share capital of the PQR to the MNC.

Subsequently, another sum of ₹ l.32 Crore was paid as share application money by the MNC for allotment of equity shares as share application money. No shares were however allotted by the PQR but ₹ 40 Lakh was refunded by the PQR from the said share application money.

The PQR was not able to refund the balance amount of ₹ 92 Lakh. The PQR not being in a position to refund the balance amount of share application money purportedly on account of liquidity crunch, instead agreed to allot shares for the balance amount subject to the MNC providing additional funds to the PQR. The MNC thereafter provided additional funds of ₹ 79.60 Lakh which were paid in several instalments. Since neither the shares were allotted not the share application money was refunded, the MNC sent a Demand Notice to the PQR for repayment of the share application money. Since the Corporate Debtors failed to repay the amount, the MNC filed an application under Section 7 of the Code before the Adjudicating Authority.

Whether the share application money which was deposited with the PQR by the MNC fell in the category of Section 5(8) of the Insolvency and Bankruptcy Code, 2016.

December 2024Q. 2(b)(iii)7 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(b)Jayparan (“Jay” in short), has paid a sum of ₹ 4 crore to RD Developers Private Limited (hereinafter referred as ‘Corporate Debtor’) who was engaged in real estate business. This sum of ₹ 4 crore was paid in 2010 as earnest money against advance sale consideration for booking of a flat. Since there was no progress in the said project until 2014, Jay sought refund of the earnest money following which the Corporate Debtor assured to return the same with interest @ 12% per annum.

Since then, the sum of ₹ 4 crore was mutually treated as unsecured loan and reflected accordingly in the books of the account of the Corporate Debtor. Interest thereon was paid by the Corporate Debtor and TDS was also deducted thereon for which confirmation of books of accounts was periodically sought from Jay. Thus, it was contended that the Corporate Debtor by his own conduct changed the status of the home-buyer to a Financial Creditor.

The Corporate Debtor paid regular interest till FY 2016-17. On the grounds of liquidity and financial crunch, he sought waiver of interest from Jay which request was, however declined.

It is the contention of Mr. Jay that the Corporate Debtor thereafter, defaulted in making interest payment since 1st October, 2017 and continued to default from FY 2017-18 until FY 2020-21 except for part repayment in 2018. It is further submitted that on the demise of Mr.

Jay during October 2018, the loan amount was transferred to the name of his wife, Kushma Jayparan which stands confirmed from the confirmation of account for FY 2019-20 signed by the Directors of the Corporate Debtor.

On account of non-payment of debt, a letter dated 1st February, 2021 was sent by Kushma Jayparan to the Corporate Debtor demanding a sum of ₹ 6.20 crores which included principal amount of ₹ 4.09 crores and ₹ 2.11 crores as interest. Since the amount remained outstanding, on behalf of Jay, his wife filed an application under Section 7 of the IBC on 6th October, 2021 for initiating a Corporate Insolvency Resolution Process (CIRP) against the Corporate Debtor for the default committed.

The learned Counsel of the Corporate Debtor contended that there was no agreement between Jay and the Corporate Debtor with respect to the amount advanced by him and further, the amount paid by Jay is as an Advance amount for buying a flat under development of the Corporate Debtor. Hence, Jay is only a home buyer and not a Financial Creditor of unsecured loans. It is also the contention of the Corporate Debtor that the investment was made by the Jay to receive returns on investment from the Corporate Debtor. Hence, the sum advanced was in the nature of speculative investment and cannot be treated as a financial debt.

The Adjudicating Authority viewed that as no time period was stipulated in the demand notice, it may be held that no default had occurred and also this date fell in the prohibited period under Section 10A of the IBC, 2016. Thus, the Adjudicating Authority held that in both these circumstances, Section 7 application was non-maintainable. Aggrieved with the findings of the Adjudicating Authority, the wife of Jay preferred an appeal before the National Company Law Appellate Tribunal.

Referring to the relevant case laws and the applicable provisions of the IBC, 2016 and the Regulations made thereunder, answer the following questions :

(iii)Referring to the relevant provisions of IBC, 2016 vis-à-vis ‘financial debt’, analyse :

(i)Whether home buyers are a separate class of financial creditors unlike other unsecured financial creditors ?

(ii)Also examine whether any amount raised from an allottee under a real estate project shall be deemed to be an amount having the commercial effect of a borrowing ?

(iii)What is the requisite minimum threshold of allottees eligible to initiate insolvency proceedings against defaulting builders/real estate companies ?

December 2024Q. 1(b)(ii)1 markSyllabus 2022
Show the facts common to all parts of Q. 1

Background CIL Limited (hereinafter referred as ‘CIL’ or Corporate Debtor) is a manufacturer of precision engineering and automobile components, namely crankshafts for tractors, HCVs, LCVs as well as two-wheelers, as also connecting rods, steering knuckles and hubs. IBD Bank, one of the Financial Creditors of the Company has initiated a Corporate Insolvency Resolution Process (CIRP).

Appointment of Resolution Professional The National Company Law Tribunal (NCLT) has appointed Mr. RL as the Interim Resolution Professional and subsequently, he was confirmed as the Resolution Professional (hereinafter referred to as the “RP”) by the NCLT.

Receipt and Admission of Claims The RP received a claim for ₹ 1,850 crores and after verification of claims, the RP admitted a claim of ₹ 1,780 crores and the balance of claims was rejected by the RP.

Break-up of Claims Admitted Out of admitted claim of ₹ 1,780 crores, the Financial Creditors claim was ₹ 1,620 crores, Workmen Wages pending for a period of last 24 months is ₹ 18 crores, Employees pending claims for a period of last 12 months is 15 crores, Claims by Operational Creditors and Statutory Authorities is ₹ 127 crores.

Going forward, the RP published an “Expression of Interest.” Subsequently, it was revised on three different dates.

The Resolution Applicant (hereinafter referred to as the ‘RA’) submitted its first Resolution Plan during April, 2019 providing to pay ₹ 75 crores to all the stakeholders including ₹ 62 crores to Financial Creditors (FCs).

After a series of negotiations, the RA submitted an addendum to the Resolution Plan during May 2019 by which the RA raised the payment to Financial Creditors to ₹ 74 crores and at the request of the Committee of Creditors (hereinafter referred to as the “CoC”. Thereafter, once again, the RA submitted a Revised Plan during June, 2019 wherein the total pay- out was ₹ 86 crores and the Financial Creditors were to be paid ₹ 75 crores.

Further, the statutory requirement of the RP involving two approved valuers for giving reports, apropos fair market value and liquidation value was duly complied with and the figures in both reports were not at great variance.

The final Resolution Plan was submitted on August, 2019, in which the financial proposal/ total pay-out was increased to ₹ 130 crores and the Financial Creditors were to get upfront payment of ₹ 81 crores towards final settlement.

The total estimated liquidation cost and fee to the Resolution Professional and other connected/ incidental expenses was ₹ 3.30 crores.

Final Approval of the Resolution Plan by CoC.

This final Resolution Plan submitted by the Resolution Applicant during August, 2019 was finally approved by the CoC by a majority of 88% votes. In terms of such approval of the Resolution Plan, the RP moved Approval Application under Sections 30(6) and 31 of the IBC, 2016 seeking approval of the Resolution Plan before the Adjudicating Authority-NCLT.

In terms of the Resolution Plan, for which approval was being sought, the Corporate Debtor would be allowed the benefit of carry forward of its losses in terms of Section 79 of the Income Tax Act, 1961.

The NCLT, vide its order, by which the approval of the Resolution Plan was kept in abeyance, directed the Official Liquidator (OL) to provide the exact figures/value of assets. The same was carried in appeal under Section 61 of the Code by the RA before the NCLAT which passed the impugned Judgment on 19th January, 2022, dismissing the appeal, thereby upholding the order of the NCLT.

It is imperative to note that the moot question involved is the extent of the jurisdiction and powers of the Adjudicating Authority in the background of the admitted and undisputed factual position that no objection was raised by any quarter with regard to any deficiency/irregularity, either by the RP or the Appellant or the CoC in finally approving the resolution plan which was sent to the Adjudicating Authority–NCLT for approval. Further, the NCLT and the NCLAT did not fully recognise that under the Resolution Plan, the Corporate Debtor was set to be revived and not liquidated.

In view of the above, the RA filed an appeal before the Supreme Court.

In the light of the above inputs and referring to the applicable provisions of the IBC Code, 2016 and the Regulations framed thereunder together with the decided case laws, answer the following questions :

(ii)What would be the claim that would be paid out to Workmen and the Employees ?

December 2024Q. 1(i)6 marksSyllabus 2017
Show the facts common to all parts of Q. 1

COB Bank filed an application under Section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC) for initiating a Corporate Insolvency Resolution Process (CIRP) against the Corporate Debtor, M/s. Gupta Infra Private Limited (GIPL). The said application was admitted by the Adjudicating Authority (AA) during October, 2018 and a Resolution Professional (RP) was appointed as an Interim Resolution Professional (IRP).

Following is the financial position of GIPL as on the date of commencement of the CIRP :

Liabilities Amount in Assets Amount in ₹

₹ Crores Crores

Share Capital – Equity 100.00 Fixed Assets – Land and 115.00

Building

Share Capital – Redeemable 75.00 Fixed Assets – Plant and 165.00 Preference Shares Machinery Share Capital – Convertible 25.00 Other Fixed Assets 70.00 Preference Shares Debentures (Unsecured fully 50.00 Investments in Subsidiaries 50.00 convertible)

Long Term Borrowings – Fully 300.00 Inventories 150.00 Secured Short Term Borrowings – Unsecured 75.00 Receivables 110.00 Loan from Related Parties 25.00 Cash and Bank Balances 15.00 Payables 65.00 Other Current Assets 25.00 Provisions 35.00 Accumulated Losses 100.00 Deferred Tax Liabilities 15.00 Other Current Liabilities 35.00 Total Liabilities 800.00 Total Assets 800.00 Other Additional information provided by the Corporate Debtor :

[Amounts stated in the table above can be treated as claims made by each of the parties in their respective category].

Other Current Liabilities include :

₹ In Crores

Workmen Wages Payable for 36 months 9.00 Salary Payable for 20 months 100.00 PF Liabilities 3.80 Sales Tax/Commercial Taxes Due * 4.80 Other Statutory Dues 2.40

* On the sales tax and commercial taxes due, the Commercial Tax Authorities have already attached one of the immovable properties of the Corporate Debtor valued at ₹ 3.50 crores.

Fixed Assets includes buildings occupied on long term lease for a period of 75 years obtained from the State Industrial Development Authority (SIDA) for ₹ 5 Crores. SIDA has also submitted their claim with the RP stating that their premium amount along with interest and penal interest is due for since last 7 years. SIDA has filed its claim as a Financial Creditor. Whereas, the Resolution Professional has requested SIDA to submit its claim as an Operational Creditor. (This amount is included in Other Current Liabilities).

Further, it was informed by the Resolution Professional that the Corporate Debtor, M/s. Gupta Infra Private Limited, who initiated a CIRP against one of its Operational Creditor, namely C-Digital Arts Private Ltd for ₹ 6 Crores and going forward, the National Company Law Tribunal (NCLT) has already ordered for initiation of Corporate Insolvency Resolution Process (CIRP). However, one of the suspended Director on the Board of C-Digital Arts Private Limited filed an appeal before the National Company Law Appellate Tribunal (NCLAT) stating that there was no notice given as required under Section 8 of the Insolvency and Bankruptcy Code, 2016 read with Rule 5 of the insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016 which entails that for initiation of insolvency resolution process by an Operational Creditor, a demand notice has to be served by the unpaid Operational Debtor on the Corporate Creditor. Nevertheless, the aforesaid suspended director he has not denied the debts due. This matter is pending before NCLAT for disposal.

Investments includes investment in Foreign Subsidiary of ₹ 30 Crores and in an Indian Subsidiary of ₹ 18 Crores and Investment in shares amounting to ₹ 2 Crores in another company incorporated and registered with charitable objects and not for profit.

Inventories and Receivables realisable only for 80% of its value.

Loan from related parties is from wife and son of one Director of GIPL.

Other Current Assets includes ₹ 10 Crores paid to National Highway Authority of India (NHAI) towards a bid amount for a road project.

Other Current Assets includes ₹ 2 Crores of assets of third party held under Trust. Machinery, the carrying value of which is ₹ 1.50 crores belonging to an Indian Subsidiary is lying in one of the Units of the Corporate Debtor.

A Machinery which was acquired for dispatching to the Foreign Subsidiary is also lying in the factory premises of the Corporate Debtor having a carrying value of ₹ 3 crores.

Cranes worth ₹ 5 Crores belonging to a proprietorship concern of one of the Director is also lying the Factory premises of the Corporate Debtor.

CIRP costs payable including all expenses is ₹ 2 Crores.

The Security Interest charged for COB Bank is 91.25% and SID Bank is 8.75%. (both the financial creditors have not relinquished their security interest).

During the CIRP, in one of the Meeting of the ‘Committee of Creditors’ (CoC), Resolution Plans were discussed. Revised Resolution Plans were submitted by the prospective Resolution Applicants.

Resolution Plan was put to e-Vote and by majority of 94.79%, the Resolution Plan of ‘GIPL’ was approved.

The Resolution plan proposes for utilisation of all assets including the assets under lease. Further, the Resolution Professional has sent a letter to the Commercial Taxes Authorities to release the property attached by them and on the contrary, the Authorities informed that the Department will get their portion as per the proposed Resolution Plan.

One of the Financial Creditor (SID Bank) sent an objection with respect to the distribution of the proceeds of the resolution plan under the Resolution Plan.

SID Bank also filed seeking direction to the Resolution Professional to distribute the proceeds of the Resolution Plan and made the following prayers :

“It is most respectfully prayed that :

1.The present application may kindly be allowed and the directions be issued to the Respondent No. 1 to modify/clarify the distribution to dissenting members as per the Resolution Plan and distribute the proceeds of the resolution plan to the Applicant SID Bank, for an amount of ₹ 8.97 Crores in priority in accordance with provisions of IBC, 2016 in the interest of justice and equity.

2.Interim stay be granted on distribution of the resolution plan amount by the Resolution Professional to the Committee of Creditors till the present application is decided.”

The case of the Appellant, namely SID Bank in the Application was that, as per the security interest of the Appellant, the Appellant is entitled to 8.75% i.e. the amount of ₹ 8.97 Crores and as per voting share as approved by the CoC, the Appellant is entitled to 5.21% i.e., ₹ 5.34 Crores. The case of the Appellant SID Bank set up in the Application is that he is entitled for his distribution of plan amount as per value of the security interest of the Appellant.

The Application was objected by the Resolution Professional. The Adjudicating Authority, by its Order, upheld the decision of the CoC for distribution of proceeds of the Resolution Plan as per the voting share. The Appellant, aggrieved by the said Order, has come up with the Appeal to the National Company Law Appellate Tribunal (NCLAT).

In the light of the above case study inputs and referring to the decisions of applicable case laws with reasons and the provisions of Insolvency and Bankruptcy Code, 2016 (IBC, 2016) and the Regulations made thereunder, answer the following questions :

(i)Explain in the light of the decided case laws, whether the claim made by SID Bank regarding distribution proceeds of the resolution plan based on the security interest is correct and whether SID Bank will succeed in its appeal with NCLAT ?

December 2020Q. 1(d)10 marksSyllabus 2017Law changed
Law changed after this attempt: Answer compares Fast Track CIRP (S.55-58) with CIRP; Fast Track CIRP was abolished w.e.f. 26.05.2026 by the IBC (Amendment) Act, 2026. The answer below reflects the law as it stood for December 2020.
Show the facts common to all parts of Q. 1

Read the following carefully and answer the questions given at the end:

BSC Bank filed an application for initiating Corporate Insolvency Resolution Process (CIRP) against one of its borrower company M/s Moon Storm Pvt. Ltd., in the National Company Law Tribunal (NCLT). The NCLT allowed the application and passed order for commencement of CIRP. Rohit has been appointed as Interim Resolution Professional (IRP) and moratorium was declared.

The Committee of Creditor (CoC) was constituted and Rohit was appointed as Resolution Professional by CoC. Meetings of the CoC was convened from time to time and expression of interest for Resolution Plan was invited from various parties via public notice. However, no Resolution Plan was received during the currency of 180 days period. Hence, NCLT on the recommendation of RP extended the initial time period from 180 days to 270 days. Since, no one had shown the expression of interest even during the extended period of 270 days, the CoC appointed another Resolution Professional (RP) after the expiry of 270 days.

When the matter of resolution could not be completed within the extended time.

NCLT, extended the period of CIRP by further period of 90 days after the expiry of 270 days by exercising the power conferred under Section 55 of Insolvency and Bankruptcy Code, 2016 by treating the matter as ‘Fast Track Corporate Insolvency Resolution Process’ and also determined the ‘Corporate Insolvency Resolution Process fee’ and the ‘Cost’ incurred and payable to the Resolution Professional.

Aggrieved from the said order of the NCLT, the Resolution Professional preferred appeals against the order of the NCLT. In light of the above facts, answer the following questions :

(d)How is the fast track process different from the Corporate Insolvency Resolution Process under Chapter II of Part II of the Insolvency and Bankruptcy Code,

2016.

June 2026Q. 1(a)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow:

(I)Background:

Phoenix Asset Management Ltd. (Phoenix) is an asset reconstruction company registered under the applicable laws of India. It acquired, by way of an assignment agreement, the outstanding receivables owed by Meridian Hospitality Ltd. (Meridian), a company engaged in the hotel and hospitality business from a consortium of four public sector banks. The assignment took place in January 2009.

Meridian had originally borrowed ₹ 180 crores from the consortium in March 2003 under a term loan agreement. The funds were used for the renovation and expansion of its flagship hotel property. Repayments were irregular from the outset, and by November 2008, the consortium banks collectively classified Meridian’s loan account as a Non-Performing Asset (NPA). Shortly thereafter, the consortium assigned all outstanding receivables to Phoenix.

The shareholding of Meridian was held equally by two promoter entities, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd. each holding a 50% stake. Mr. Rajiv Bhatia served as the Chairman and Managing Director of Meridian as well as of both promoter companies.

(II)Settlement attempts and acknowledgments:

In March 2010, well within three years of the NPA declaration, Meridian wrote to Phoenix proposing a one-time settlement of the outstanding dues. In this letter, Meridian acknowledged that the aggregate outstanding liability, inclusive of principal and interest, stood at ₹ 195 crore as on 31 December 2009. It offered an upfront payment of ₹ 15 crores and committed to clearing the balance in instalments over 18 months.

A formal Settlement Agreement was executed between the parties on 15 April 2010.

Under this agreement, Meridian acknowledged its total liability of ₹ 195 crores, agreed to pay interest at 20% per annum compounded monthly, made an upfront payment of ₹ 15 crores, and committed to clearing the balance by 30 September 2011. Between 2010 and 2013, Meridian made further part payments totalling approximately ₹ 48 crores through various demand drafts and cheques.

However, Meridian repeatedly sought extensions of time to pay the balance. In June 2012, it acknowledged an outstanding liability of ₹ 241 crore (principal and interest combined) and sought extension until March 2013. In September 2013, Phoenix revoked the Settlement Agreement after Meridian defaulted once again.

From the financial year 2009-10 onwards, Meridian’s audited annual financial statements consistently reflected the amounts owed to Phoenix as a liability. However, beginning from the financial statements for the year 2014-15, the notes to the accounts contained a qualification. While the principal amount owed to Phoenix was shown as a liability in the balance sheet, the notes stated that the Settlement Agreement had been revoked by Phoenix and that Meridian had been legally advised the applicable interest rate could not exceed 13% per annum, not the 20% claimed by Phoenix. The notes further stated that the question of the correct rate of interest was pending adjudication before the Debt Recovery Tribunal (DRT).

Phoenix issued a notice under the SARFAESI Act in October 2013 and took symbolic possession of the hotel property in February 2014. Phoenix also invoked the personal guarantee of Mr. Rajiv Bhatia in May 2015.

(III)The IBC, 2016 application and proceedings:

On 10 April 2018, Phoenix filed an application under Section 7(2) of the Insolvency and Bankruptcy Code, 2016 (IBC) before the National Company Law Tribunal (NCLT), seeking initiation of the Corporate Insolvency Resolution Process (CIRP) against Meridian. In its application, Phoenix claimed a principal amount of ₹42 crore and interest of ₹ 178 crores calculated at 20% per annum, bringing the total claim to approximately ₹ 220 crores.

Meridian filed a miscellaneous application before the NCLT seeking dismissal of the petition on the ground that it was barred by limitation. Meridian argued that the NPA was declared in November 2008, that the limitation period of three years expired in November 2011, and that the IBC application filed in April 2018 was hopelessly late by nearly seven years. Meridian further contended that the financial statements contained a clear dispute as to the rate of interest and could not, therefore, be read as an unequivocal acknowledgment of liability sufficient to extend limitation.

Phoenix countered that its application was well within time. It relied on the audited balance sheet of Meridian for the financial year 2014-15, signed by Meridian’s directors on 12 September 2015, which reflected Phoenix as a creditor and acknowledged Meridian’s outstanding financial liability. Phoenix argued that this acknowledgment, made before the original limitation period had expired, created a fresh three-year limitation period running from 12 September 2015 to 12 September 2018. Since the application was filed on 10 April 2018, it was within this extended period.

Phoenix also argued that regardless of the caveats in the notes to accounts concerning the interest rate, the balance sheet clearly showed the jural relationship of debtor and creditor between Meridian and Phoenix, and the existence of financial liability. A dispute about the rate of interest was a dispute about quantum, not about the existence of the debt itself. Moreover, even if the parts payments made by Meridian were to be considered, they would first be appropriated towards interest and then towards principal, meaning a substantial principal remained outstanding.

The promoter companies, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd., separately filed an appeal challenging the admission of the CIRP, arguing there was no subsisting financial debt and that the application was time-barred.

The NCLT rejected Meridian’s limitation objection and admitted the application, appointing an Interim Resolution Professional. The matter was then appealed to the NCLAT, which set aside the NCLT’s order, holding that the financial statements with caveated notes could not amount to an unequivocal acknowledgment under Section 18 of the Limitation Act and that the application was therefore barred by limitation.

Phoenix has now filed an appeal before the Supreme Court of India challenging the NCLAT’s order.

Required:

(a)Meridian argues that the IBC application is barred by limitation because the NPA was declared in November 2008 and the application was filed only in April 2018, nearly ten years later. Is this argument correct? What is the prescribed period of limitation for a Section 7 IBC application, and from which date does it begin to run?

June 2026Q. 1(c)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow:

(I)Background:

Phoenix Asset Management Ltd. (Phoenix) is an asset reconstruction company registered under the applicable laws of India. It acquired, by way of an assignment agreement, the outstanding receivables owed by Meridian Hospitality Ltd. (Meridian), a company engaged in the hotel and hospitality business from a consortium of four public sector banks. The assignment took place in January 2009.

Meridian had originally borrowed ₹ 180 crores from the consortium in March 2003 under a term loan agreement. The funds were used for the renovation and expansion of its flagship hotel property. Repayments were irregular from the outset, and by November 2008, the consortium banks collectively classified Meridian’s loan account as a Non-Performing Asset (NPA). Shortly thereafter, the consortium assigned all outstanding receivables to Phoenix.

The shareholding of Meridian was held equally by two promoter entities, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd. each holding a 50% stake. Mr. Rajiv Bhatia served as the Chairman and Managing Director of Meridian as well as of both promoter companies.

(II)Settlement attempts and acknowledgments:

In March 2010, well within three years of the NPA declaration, Meridian wrote to Phoenix proposing a one-time settlement of the outstanding dues. In this letter, Meridian acknowledged that the aggregate outstanding liability, inclusive of principal and interest, stood at ₹ 195 crore as on 31 December 2009. It offered an upfront payment of ₹ 15 crores and committed to clearing the balance in instalments over 18 months.

A formal Settlement Agreement was executed between the parties on 15 April 2010.

Under this agreement, Meridian acknowledged its total liability of ₹ 195 crores, agreed to pay interest at 20% per annum compounded monthly, made an upfront payment of ₹ 15 crores, and committed to clearing the balance by 30 September 2011. Between 2010 and 2013, Meridian made further part payments totalling approximately ₹ 48 crores through various demand drafts and cheques.

However, Meridian repeatedly sought extensions of time to pay the balance. In June 2012, it acknowledged an outstanding liability of ₹ 241 crore (principal and interest combined) and sought extension until March 2013. In September 2013, Phoenix revoked the Settlement Agreement after Meridian defaulted once again.

From the financial year 2009-10 onwards, Meridian’s audited annual financial statements consistently reflected the amounts owed to Phoenix as a liability. However, beginning from the financial statements for the year 2014-15, the notes to the accounts contained a qualification. While the principal amount owed to Phoenix was shown as a liability in the balance sheet, the notes stated that the Settlement Agreement had been revoked by Phoenix and that Meridian had been legally advised the applicable interest rate could not exceed 13% per annum, not the 20% claimed by Phoenix. The notes further stated that the question of the correct rate of interest was pending adjudication before the Debt Recovery Tribunal (DRT).

Phoenix issued a notice under the SARFAESI Act in October 2013 and took symbolic possession of the hotel property in February 2014. Phoenix also invoked the personal guarantee of Mr. Rajiv Bhatia in May 2015.

(III)The IBC, 2016 application and proceedings:

On 10 April 2018, Phoenix filed an application under Section 7(2) of the Insolvency and Bankruptcy Code, 2016 (IBC) before the National Company Law Tribunal (NCLT), seeking initiation of the Corporate Insolvency Resolution Process (CIRP) against Meridian. In its application, Phoenix claimed a principal amount of ₹42 crore and interest of ₹ 178 crores calculated at 20% per annum, bringing the total claim to approximately ₹ 220 crores.

Meridian filed a miscellaneous application before the NCLT seeking dismissal of the petition on the ground that it was barred by limitation. Meridian argued that the NPA was declared in November 2008, that the limitation period of three years expired in November 2011, and that the IBC application filed in April 2018 was hopelessly late by nearly seven years. Meridian further contended that the financial statements contained a clear dispute as to the rate of interest and could not, therefore, be read as an unequivocal acknowledgment of liability sufficient to extend limitation.

Phoenix countered that its application was well within time. It relied on the audited balance sheet of Meridian for the financial year 2014-15, signed by Meridian’s directors on 12 September 2015, which reflected Phoenix as a creditor and acknowledged Meridian’s outstanding financial liability. Phoenix argued that this acknowledgment, made before the original limitation period had expired, created a fresh three-year limitation period running from 12 September 2015 to 12 September 2018. Since the application was filed on 10 April 2018, it was within this extended period.

Phoenix also argued that regardless of the caveats in the notes to accounts concerning the interest rate, the balance sheet clearly showed the jural relationship of debtor and creditor between Meridian and Phoenix, and the existence of financial liability. A dispute about the rate of interest was a dispute about quantum, not about the existence of the debt itself. Moreover, even if the parts payments made by Meridian were to be considered, they would first be appropriated towards interest and then towards principal, meaning a substantial principal remained outstanding.

The promoter companies, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd., separately filed an appeal challenging the admission of the CIRP, arguing there was no subsisting financial debt and that the application was time-barred.

The NCLT rejected Meridian’s limitation objection and admitted the application, appointing an Interim Resolution Professional. The matter was then appealed to the NCLAT, which set aside the NCLT’s order, holding that the financial statements with caveated notes could not amount to an unequivocal acknowledgment under Section 18 of the Limitation Act and that the application was therefore barred by limitation.

Phoenix has now filed an appeal before the Supreme Court of India challenging the NCLAT’s order.

Required:

(c)Meridian contended that it has paid over ₹ 48 crores to Phoenix and that this exceeds the original principal amount. It argued that no principal remains outstanding and therefore there is no financial debt. How did the court reacted with this argument?

June 2026Q. 1(e)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow:

(I)Background:

Phoenix Asset Management Ltd. (Phoenix) is an asset reconstruction company registered under the applicable laws of India. It acquired, by way of an assignment agreement, the outstanding receivables owed by Meridian Hospitality Ltd. (Meridian), a company engaged in the hotel and hospitality business from a consortium of four public sector banks. The assignment took place in January 2009.

Meridian had originally borrowed ₹ 180 crores from the consortium in March 2003 under a term loan agreement. The funds were used for the renovation and expansion of its flagship hotel property. Repayments were irregular from the outset, and by November 2008, the consortium banks collectively classified Meridian’s loan account as a Non-Performing Asset (NPA). Shortly thereafter, the consortium assigned all outstanding receivables to Phoenix.

The shareholding of Meridian was held equally by two promoter entities, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd. each holding a 50% stake. Mr. Rajiv Bhatia served as the Chairman and Managing Director of Meridian as well as of both promoter companies.

(II)Settlement attempts and acknowledgments:

In March 2010, well within three years of the NPA declaration, Meridian wrote to Phoenix proposing a one-time settlement of the outstanding dues. In this letter, Meridian acknowledged that the aggregate outstanding liability, inclusive of principal and interest, stood at ₹ 195 crore as on 31 December 2009. It offered an upfront payment of ₹ 15 crores and committed to clearing the balance in instalments over 18 months.

A formal Settlement Agreement was executed between the parties on 15 April 2010.

Under this agreement, Meridian acknowledged its total liability of ₹ 195 crores, agreed to pay interest at 20% per annum compounded monthly, made an upfront payment of ₹ 15 crores, and committed to clearing the balance by 30 September 2011. Between 2010 and 2013, Meridian made further part payments totalling approximately ₹ 48 crores through various demand drafts and cheques.

However, Meridian repeatedly sought extensions of time to pay the balance. In June 2012, it acknowledged an outstanding liability of ₹ 241 crore (principal and interest combined) and sought extension until March 2013. In September 2013, Phoenix revoked the Settlement Agreement after Meridian defaulted once again.

From the financial year 2009-10 onwards, Meridian’s audited annual financial statements consistently reflected the amounts owed to Phoenix as a liability. However, beginning from the financial statements for the year 2014-15, the notes to the accounts contained a qualification. While the principal amount owed to Phoenix was shown as a liability in the balance sheet, the notes stated that the Settlement Agreement had been revoked by Phoenix and that Meridian had been legally advised the applicable interest rate could not exceed 13% per annum, not the 20% claimed by Phoenix. The notes further stated that the question of the correct rate of interest was pending adjudication before the Debt Recovery Tribunal (DRT).

Phoenix issued a notice under the SARFAESI Act in October 2013 and took symbolic possession of the hotel property in February 2014. Phoenix also invoked the personal guarantee of Mr. Rajiv Bhatia in May 2015.

(III)The IBC, 2016 application and proceedings:

On 10 April 2018, Phoenix filed an application under Section 7(2) of the Insolvency and Bankruptcy Code, 2016 (IBC) before the National Company Law Tribunal (NCLT), seeking initiation of the Corporate Insolvency Resolution Process (CIRP) against Meridian. In its application, Phoenix claimed a principal amount of ₹42 crore and interest of ₹ 178 crores calculated at 20% per annum, bringing the total claim to approximately ₹ 220 crores.

Meridian filed a miscellaneous application before the NCLT seeking dismissal of the petition on the ground that it was barred by limitation. Meridian argued that the NPA was declared in November 2008, that the limitation period of three years expired in November 2011, and that the IBC application filed in April 2018 was hopelessly late by nearly seven years. Meridian further contended that the financial statements contained a clear dispute as to the rate of interest and could not, therefore, be read as an unequivocal acknowledgment of liability sufficient to extend limitation.

Phoenix countered that its application was well within time. It relied on the audited balance sheet of Meridian for the financial year 2014-15, signed by Meridian’s directors on 12 September 2015, which reflected Phoenix as a creditor and acknowledged Meridian’s outstanding financial liability. Phoenix argued that this acknowledgment, made before the original limitation period had expired, created a fresh three-year limitation period running from 12 September 2015 to 12 September 2018. Since the application was filed on 10 April 2018, it was within this extended period.

Phoenix also argued that regardless of the caveats in the notes to accounts concerning the interest rate, the balance sheet clearly showed the jural relationship of debtor and creditor between Meridian and Phoenix, and the existence of financial liability. A dispute about the rate of interest was a dispute about quantum, not about the existence of the debt itself. Moreover, even if the parts payments made by Meridian were to be considered, they would first be appropriated towards interest and then towards principal, meaning a substantial principal remained outstanding.

The promoter companies, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd., separately filed an appeal challenging the admission of the CIRP, arguing there was no subsisting financial debt and that the application was time-barred.

The NCLT rejected Meridian’s limitation objection and admitted the application, appointing an Interim Resolution Professional. The matter was then appealed to the NCLAT, which set aside the NCLT’s order, holding that the financial statements with caveated notes could not amount to an unequivocal acknowledgment under Section 18 of the Limitation Act and that the application was therefore barred by limitation.

Phoenix has now filed an appeal before the Supreme Court of India challenging the NCLAT’s order.

Required:

(e)The promoter companies, Crestwood Hotels and Pinnacle Resorts have also filed an appeal challenging the admission of CIRP against Meridian. They argued that since there was a dispute on existence of financial debt, the NCLT should not have admitted the application. Is this a valid ground to challenge the admission of a Section 7 application?

December 2025Q. 3(a)5 marksSyllabus 2022

(a)The financial creditors initiated the corporate insolvency resolution process (CIRP) against Romi Digital Publications Ltd. (RDPL) under Section 7 of the Insolvency and Bankruptcy Code, 2016, since it defaulted in payment of the dues. Whereas the application for initiation of CIRP before the NCLT was under the ‘pre-admission stage’ the RDPL (the Corporate Debtor)

started the process of settlement talks with the financial creditors.

The RDPL requested before the NCLT that since matter is under negotiation with the financial creditors and likely to settle the matter through compromise with the financial creditors, within a period of 3 months, therefore the initiation of the CIRP may be kept in abeyance.

Whether the NCLT can keep the matter of initiation of CIRP application of the financial creditors in abeyance looking to the fact that the corporate debtors is under the process of negotiations with the financial creditors ? Substantiate your answer with the decided case law.

December 2024Q. 2(b)(i)5 marksSyllabus 2022
Show the facts common to all parts of Q. 2

(b)Jayparan (“Jay” in short), has paid a sum of ₹ 4 crore to RD Developers Private Limited (hereinafter referred as ‘Corporate Debtor’) who was engaged in real estate business. This sum of ₹ 4 crore was paid in 2010 as earnest money against advance sale consideration for booking of a flat. Since there was no progress in the said project until 2014, Jay sought refund of the earnest money following which the Corporate Debtor assured to return the same with interest @ 12% per annum.

Since then, the sum of ₹ 4 crore was mutually treated as unsecured loan and reflected accordingly in the books of the account of the Corporate Debtor. Interest thereon was paid by the Corporate Debtor and TDS was also deducted thereon for which confirmation of books of accounts was periodically sought from Jay. Thus, it was contended that the Corporate Debtor by his own conduct changed the status of the home-buyer to a Financial Creditor.

The Corporate Debtor paid regular interest till FY 2016-17. On the grounds of liquidity and financial crunch, he sought waiver of interest from Jay which request was, however declined.

It is the contention of Mr. Jay that the Corporate Debtor thereafter, defaulted in making interest payment since 1st October, 2017 and continued to default from FY 2017-18 until FY 2020-21 except for part repayment in 2018. It is further submitted that on the demise of Mr.

Jay during October 2018, the loan amount was transferred to the name of his wife, Kushma Jayparan which stands confirmed from the confirmation of account for FY 2019-20 signed by the Directors of the Corporate Debtor.

On account of non-payment of debt, a letter dated 1st February, 2021 was sent by Kushma Jayparan to the Corporate Debtor demanding a sum of ₹ 6.20 crores which included principal amount of ₹ 4.09 crores and ₹ 2.11 crores as interest. Since the amount remained outstanding, on behalf of Jay, his wife filed an application under Section 7 of the IBC on 6th October, 2021 for initiating a Corporate Insolvency Resolution Process (CIRP) against the Corporate Debtor for the default committed.

The learned Counsel of the Corporate Debtor contended that there was no agreement between Jay and the Corporate Debtor with respect to the amount advanced by him and further, the amount paid by Jay is as an Advance amount for buying a flat under development of the Corporate Debtor. Hence, Jay is only a home buyer and not a Financial Creditor of unsecured loans. It is also the contention of the Corporate Debtor that the investment was made by the Jay to receive returns on investment from the Corporate Debtor. Hence, the sum advanced was in the nature of speculative investment and cannot be treated as a financial debt.

The Adjudicating Authority viewed that as no time period was stipulated in the demand notice, it may be held that no default had occurred and also this date fell in the prohibited period under Section 10A of the IBC, 2016. Thus, the Adjudicating Authority held that in both these circumstances, Section 7 application was non-maintainable. Aggrieved with the findings of the Adjudicating Authority, the wife of Jay preferred an appeal before the National Company Law Appellate Tribunal.

Referring to the relevant case laws and the applicable provisions of the IBC, 2016 and the Regulations made thereunder, answer the following questions :

(i)State with reasons whether Kushma Jayparan will succeed in her appeal ?

June 2024Q. 2(c)(i)5 marks for the whole sub-partSyllabus 2022
Show the facts common to all parts of Q. 2

(c)Panapathi G. Seeds Pvt. Ltd. a closely held private company was engaged in the business of processing oilseeds for edible oils. It was established in 1988 under the leadership of Panapathi G. Prasad. Within a decade, Panapathi G. Seeds Pvt. Ltd positioned itself as a leader in production of groundnut oil in the Western region of India with two premium brands.

In 2016 Panapathi G. Prasad had a severe heart attack and died without any succession plan in place. Ram and Sham, the two sons of Panapathi G. Prasad were also directors in the company with equal shareholding. After the death of Panapathi G. Prasad, both brothers had strained relations over the management control which adversely affected the business of the company. With declining profit and turnover both the brothers were worried and decided to reach a family settlement whereby the control of the company was handed over to the elder brother Ram. Sham resigned as the director of the company and in lieu of the same he was entrusted with the management and control of another family firm Saraswathi Edibles, wherein both brothers were partners. Praveen, son of Ram was inducted as director in the Company.

In 2018 Sham wanted to withdraw unsecured loan given by him to the company because the company stopped paying him interest on the loan. Despite follow up Sham was not paid either the principal or interest, which forced him to file an application under section 7 of the Insolvency and Bankruptcy Code 2016.

The Adjudicating Authority (i) admitted the application, (ii) declared moratorium and (iii)

appointed Nagarajan, as an Interim Resolution Professional (IRP). Ram refused to hand over the management control to the IRP on the plea that it was a family dispute, and they will settle soon on their own. He also asked the IRP not to make the public announcement.

IRP tried to persuade Ram citing the provisions of the Code and warned him that if he does not hand over control of the Corporate Debtor IRP will be forced to approach the Adjudicating Authority for appropriate orders. Thereafter Ram allowed the IRP to take inventory of the assets and stocks after 15 days from the insolvency commencement date.

With reference to the above facts and other details provided, answer the following questions with particular reference to the provisions contained in the Code, Regulations and rules of IBC and others :

(i)Sophie Bank, the only Bank with whom the Company is banking, filed an appeal before the National Company Law Appellate Tribunal (NCLAT) to set aside the order of Adjudicating Authority regarding admission of CIRP on the ground that its cash credit account with the company is regular and there is no default. Will the application of Sophie Bank survive ?

June 2022Q. 3(a)6 marksSyllabus 2017

(a)A Bank extended credit facility to M/s. Jaiveer Construction (JC), a proprietary firm of the appellant. The loan amount was disbursed to JC, the Principal Borrower. Gupta Foods Ltd. (GFL), of which the appellant is also a Promoter/ Director, had offered guarantee to the loan accounts of JC, the Principal Borrower.

The loan accounts of JC were declared NPA on 30th January, 2011.

During the pendency of the stated action initiated by the Financial Creditor (FC), JC the Principal Borrower had repeatedly assured to pay the outstanding amount, but the commitment remained unfulfilled.

The FC eventually wrote to GFL in December, 2018 in the form of a purported notice of payment. The GFL replied to the said notice of demand vide letter dated 8th January, 2019, inter alia, clarifying that it was not the Principal Borrower, nor owed any financial debt to the financial creditor and had not committed any default in repayment of the stated outstanding amount.

The FC then proceeded to file an application on 23rd March, 2019 under Section 7 of the Code for initiating Corporate Insolvency Resolution Proceeding (CIRP)

against the GFL, before the National Company Law Tribunal (NCLT). This application came to be resisted on diverse counts and in particular, on the preliminary ground that it was not maintainable because the Principal Borrower was not a ‘‘Corporate Person’’; and further, it was barred by limitation, as the date of default was 30th January, 2011, whereas, the application had been filed on 23rd March, 2019 i.e., beyond the period of three years.

Examine in light of decided case, whether two objections made by GFL were sustainable or not?

June 2021Q. 1(a)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the following carefully and answer the questions given at the end :

Pine Food Industries Limited (“PFIL”) is one of the top FMCG player and listed entity in India. It is a leading manufacturer and marketer of various edible oils, food products and eatables. Its Authorized Capital is Rs. 252.00 crore and Paid-up Capital is Rs.

65.00 crore. PFIL has borrowed from various Banks and Financial institutions in India and its borrowings were around Rs. 12,000 Crore.

Due to unprecedented crash in global prices of the oil seeds coupled with falling revenues in the oil business gave a crippling blow to PFIL.

AB Bank and BC Bank filed an application under section 7 of the Insolvency and Bankruptcy Code, 2016 (“Code”) for initiating the insolvency resolution process against PFIL (hereinafter called as the Corporate Debtor (“CD”)). After hearing both the parties, National Company Law Tribunal (“NCLT”) admitted the petition filed. The Financial Creditor proposed the name of Kapoor to act as Interim Resolution Professional (“IRP”).

An application was filed before NCLT by one of the creditors who made a claim before the Resolution Professional (“RP”) stating that the CD owed to pay USD 10.00 crore, based on the Bills of Exchanges, ordering the CD to pay this creditor for the goods supplied by another party. On making of such claim before the RP, it has been rejected by him saying that it is not a Financial Debt as it is an Operational Debt therefore, it could not be considered as Financial Debt as claimed by applicant therein.

Vijay Kumar Jain, suspended Director of the CD, filed an application before the NCLT under section 60(5) of the Code seeking an order for setting aside the decision taken by the Committee of Creditors (“CoC”) disallowing the erstwhile representatives of the Corporate Debtor including Vijay to participate in the CoC meetings; declare that the CoC meeting is non est; direct the RP to ensure active participation of the applicant in the meetings of CoC; provide all the documents and information to the applicant.

RP filed application in NCLT under section 43(1) of the Code for seeking reversal of the amounts that were debited from the current accounts of the CD maintained with XYZ Bank which had been debited by the XYZ Bank before the insolvency commencement date and were utilized against the payment of the dues owed by the CD to a Bank in relation to the Letter of Credit issued by them.

The RP submits that the payment of the impugned amount lead to preferential treatment towards XYZ Bank by the CD as such payment has the effect of putting Respondents (i.e. XYZ Bank) in a beneficial position than it would have been in liquidation of the CD in accordance with Section 53 of the Code. It is further stated by the RP that the payments of the impugned amount by the Corporate Debtor were not in the “ordinary course of business” of the CD.

NCLT, vide its order, held that the respondent Bank, which had debited an amount aggregating to Rs. 65.98 crores from the current accounts of the Corporate Debtor is directed to reverse the said amount within 30 days from the date of the said order.

Since the resolution plan is already submitted and under examination of the CoC without consideration of this amount, therefore the appropriation of this amount will be decided by the CoC. XYZ Bank filed appeal in NCLAT against the order of NCLT.

The main plea taken by the Appellant Bank is that the RP before filing an application under Section 43(1) of the Code formed no independent opinion nor afforded an opportunity to the Appellant to explain about the transactions in question.

The RP called for Expression of Interest (“EOI”). 28 prospective resolution applicants showed their interest out of which two prospective resolution applicants were rejected as one was disqualified under Section 29 A of the Code (being related party) and the other was a financial investor who did not meet the criteria in the EOI evaluation parameters.

The applicant reviewed the four Resolution Plans submitted by the Resolution Applicants and found that only the plans submitted by 2 Resolution Applicants (RA1 and RA2) provided for the corporate insolvency resolution of the Corporate Debtor as a whole and on a going concern basis.

The RP filed application under section 30(6) of the Code, seeking order for approval of the resolution plan for the Corporate Debtor submitted by the consortium led by PAL (RA2) as approved by the members of Committee of Creditors (CoC). The said resolution plan was approved by a vote share of 96.85%. RP filed application in NCLT for approval of Resolution Plan.

While the said application was pending for consideration before the NCLT, Hon’ble Supreme Court, in Vijay Kumar Jain Vs. Standard Chartered Bank & Ors pronounced the judgment. Under the Judgment of Hon’ble Supreme Court, the approval of the NCLT to the resolution plan of RA2 was interdicted. In compliance of the above-mentioned Hon'ble Supreme Court order, NCLT by its order directed as follows :

“Resolution Professional is directed to comply with the directions of the Hon’ble Supreme Court and submit the report within the stipulated time as provided by the Hon'ble Supreme Court.”

Thereafter, NCLT approved the Resolution Plan submitted by RA2 and passed orders and directions on the reliefs and concession sought.

Since in Para 38, NCLT in their order rejected some of the relief sought, RA2 moved to NCLT for modification of order of NCLT.

In the application filed, RA2 had sought substitution of Para 38 of the order of NCLT approving the Resolution Plan of RA2 as under :

Existing Para “38. Any relief sought for in the Resolution Plan, where the contract/agreement/ understanding/ proceedings/actions/notice etc is not specifically identified or is for future and contingent liability, is at this moment rejected.”

Proposed Para “All claims that were either not filed or not admitted during CIRP in terms of the provisions of the Insolvency and Bankruptcy Code, 2016 shall stand extinguished.

Further, claims admitted/ verified by the Resolution Professional shall stand settled and extinguished as per the Resolution Plan.”

Resolution Plan approved by NCLT of RA2 leads to a 60% haircut for the lenders.

RA2 completed its acquisition of PFIL.

Referring decided case and relevant provisions of the Insolvency and Bankruptcy Code (IBC), 2016 and Rules and Regulations made thereunder, answer the following questions :

(a)Whether formation of Joint Lender Forum will have any bearing over filing of this case or not ? Brief, referring the provisions of IBC, 2016, who can initiate the case under the Code.

June 2021Q. 2(a)6 marksSyllabus 2017

(a)ABC Housing Ltd had initiated Corporate Insolvency Resolution Process against XYZ Infrastructure Ltd. (Corporate Debtor) under Section 7 of the Insolvency and Bankruptcy Code, 2016. The National Company Law Tribunal has dismissed the application as not maintainable in view of the fact that the winding-up proceeding against the Corporate Debtor had already been initiated by the High Court. Referring relevant case explain whether an application under Section 7 of the Code is maintainable when windingup proceeding against the Corporate Debtor has already been initiated ?

December 2020Q. 2(a)6 marksSyllabus 2017

(a)One of the leading Bank granted credit facility to Invent Ltd. and on default in making repayment by the Company, the Bank filed an application for initiation Corporate Insolvency Resolution Process (CIRP). Before the National Company Law Tribunal (NCLT), the Company argued that as its liabilities stood suspended pursuant to a relief order passed by Government of Maharashtra under Maharashtra Relief Undertaking (Special Provisions Act), 1958 (MRU Act) no amounts were due and payable byit to Bank and hence, the application for CIRP under the Insolvency and Bankruptcy Code, 2016 (IBC, 2016) could not be admitted. Under the MRU Act, the State Government may take over management of undertaking and impose moratorium in the same manner as contained in IBC, 2016.

Examine in the light of decided case, whether the CIRP application filed by the Bank under IBC, 2016 will prevail?

June 2021Q. 4(b)6 marksSyllabus 2017

(b)A Financial Creditor filed an Application for a declaration that the Resolution Applicant, ABC Ltd and its promoters have knowingly contravened the terms of the resolution plan, having failed to implement the same and for the reinstatement of the Committee of Creditors (CoC) to run the Corporate Debtor, as a going concern. Referring relevant case explain whether the Financial Creditor will succeed.

December 2019Q. 5(b)4 marksSyllabus 2017

(b)What will be the consequence if Demand of Debt is disputed ?

December 2024Q. 1(ii)5 marksSyllabus 2017
Show the facts common to all parts of Q. 1

COB Bank filed an application under Section 7 of the Insolvency and Bankruptcy Code, 2016 (IBC) for initiating a Corporate Insolvency Resolution Process (CIRP) against the Corporate Debtor, M/s. Gupta Infra Private Limited (GIPL). The said application was admitted by the Adjudicating Authority (AA) during October, 2018 and a Resolution Professional (RP) was appointed as an Interim Resolution Professional (IRP).

Following is the financial position of GIPL as on the date of commencement of the CIRP :

Liabilities Amount in Assets Amount in ₹

₹ Crores Crores

Share Capital – Equity 100.00 Fixed Assets – Land and 115.00

Building

Share Capital – Redeemable 75.00 Fixed Assets – Plant and 165.00 Preference Shares Machinery Share Capital – Convertible 25.00 Other Fixed Assets 70.00 Preference Shares Debentures (Unsecured fully 50.00 Investments in Subsidiaries 50.00 convertible)

Long Term Borrowings – Fully 300.00 Inventories 150.00 Secured Short Term Borrowings – Unsecured 75.00 Receivables 110.00 Loan from Related Parties 25.00 Cash and Bank Balances 15.00 Payables 65.00 Other Current Assets 25.00 Provisions 35.00 Accumulated Losses 100.00 Deferred Tax Liabilities 15.00 Other Current Liabilities 35.00 Total Liabilities 800.00 Total Assets 800.00 Other Additional information provided by the Corporate Debtor :

[Amounts stated in the table above can be treated as claims made by each of the parties in their respective category].

Other Current Liabilities include :

₹ In Crores

Workmen Wages Payable for 36 months 9.00 Salary Payable for 20 months 100.00 PF Liabilities 3.80 Sales Tax/Commercial Taxes Due * 4.80 Other Statutory Dues 2.40

* On the sales tax and commercial taxes due, the Commercial Tax Authorities have already attached one of the immovable properties of the Corporate Debtor valued at ₹ 3.50 crores.

Fixed Assets includes buildings occupied on long term lease for a period of 75 years obtained from the State Industrial Development Authority (SIDA) for ₹ 5 Crores. SIDA has also submitted their claim with the RP stating that their premium amount along with interest and penal interest is due for since last 7 years. SIDA has filed its claim as a Financial Creditor. Whereas, the Resolution Professional has requested SIDA to submit its claim as an Operational Creditor. (This amount is included in Other Current Liabilities).

Further, it was informed by the Resolution Professional that the Corporate Debtor, M/s. Gupta Infra Private Limited, who initiated a CIRP against one of its Operational Creditor, namely C-Digital Arts Private Ltd for ₹ 6 Crores and going forward, the National Company Law Tribunal (NCLT) has already ordered for initiation of Corporate Insolvency Resolution Process (CIRP). However, one of the suspended Director on the Board of C-Digital Arts Private Limited filed an appeal before the National Company Law Appellate Tribunal (NCLAT) stating that there was no notice given as required under Section 8 of the Insolvency and Bankruptcy Code, 2016 read with Rule 5 of the insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016 which entails that for initiation of insolvency resolution process by an Operational Creditor, a demand notice has to be served by the unpaid Operational Debtor on the Corporate Creditor. Nevertheless, the aforesaid suspended director he has not denied the debts due. This matter is pending before NCLAT for disposal.

Investments includes investment in Foreign Subsidiary of ₹ 30 Crores and in an Indian Subsidiary of ₹ 18 Crores and Investment in shares amounting to ₹ 2 Crores in another company incorporated and registered with charitable objects and not for profit.

Inventories and Receivables realisable only for 80% of its value.

Loan from related parties is from wife and son of one Director of GIPL.

Other Current Assets includes ₹ 10 Crores paid to National Highway Authority of India (NHAI) towards a bid amount for a road project.

Other Current Assets includes ₹ 2 Crores of assets of third party held under Trust. Machinery, the carrying value of which is ₹ 1.50 crores belonging to an Indian Subsidiary is lying in one of the Units of the Corporate Debtor.

A Machinery which was acquired for dispatching to the Foreign Subsidiary is also lying in the factory premises of the Corporate Debtor having a carrying value of ₹ 3 crores.

Cranes worth ₹ 5 Crores belonging to a proprietorship concern of one of the Director is also lying the Factory premises of the Corporate Debtor.

CIRP costs payable including all expenses is ₹ 2 Crores.

The Security Interest charged for COB Bank is 91.25% and SID Bank is 8.75%. (both the financial creditors have not relinquished their security interest).

During the CIRP, in one of the Meeting of the ‘Committee of Creditors’ (CoC), Resolution Plans were discussed. Revised Resolution Plans were submitted by the prospective Resolution Applicants.

Resolution Plan was put to e-Vote and by majority of 94.79%, the Resolution Plan of ‘GIPL’ was approved.

The Resolution plan proposes for utilisation of all assets including the assets under lease. Further, the Resolution Professional has sent a letter to the Commercial Taxes Authorities to release the property attached by them and on the contrary, the Authorities informed that the Department will get their portion as per the proposed Resolution Plan.

One of the Financial Creditor (SID Bank) sent an objection with respect to the distribution of the proceeds of the resolution plan under the Resolution Plan.

SID Bank also filed seeking direction to the Resolution Professional to distribute the proceeds of the Resolution Plan and made the following prayers :

“It is most respectfully prayed that :

1.The present application may kindly be allowed and the directions be issued to the Respondent No. 1 to modify/clarify the distribution to dissenting members as per the Resolution Plan and distribute the proceeds of the resolution plan to the Applicant SID Bank, for an amount of ₹ 8.97 Crores in priority in accordance with provisions of IBC, 2016 in the interest of justice and equity.

2.Interim stay be granted on distribution of the resolution plan amount by the Resolution Professional to the Committee of Creditors till the present application is decided.”

The case of the Appellant, namely SID Bank in the Application was that, as per the security interest of the Appellant, the Appellant is entitled to 8.75% i.e. the amount of ₹ 8.97 Crores and as per voting share as approved by the CoC, the Appellant is entitled to 5.21% i.e., ₹ 5.34 Crores. The case of the Appellant SID Bank set up in the Application is that he is entitled for his distribution of plan amount as per value of the security interest of the Appellant.

The Application was objected by the Resolution Professional. The Adjudicating Authority, by its Order, upheld the decision of the CoC for distribution of proceeds of the Resolution Plan as per the voting share. The Appellant, aggrieved by the said Order, has come up with the Appeal to the National Company Law Appellate Tribunal (NCLAT).

In the light of the above case study inputs and referring to the decisions of applicable case laws with reasons and the provisions of Insolvency and Bankruptcy Code, 2016 (IBC, 2016) and the Regulations made thereunder, answer the following questions :

(ii)In the given case study, it is stated that though the Corporate Debtor has succeeded in initiating the CIRP against one of its Operational Creditor, namely C-Digital Arts Pvt Ltd, nevertheless, an appeal has been preferred before the NCLAT by one of the suspended director on the Board of the aforesaid Operational Creditor contending that notice as required under IBC, 2016 was not served by the Corporate Debtor. Referring to the applicable case laws, state whether the Corporate Debtor will succeed in the appeal filed by a suspended Director of the Operational Creditor ?

December 2020Q. 5(a)6 marksSyllabus 2017

(a)The M Ltd. (Corporate Debtor - CD) was engaged by ‘BB’ TV for conducting tele-voting for one of its prime program. M Ltd. in turn sub-contracted the work to the K Ltd. (Operational Creditor - OC) and issued purchase orders between October and December, 2013 in favour of the K Ltd.

The bills so raised were payable within 30 days of receipt by the M Ltd. It is pertinent to note here that a Non-Disclosure Agreement (NDA) was executed between the parties (CD and OC) on 26th December, 2014 with effect from 1st November, 2013. In view of non-payment of dues, a demand notice dated 23rd December, 2016 was sent by the OC under Section 8 of Insolvency and Bankruptcy Code, 2016. To this notice, the CD responded that there exists serious and bona fide disputes between the parties and that nothing was payable as the OC had been told on 30th January, 2015 that no amount would be paid to the OC since it had breached the NDA.

Based on the above facts examine by quoting relevant case, if any whether breach of Non-Disclosure Agreement amounts to default ?

December 2024Q. 4(b)(i)6 marks for the whole sub-partSyllabus 2017
Show the facts common to all parts of Q. 4

(b)SMS Enterprises Private Limited (Operational Creditor) has filed the present petition under Section 9 of the Insolvency and Bankruptcy Code, 2016 with a prayer to initiate the CIRP against Kaj Tiles Private Limited (Hereinafter referred as ‘Kaj Tiles’).

The Applicant Operational Creditor has claimed the alleged debt on account of the accumulated stocks due to discontinuance/prevention of the supply of goods to the dealers of the Operational Creditor, which it had been doing pursuant to the Distributorship Agreement executed between the Kaj Tiles and SMS Enterprises (through its proprietor Mittu).

As per Kaj Tiles, the said Distributorship Agreement clearly prohibited Mittu (SMS Enterprises)

from transferring or assigning the same or any part thereof without the prior written consent in terms one of the clauses of the Distributorship Agreement. The Applicant Operational Creditor, in its rejoinder has admitted that the proprietorship was transferred into a Private Limited Company by virtue of an “Amalgamation Agreement” entered between M/s SMS Enterprises (Proprietorship Concern) and M/s SMS Enterprises Private Limited and the aforesaid Distributorship Agreement never prohibited the transfer of business or assigning of actionable claims. The Petitioner Operational Creditor being a Company is pursuing debt on behalf of the proprietorship firm.

In the light of the above case study inputs, answer the following questions :

(i)Whether SMS Enterprises Private Limited can file an application in compliance with the relevant provisions of the IBC, 2016 in terms of the Distributorship Agreement entered by SMS Enterprises ?

June 2021Q. 4(a)6 marksSyllabus 2017

(a)A German Company (Operational Creditor) filed application under Section 9 of the Insolvency and Bankruptcy Code, 2016 against PQR Private Limited (Corporate Debtor) alleging that the ‘Corporate Debtor’ committed default in making the payment of certain operational dues. The Adjudicating Authority (National Company Law Tribunal), admitted the application. Before, National Company Law Appellate Tribunal (NCLAT), the Corporate Debtor has raised the question of jurisdiction of the National Company Law Tribunal in entertaining the application Under Section 9 of the IBC, 2016. The Corporate Debtor referred to the Agreement reached between the parties and submitted that as per the Agreement and as the Office of the Respondent is in Germany, any suit or case is maintainable only in the Courts at Germany. No case can be filed in any Court in India. Discuss with reasoning whether the contention of the Corporate Debtor is correct.

December 2022Q. 2(b)3 marksSyllabus 2017
Show the facts common to all parts of Q. 2

Ruby and Emerald Pvt. Ltd (REPL), incorporated on 1st April, 2013 has its registered office in Surat. Gems and Gems Pvt. Ltd (GGPL), incorporated on 11th September, 2014 has its registered office in Jaipur. REPL was approached by GGPL for procuring its goods which can be used as raw material in the factory of REPL. It was agreed through a contract between REPL and GGPL that upon procurement of the goods entire payment shall be made by REPL within 10 days of issuance of the tax invoice.

The transaction was smoothly going between REPL and GGPL without any delays in supply of goods and payment. Owner of REPL died due to cardiac arrest and the business operations of REPL were severely affected. REPL started supplying faulty goods to its customers and the quality of raw material being supplied by the suppliers also deteriorated gradually. As on 2nd January, 2021, there were no dues outstanding towards GGPL and balance confirmation from GGPL was also taken by REPL.

However, between 3rd January, 2021 and 31st May, 2021 various transactions happened between REPL and GGPL. GGPL requested for the payments multiple times for such transaction between 3rd January, 2021 and 31st May, 2021; however, GGPL kept supplying goods in good faith based on relationship with REPL. REPL neither responded to requestsof GGPL nor stopped buying goods from them. Because of the long overdue from REPL, GGPL sent a demand notice on 16th June, 2021 through their lawyer to make the payment of entire outstanding to the tune of ‘ 1,25,00,000/- exclusive of interest @ 15% p.a. within 10 days from the receipt of the notice, failing which GGPL will take suitable actions under the law. No communication whatsoever was received from REPL. Therefore, as per the directions of the lawyer, GGPL filed an application to initiate Corporate Insolvency Resolution Process (CIRP)

against REPL. Also, they have sent a letter to the power company to disconnect the supply of electricity to REPL considering that they are not in a position to pay their dues Considering the above facts answer the following questions :

(b)GGPL missed to mention the name of Interim Resolution Professional (IRP) in its application. Can this mistake lead to rejection of their application ?

June 2022Q. 2(b)6 marksSyllabus 2017

(b)Solver Ltd., the Operational Creditor (OC), supplied Jute bags to Atren Ltd., the Corporate Debtor (CD) through 12 invoices for ₹78.63 lakh during a period of May 2015 to November 2016.

The OC claimed its amount from the date of acknowledgement i.e. 12th December, 2017 with interest. The CD sent a Legal Notice (Notice of Dispute) on 20th September, 2018 after that it was assured that the outstanding amount will be paid within a month, but no outstanding debt was paid. It also mentioned that past payments and return of material were not factored in raising the demand.

The OC raised demand notice under Section 8 of the IBC again on 12th October, 2018 which was delivered on 27th October, 2018. The CD sent a reply on 31st October, 2018 to the aforesaid demand notice wherein it mentioned that the material worth ₹10.65 lakh were returned on 23rd June, 2017, owing to the quality issue and the same were duly received and acknowledged by the Operational Creditor, so dispute was raised.

The National Company Law Tribunal (NCLT) rejected the application of OC. The OC referred the matter before the National Company Law Appellate Tribunal (NCLAT). Referring the relevant case, explain whether the OC will succeed before NCLAT ?

June 2026Q. 1(d)5 marksSyllabus 2022
Show the facts common to all parts of Q. 1

Read the following case study and answer the questions that follow:

(I)Background:

Phoenix Asset Management Ltd. (Phoenix) is an asset reconstruction company registered under the applicable laws of India. It acquired, by way of an assignment agreement, the outstanding receivables owed by Meridian Hospitality Ltd. (Meridian), a company engaged in the hotel and hospitality business from a consortium of four public sector banks. The assignment took place in January 2009.

Meridian had originally borrowed ₹ 180 crores from the consortium in March 2003 under a term loan agreement. The funds were used for the renovation and expansion of its flagship hotel property. Repayments were irregular from the outset, and by November 2008, the consortium banks collectively classified Meridian’s loan account as a Non-Performing Asset (NPA). Shortly thereafter, the consortium assigned all outstanding receivables to Phoenix.

The shareholding of Meridian was held equally by two promoter entities, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd. each holding a 50% stake. Mr. Rajiv Bhatia served as the Chairman and Managing Director of Meridian as well as of both promoter companies.

(II)Settlement attempts and acknowledgments:

In March 2010, well within three years of the NPA declaration, Meridian wrote to Phoenix proposing a one-time settlement of the outstanding dues. In this letter, Meridian acknowledged that the aggregate outstanding liability, inclusive of principal and interest, stood at ₹ 195 crore as on 31 December 2009. It offered an upfront payment of ₹ 15 crores and committed to clearing the balance in instalments over 18 months.

A formal Settlement Agreement was executed between the parties on 15 April 2010.

Under this agreement, Meridian acknowledged its total liability of ₹ 195 crores, agreed to pay interest at 20% per annum compounded monthly, made an upfront payment of ₹ 15 crores, and committed to clearing the balance by 30 September 2011. Between 2010 and 2013, Meridian made further part payments totalling approximately ₹ 48 crores through various demand drafts and cheques.

However, Meridian repeatedly sought extensions of time to pay the balance. In June 2012, it acknowledged an outstanding liability of ₹ 241 crore (principal and interest combined) and sought extension until March 2013. In September 2013, Phoenix revoked the Settlement Agreement after Meridian defaulted once again.

From the financial year 2009-10 onwards, Meridian’s audited annual financial statements consistently reflected the amounts owed to Phoenix as a liability. However, beginning from the financial statements for the year 2014-15, the notes to the accounts contained a qualification. While the principal amount owed to Phoenix was shown as a liability in the balance sheet, the notes stated that the Settlement Agreement had been revoked by Phoenix and that Meridian had been legally advised the applicable interest rate could not exceed 13% per annum, not the 20% claimed by Phoenix. The notes further stated that the question of the correct rate of interest was pending adjudication before the Debt Recovery Tribunal (DRT).

Phoenix issued a notice under the SARFAESI Act in October 2013 and took symbolic possession of the hotel property in February 2014. Phoenix also invoked the personal guarantee of Mr. Rajiv Bhatia in May 2015.

(III)The IBC, 2016 application and proceedings:

On 10 April 2018, Phoenix filed an application under Section 7(2) of the Insolvency and Bankruptcy Code, 2016 (IBC) before the National Company Law Tribunal (NCLT), seeking initiation of the Corporate Insolvency Resolution Process (CIRP) against Meridian. In its application, Phoenix claimed a principal amount of ₹42 crore and interest of ₹ 178 crores calculated at 20% per annum, bringing the total claim to approximately ₹ 220 crores.

Meridian filed a miscellaneous application before the NCLT seeking dismissal of the petition on the ground that it was barred by limitation. Meridian argued that the NPA was declared in November 2008, that the limitation period of three years expired in November 2011, and that the IBC application filed in April 2018 was hopelessly late by nearly seven years. Meridian further contended that the financial statements contained a clear dispute as to the rate of interest and could not, therefore, be read as an unequivocal acknowledgment of liability sufficient to extend limitation.

Phoenix countered that its application was well within time. It relied on the audited balance sheet of Meridian for the financial year 2014-15, signed by Meridian’s directors on 12 September 2015, which reflected Phoenix as a creditor and acknowledged Meridian’s outstanding financial liability. Phoenix argued that this acknowledgment, made before the original limitation period had expired, created a fresh three-year limitation period running from 12 September 2015 to 12 September 2018. Since the application was filed on 10 April 2018, it was within this extended period.

Phoenix also argued that regardless of the caveats in the notes to accounts concerning the interest rate, the balance sheet clearly showed the jural relationship of debtor and creditor between Meridian and Phoenix, and the existence of financial liability. A dispute about the rate of interest was a dispute about quantum, not about the existence of the debt itself. Moreover, even if the parts payments made by Meridian were to be considered, they would first be appropriated towards interest and then towards principal, meaning a substantial principal remained outstanding.

The promoter companies, Crestwood Hotels Pvt. Ltd. and Pinnacle Resorts Ltd., separately filed an appeal challenging the admission of the CIRP, arguing there was no subsisting financial debt and that the application was time-barred.

The NCLT rejected Meridian’s limitation objection and admitted the application, appointing an Interim Resolution Professional. The matter was then appealed to the NCLAT, which set aside the NCLT’s order, holding that the financial statements with caveated notes could not amount to an unequivocal acknowledgment under Section 18 of the Limitation Act and that the application was therefore barred by limitation.

Phoenix has now filed an appeal before the Supreme Court of India challenging the NCLAT’s order.

Required:

(d)The NCLAT set aside the NCLT’s order admitting the CIRP on the ground that the application was time-barred. Phoenix argued that the IBC is a beneficial legislation and must be construed liberally. Does the IBC as a beneficial statute have any bearing on how the law of limitation is applied to it?

June 2024Q. 2(d)5 marksSyllabus 2022

(d)Whether the legislative scheme that is contained in section 7 and section 9 of IBC, differentiating between financial creditors and operational creditors respectively as regards the Code’s objectives and notice on default, are discriminatory and arbitrary ? Substantiate your answer with the relevant case law.

December 2022Q. 1(d)10 marksSyllabus 2017
Show the facts common to all parts of Q. 1

Read the case study carefully and answer the questions given at the end :

JCP Industries Ltd (JIL) was incorporated in the year 2011 with an authorized share capital of ₹2,000 crore having its registered office located in Mumbai with the main objects to carry out the business (a) manufacturing of heavy duty earth moving machinery and their spare parts (b) purchase, sale, construction of multi-story commercial and residential apartments under own name or as under Joint Development Agreements (c) Mining of minerals and thereafter refining and processing them for sale; and (d) doing the business in the hospitality sector by running and maintaining Hotels, Resorts and Budget Hotels. The paid-up share capital of the company as on date is ₹1,750 crore.

During the course of business, the company has approached various banks, state finance corporations and NBFCs for availing financial assistance in the nature of term loans and other facilities. However, based on the business plans and security offered, the finance proposal was approved by National Bank of India (the Bank) in the form of both fund based and non-fund based limits. The company during the course of its business operations was also availing credit for 90 days to 120 days from its creditors in connection with the purchase of raw material being used in the business of manufacturing heavy duty earth moving machineries, real estate, mining and hospitality sectors. The progress of the company since its incorporation till 31st March, 2019 was exceptional. However, because of certain transactions carried out by the directors with their relatives and other parties between 1st July, 2020 to 30th June, 2021 which were in the nature purchase of raw-material for different business segments of the company including the purchase of immovable properties as well as transferring and sale of goods and assets of the company to such related and other parties by givingthem preference over the other buyers ultimately resulted into mismatch in the cash flows and consequently resulted into losses to the company.

With an intention to grow organically, the company also incorporated a wholly owned subsidiary in the year 2017 under the name of JCP Buildcon Ltd (JAL) which was mainly engaged in the real estate business involving construction of apartments and flats in multi-story buildings under the Joint Development Agreements being entered into with the various parties including various State Governments under Housing Schemes. JAL entered into a tripartite Joint Development Agreement with Jaipur Development Authority (JDA) for construction of apartments and flats in multi-story buildings after development of land belonging to JDA. In an attempt to extend support to JIL, JAL had also mortgaged its assets in favour of banks in the month of August, 2018 when additional financial assistance was provided to JIL.

The financial condition of JIL started deteriorating after July, 2019 because of reduction in the business activities as well as default being committed in honoring the debt obligations towards banks, payment to trade creditors and delays in construction of apartments to be handed over to the buyers who had entered into agreements with the company and have paid almost 95% of the cost of the apartment.

The banks, trade creditors and buyers of the flats were constantly making follow up with the management but no reply was given to them by the management of JIL as well as JAL. National Bank of India during their internal review meeting informed their legal team that the promoter/directors may have siphoned off the money which was supposed to have been used for business purposes; since it appears to them that the amounts have been advanced to related parties and diverted towards a few suspicious transactions.

The bank despite the continuous follow up with the management and the Board of directors could not get any suitable response relating to the repayment plan to honor the debt obligations.

Considering the situation and based on the recommendation of their legal department, the bank decided to take action against the company under the Insolvency and Bankruptcy Code, 2016 (the Code) and thus filed an application on 16th February, 2022 before the Adjudicating Authority (AA) for initiating Corporate Insolvency Resolution Process (CIRP). In the application, the Bank had proposed name of Robin to act as Interim Resolution Professional (IRP). Simultaneously, other lenders of JAL also submitted an application before the AA to initiate CIRP against JAL for default in repayment of their dues.

After hearing the parties, the AA admitted the applications in the case of JIL and JAL on 25th April, 2022 and also confirmed the appointment of Robin as IRP in both the companies. In the case of JIL, Robin constituted a Committee of Creditors (CoC) on 15th May, 2022 and called first meeting of the CoC on 20th May, 2022. The constitution of CoC by Robin was challenged by the operational creditors as well as home buyers since their name was not included in the list of the CoC. Further, the members of the suspended Board of directors of JIL also challenged the actions of Robin who did not allow their participation in the first meeting of the CoC.

During the first meeting of the CoC in the case of JIL, Robin was confirmed to act as Resolution Professional (RP) by the CoC and was asked to invite the Expression of Interest (EoI) from the Resolution Applicants (RA) for submitting Resolution Plan.

Besides the above, JDA has also issued notice to JAL for taking over possession of the land given for the purpose of construction.

Considering the above facts answer the following questions :

(d)Examine the correctness of the following statements by giving brief reasons in respect of each of the following independent cases in the context of facts in the aforesaid case study, provisions of the Code as well as the decided case laws :

(i)Role of the RP is adjudicatory in nature.

(ii)The CoC can have sub-committees and can also delegate the power to approve the resolution plan.

(iii)There is no demarcation between the Secured and Unsecured, Financial and the Operational creditors under the Code.

(iv)The objection raised by the members of the suspended Board of directors to include them in CoC and to get the copy of resolution plan of the company is not maintainable.

June 2019Q. 4(b)6 marksSyllabus 2017

(b)An application for Corporate Insolvency Resolution Process (CIRP) was filed by a Bank (being Financial Creditor) against RSI Ltd, which was admitted by the NCLT and an Interim Resolution Professional was appointed, the Committee of Creditors (CoC) was constituted. Vijay, who was a member of the suspended Board of Directors of RSI Ltd was neither allowed participation in CoC nor any information considered confidential was given, either by the resolution professional or the Committee of Creditors. Vijay made representations before the Adjudicating Authority to attend the meeting and for information/documents. Will Vijay succeed in his claim for attending the Meeting of Committee of Creditors and obtaining information about the CoC proceedings.

No questions in this chapter match these filters.

Also relevant to this chapter